• Title/Summary/Keyword: Mega Project

Search Result 101, Processing Time 0.025 seconds

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

Investment Analysis in the Hydroelectric Power Sector of the Lao People's Democratic Republic (Lao PDR)

  • Nantharath, Phouthakannha;Kang, Eun-Goo;Hwang, Hee-Joong
    • Journal of Distribution Science
    • /
    • v.14 no.8
    • /
    • pp.5-8
    • /
    • 2016
  • Purpose - With its considerable water resources, Lao People's Democratic Republic, hereafter Lao PDR, is considered to become the "battery" of the Southeast Asia region in the next 20 years. This paper explores the investment opportunity in the hydroelectricity development project in the Lao PDR. Research design, data, and methodology - Three significant investment factors including cultural factor, political factors, and economic factors are being literally analyzed. In fulfilling the purpose of this analysis, Num Theun 2 Power Company or NTPC, a current largest hydropower project in the country, is selected for an example of a mega investment project model in the country. Results - NTPC's investment plan, budgets, and current revenue and rate of return are briefly discussed throughout the paper. In addition, this paper also briefly compares and contrasts of the investment in the Lao PDR and investment in its neighboring Singapore who is considered one of the leading developed economies in the region. Conclusions - A recommendation is being proposed on the last section of this paper in the areas that Lao PDR may consider adopting in order to make its investment environment becomes more attractive to foreign investors.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project (공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구)

  • Park, Won-Ho;Sim, Jae-Kwang;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.137-144
    • /
    • 2010
  • As mega-sized and complex building construction projects are on the rise, the importance of project scheduling and control is being highlighted. Project scheduling and control techniques are not yet widely used in Korea, but interest in these has progressively been increasing. Until now, most research projects have mainly focused on scheduling issues, but project progress management is of equal importance. In this research, the current state of project progress management in Korea is analyzed, and ways for improvement are suggested. We begin by analyzing previous research and practical studies in this field, and then survey experts about the current state of project progress management. This study suggests the Building Information Modeling (BIM)base project progress management method for quantitative and qualitative project progress analysis. Currently, BIM is applied to design, construction and maintenance for construction projects. BIM can also contribute to improving accuracy and understanding of the current project situation.

A Study of iPMIS(Intelligent Program Management Information System) Information Inference an Searching System Based on Ontologies (온톨로지 기반 정보 검색 시스템을 이용한 iPMIS (지능형 종합사업관리시스템) 정보 추론에 관한 연구)

  • Ahn, Hyoung-Jun;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.175-179
    • /
    • 2009
  • Researches of current PMIS(Project Management Information System) information searching focus on providing personalized results as well as matching needed queries in an enormous amount of information. This paper aim at discovering hidden knowledge to provide personalized and inferred search results based on the ontology with categorized concepts and relations among construction data. The current PMIS searching occasionally presents too much redundant information or offers no matching results from large volumes of data. In this paper, we propose a service searching system, which becomes aware of users device using iPMIS(Intelligent Program Management Information System). And we design and plant the ontology-based iPMIS, which is aware of the context in its environment.

  • PDF

THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

A Comparative Study by Subject on the New R&D Planning Process (신규 R&D 기획 프로세스에 관한 주체별 비교연구)

  • Bae, Junhee;Park, Jungkyu
    • Economic and Environmental Geology
    • /
    • v.52 no.3
    • /
    • pp.243-250
    • /
    • 2019
  • The purpose of this study is to pro-actively respond to changes in government R&D policy and start to supplement the limitations of previous KIGAM R&D planning process. We looked out through the existing literature for a variety of R&D planning process, and analyzed the R&D planning process characteristics of each institution through the interview. As a result, we can be derived conclusions and implications from three sides, environmental analysis, demand excavation methods, R&D project configuration and selection method. In the case of environmental analysis and the overall need to enhance the skills and mega trend analysis by market trend analysis. And in the demand side, the institute need to establish challenging and specific R&D goals. In addition, in case of configuration and selection of R&D projects we derived several implications, such as convergence, SME support, resource analysis, selection of long-term project.

Study on the Social Carrying Capacity in the Mega-Event - The Case of the International Kwangju Biennale, Korea - (공간 집약적 관광지에서 사회적 수용력 연구)

  • 김진선;정성태
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.2
    • /
    • pp.28-35
    • /
    • 2003
  • This study was conducted to identify the characteristics of social carrying capacity at mega-events, especially the 2000 Kwangju Biennale in Korea. In particular, this paper has proposed some management policies for mega events taking into account the relations between social carrying capacity, satisfaction and crowding. The research method was to look into the general characteristics and distributive forms of the location, and then to confirm the possibility of sampling the factors involved in satisfaction degree; last, A factor analysis for causal analysis of perceived crowding was performed. The study needed correlation analysis in order to compare expected crowding and perceived crowding, and performed regression to examine the causality of perceived crowding and satisfaction. The research results were as follows: the correlation of expected crowding, perceived crowding, and the total satisfaction was very low or meaningless. The relation between satisfaction and elements for factor analysis such as convenient facilities and value experience showed partial meaningfulness. The factors of convenient facilities, entrance fee, parking lot use, toilet convenience, and exhibit room use had meaningful results; on the other hand, the factors of value experience showed a meaningful result in the guide service of an event place. In conclusion when those holding an event make a basic project, they should consider management measures for convenience of facilities, proper education for guide service, and systematic guidance. Also, as a method for perceived crowding lower than expected crowding, the study has proposed that it is possible to lower expected crowding by providing appropriate information on the number of tourists expected on the weekends and weekdays. Future research should control variables such as personal characteristics, seasons proper for vacation and holidays, and carefully consider their investigation and design. Moreover, it is necessary to study variables involved in expected crowding of more various space-intensive sightseeing places (mesa-events).

A Case Study of a Drilled Shaft Design and Construction of Buildings (건축구조물에서 현장타설말뚝에 의한 대형기초의 설계 및 시공사례)

  • Joeng, Gyeong-Hwan;Jung, Dong-Young;Kim, Young-Man;Jung, Sun-Tae;Kim, Dong-Jun;Kim, Min-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.554-563
    • /
    • 2009
  • The trend of current urban redevelopment and new city development project shows that the superstructure of building is getting larger and higher in consequence of a limited plottage condition. For this reason, it is definitely required to extend pile diameter and install more deep foundation(Mega foundation) to support superstructure. The existing precast pile construction method causes construction-related problems such as increasing quantities, difficulty of storage & transportation material and decreasing design load while construct pile in deep foundation. The drilled shaft method has applied to minimize those problems. This article will be presented construction case study of design & construction of R.C.D method for a large building foundation work on the inside and outside of the country.

  • PDF

A Study of the Identify about Scheduling Process at Owner's Position (IDEF 방법론을 이용한 발주자 공정관리 프로세스 규명에 관한 연구)

  • Lee Tai Sik;Kim Young Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-457
    • /
    • 2001
  • All of the partner must manage continually scheduling for the successful project in construction. Besides, that is not a important only contracter's managing but also owner's managing which is a very important about project finishing in time. Especially, in the case of mega project, the owner has to manage progress of scheduling to control contractor. And the case of progress to delay or to change, owner, contractor, and inspector must make a plan of recovery scheduling. This study proposes a construction process model from IDEF Methodology.

  • PDF