• Title/Summary/Keyword: Marine environmental impact assessment items

Search Result 22, Processing Time 0.022 seconds

Assessment of Documentation Status of the Statement on the Sea Area Utilization according to Artificial Structure Installation in Public Water (공유수면 인공구조물 설치에 따른 해역이용협의서 작성실태 평가)

  • Eom, Ki-Hyuk;Lee, Dae-In;Kim, Gui-Young;Yoon, Sung-Soon
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.3
    • /
    • pp.265-276
    • /
    • 2013
  • This study assessed documentation status of each environmental assessment items by analyzing the 243 case of marine EIS on the Consultation System of Sea Area Utilization. Observed rate of tidal elevation, current, temperature, salinity in maine environment were below 20%. The EFDC tool is applied substantially in hydrodynamic modeling. The verification process, however, is very insufficient using the recent observed data. Also, in-situ assessment rate of pelagic organism such as phytoplankton was below 50%, and assessment for Chlorophyll a was not accomplished. Ecological index evaluation for zooplankton and benthic ecosystem were not considered in statements. Especially, the rational assessment on the fisheries resources and protected species were very limited. It was necessary that the core assessment items (checklists) were established for environmental scoping. Furthermore, suggestion of information related to development, regional coastal management plan, aquaculture farms, and facilities were enhanced. The redundancy problem of proceedings between Environmental Impact Assessment and Sea Area Utilization Assessment System was improved.

Scoping for Environmental Impact and System Improvement of Marine Sand Mining in Korea (바다골재채취에 따른 환경영향 스코핑과 제도개선)

  • Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kim, Gui-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.3
    • /
    • pp.335-345
    • /
    • 2010
  • This paper assessed environmental impacts of marine sand mining on coastal areas and Exclusive Economic Zones (EEZs) of Korea, and diagnosed problems of the related assessment statements for suggesting key assessment items (scoping) and system improvement. To mitigate conflicts and environmental impacts caused by large-scale, concentrated sand mining, we suggest it is critical to promote sustainable and eco-friendly utilization of marine resources while listening opinions from various stakeholders and analyzing alternative plans. Especially, it should be mandatory as a scoping item to provide verifiable data on the amount of sand, potential and accumulative impacts by mining, and key assessment items (e.g. erosion and sedimentation by submarine topography, benthic change, spreading of suspended solids, water pollution, grain-size change, and impact on fisheries resources). We also suggest that postassessment and monitoring should be improved to enable tracking of environmental impacts caused by sand mining through seasonal monitoring together with intermittent short-term surveys. In addition, effective measures to mitigate the impacts is also essential. As repeated sand mining at large-scale can damage marine ecosystems by long-term accumulated impacts, we suggest that assessment systems and regulatory policies should be developed and established, especially for ensuring reliability of assessment and review on selected major sandmining projects.

An Effective Environmental Assessment for the Simple Statement of the Sea Area Utilization Consultation System (간이해역이용협의 유형분석 및 효율적 환경평가방안)

  • Lee, Dae-In;Eom, Ki-Hyuk;Kim, Gui-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.3
    • /
    • pp.255-264
    • /
    • 2013
  • This paper diagnosed the assessment problems and development types of the simple statement of the Sea Area Utilization Consultation System. and suggested the key assessment items for system improvement. The major types of Public Water occupation and use, and distribution characteristic of regional and coastal were analyzed by evaluate 529 review items during 2010-2012. The artificial structure installation including harbor and fishing port facilities in the South and West coast, and seawater supply and drainage for land-based aquaculture and power plant were dominated. The checklists considering each types of occupation and use in Public Water were suggested. In addition, policy proposals for system improvement were suggested.

Scoping for Marine Environmental Impact Assessment of Tidal Power Plant Construction (조력에너지 개발사업의 해양환경영향평가 스코핑 방안)

  • Kam, Min-Jae;Kim, Gui-Young;Jeon, Kyeong-Am;Yu, Jun;Lee, Dae-In;Eom, Ki-Hyuk
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.1
    • /
    • pp.30-37
    • /
    • 2012
  • This paper assessed environmental impact of tidal power plant construction in the western sea of Korea, and diagnosed problems of the related assessment. We also proposed key assessment items (scoping) and system improvement for environmental impact assessment (EIA). The establishment of a broad consensus of the appropriateness and a clear purpose for business is an important aspect of the aptness of using the waters, and the aggressive collecting of opinions of the stakeholder and institutions will have to be fulfilled. In addition, we presented the following scoping plan in order to minimize the negative effects of the marine ecosystem and the conflict between the people who work in the fishing industry which result due to the construction of the tidal power plants. (1) the change in seawater exchange rates and the aspect of erosion/sedimentation which result from the change in the velocity of running fluid, (2) the destruction of spawns/habitats of fish due to the damage of tidal flats, (3) fishery resources, impacts of fishing grounds, and the spread of suspended sediments, etc. will have to be applied to the key assessment items(scoping). In addition, every citizen will have work hard for an establishment of an active plan which achieves the harmony and balance of environmental preservation and for the policy to be applied through changing their consciousness of environmental preservation.

Improvement of the Marine Environmental Assessment for Dredging and Ocean Disposal of Coastal Sediment in Korea (연안준설 및 준설토 해양투기 해양환경평가 개선방안)

  • Lee, Dae-In;Park, Dal-Soo;Eom, Ki-Hyuk;Kim, Gui-Young;Cho, Hyeon-Seo;Kim, Jong-Kyu;Seo, Young-Kyo;Baeck, Gun-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.3
    • /
    • pp.131-141
    • /
    • 2009
  • We studied improvement in marine environmental impact assessment and related management systems of coastal sediments that are dredged inshore but disposed offshore. After reviewing and diagnosing the existing assessment procedures and problems, we recommend to design the core assessment items and improve the reliability of assessment byenhancing the quality assurance/quality control (QA/QC) and verification processes. We proposed eco-friendly disposal plan for dredging sediment such as reuse system in land development was explored. A marine environmental database system was established to support the assessment processes. Guidelines for marine research and modelling were proposed for improving assessment of dredging and disposal of coastal sediment. Also, applying of screening and scoping for marine environmental assessment was reviewed.

Improvement for Marine Environmental Impact Assessment on the Development of Offshore Wind Power (해상풍력개발사업의 바다환경영향평가 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.1
    • /
    • pp.1-13
    • /
    • 2012
  • We diagnosed on status and problems of environmental assessment regarding development of offshore wind power, and also on reasonable core assessment items. Most of the coastal wind power are located on the western coastline of Korea and Jeju Island. In the selections of the site for the offshore wind farms, a previous investigations should be conducted with regard to distances from the land, stabilities from external forces (tide, wave, etc.) and topographical changes, and characteristics of the surroundings (distributions of protected area, fishing ground, artificial seagrasses, and shipping traffic). It is needed to assess dispersion of suspended solids, changes of the sea bottom, and impacts on fisheries resources and fishing activities under construction of offshore wind power. Furthermore, the responses of marine organisms to noise and vibration, impacts by electromagnetic fields, impacts on sea birds, hindrances to sea lane routes, and damaged scenery and marine protection areas are thoroughly assessed during operation processes. The consultation criteria in case of development of offshore wind farm is adjusted by focusing marine environmental impact assessment.

Improvement of Marine Environmental Impact Assessment for Golf Course Projects in Southern Coastal Area of Korea (남해연안 골프장조성에 따른 해양환경영향평가 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Yu, Jun;Eom, Ki-Hyuk;Jeon, Kyeong-Am
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.5
    • /
    • pp.453-464
    • /
    • 2010
  • We evaluated the status and problems of golf course developments in the southern coast of Korea. It's adjacent waters supports nursery and fishing grounds for commercially-important fisheries species, and various sites are designated and protected as marine protection area(MPA), fisheries reserve, or clean area(blue belt) for producing shellfish. We proposed key assessment items for environmental impact assessment(EIA) and checklists in selecting golf course locations. For the protected areas, we suggest that it is essential to limit golf course establishment while setting a minimal distance from the coast to secure a buffer zone for mitigating the environmental impacts. To efficiently utilize existing regional coastal management plans, it is necessary to diagnose how a golf course development will potentially modify geomorphology and scenery, amplify pollutant loads from non-point sources, and disrupt the functions of coastal ecosystem. Especially, continued monitoring and assesssing input loads of hazardous materials originating from agricultural chemicals should be obligatory. Finally, measures for improving the QA/QC analysis were discussed to enhance reliability of environmental data with respect to golf courses and adjacent coastal waters.

Assessment and Improvement of Documentation Status on the Statements for the Sea Area Utilization Consultation according to the Project of Ports and Fishery Harbors (항만·어항개발사업의 해역이용협의서 작성실태 평가 및 개선방안)

  • Tac, Dae-Ho;Oh, Hyun-Taik;Kim, Gui-Young;Lee, Dae-In
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.4
    • /
    • pp.361-371
    • /
    • 2015
  • This study analyzed the 91 cases of the statements for the Sea Area Utilization Consultation according to the developmental projects of ports and fishery harbors for 2012 2014 and the status of the record of document, and suggested the improvement way to go. The marine environmental timpact assessment items both marine chemistry such as water quality, sediment and marine biology such as benthic animal, plankton, and fisheries show highly rate of site survey. But, the utilization of those data through site survey is too low, and it is necessary to adopt the QA/QC for the reliability of survey data. The items of marine physics such as tide, tidal current analyzed based on references not a site survey. However, the simulation performed actively without calibration and verification compared to the result of site survey. When the projects of port and fishery harbor perform, it is necessary to monitor the physical parameter such as wave, tide and tidal current especially. Based on the scale and the type of project, we need introduce the system of scoping for prediagnosis the key assessment items and checklists.

Diagnosis of Scoping and Type of Review on the Marine Environmental Impact Assessment for Ocean Energy Development Project (해양에너지개발사업 환경영향평가 검토유형 및 중점평가사항 진단)

  • Lee, Dae In;Kim, Gui Young;Tac, Dae Ho;Yi, Yong Min;Choi, Jin Hyu;Kim, Hye Jin;Lee, Ji Hye;Yoon, Sung Soon
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.18 no.3
    • /
    • pp.179-188
    • /
    • 2015
  • This study reviewed the type of the project and developmental plan related to ocean energy development in the coastal land boundaries and the ocean, and suggested the efficient scoping method through the diagnosis of the key items of environmental impact assessment (EIA) in the coastal area. The major projects are the construction of tidal power plant, tidal current power plant, and offshore wind power plant in the public water, and also those are the construction of solar power plants in the coastal land boundaries. While the project plans on a large scale such as the construction of tidal power plant, it is important to consider both property of usefulness of the designated areas and harmony analysis with marine space availability based on the adequacy of the site selection and relevance of plan with the master plan for reclamation and strategic environmental assessment (SEA). And also it needs to be considered the careful checkup on the EIA checklist referring to the type of project, effective post-monitoring, and suggestion of mitigating methods to minimize the environmental impacts during the stage of actual environmental impact assessment. Introduction of a system of integrated marine environmental impact assessment should be considered for reasonable and effective manage to developmental projects on the marine spatial area.

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.