• 제목/요약/키워드: Manufacturing Cycle Time

검색결과 264건 처리시간 0.03초

부품 수요율을 고려한 제조 셀의 운용 (A Study of Manufacturing Cell Based on the Demand Rate)

  • 박승헌
    • 산업경영시스템학회지
    • /
    • 제22권49호
    • /
    • pp.67-76
    • /
    • 1999
  • This research presents the relationship among machining time, cycle time and demand rate in a cellular manufacturing system. The manufacturing cell produces part families by automated machines. This paper discusses the cases of increasing demand rate in an existing cell and designing cell based on the demand rate. This research developed an algorithm for decision making such as cycle time, machines and workers in order to minimize the total machine capacity and the number of workers for any given demand rate. The proposed algorithm was successfully applied for the design and operation of cell manufacturing with a good result.

  • PDF

생산주기를 활용한 AGV 운용에 관한 연구 (A Study on the AGV Operation Using Production Cycle Time)

  • 김지표
    • 한국경영과학회지
    • /
    • 제27권1호
    • /
    • pp.107-117
    • /
    • 2002
  • The ever-glowing demands for more responsiveness and more flexibility in manufacturing generate greater expectation for the AGV system. So far. a significant amount of research has been carried out to fulfill those requirements. However, the dynamic characteristics of manufacturing systems make it hard to solve the problem analytically. In this paper, the AGV system is analyzed in the production environments which adopt a cycle time to produce materials. The use of the cycle time could eliminate much of uncertainty Inherent In the manufacturing process so that it is possible to build the deterministic model for the AGV systems, which eventually Produce better results on the important issues such as AGV dispatching, determination of the number of AGVs, and empty vehicle travel time.

The Study of the Cycle Time Improvement by Work-In-Process Statistical Process Control Method for IC Foundry Manufacturing

  • Lin, Yu-Cheng;Tsai, Chih-Hung;Li, Rong-Kwei;Chen, Ching-Piao;Chen, Hsien-Ching
    • International Journal of Quality Innovation
    • /
    • 제9권3호
    • /
    • pp.71-91
    • /
    • 2008
  • The definition of cycle time is the time from the wafer start to the wafer output. It usually takes one or two months to get the product since customer decides to produce it. The cycle time is a critical factor for customer satisfaction because it represents the response time to the market. Long cycle time reflects the ineffective investment for the capital. The cycle time is very important for foundry because long cycle time will cause customer unsatisfied and the order loss. Consequently, all of the foundries put lots of human source in the cycle time improvement. Usually, we make decisions based on the experience in the cycle time management. We have no mechanism or theory for cycle time management. We do work-in-process (WIP) management based on turn rate and standard WIP (STD WIP) set by experiences. But the experience didn't mean the optimal solution, when the situation changed, the cycle time or the standard WIP will also be changed. The experience will not always be applicable. If we only have the experience and no mechanism, management will not be work out. After interview several foundry fab managers, all of the fab can't reflect the situation. That is, all of them will have an impact period after product mix or utilization varied. In this study, we want to develop a formula for standard WIP and use statistical process control (SPC) concept to set WIP upper/lower limit level. When WIP exceed the limit level, it will trigger action plans to compensate WIP Profile. If WIP Profile balances, we don't need too much WIP. So WIP level could be reduced and cycle time also could be reduced.

RCB법에 의한 원통형 플런지 연삭공정의 싸이클 시간 감소에 관한 연구 (A Study on the Cycle Time Reduction of Cylindrical Plunge Grinding Process with Recursive Constraint Bounding Method)

  • 최성주
    • 한국생산제조학회지
    • /
    • 제6권1호
    • /
    • pp.34-44
    • /
    • 1997
  • This study presents the recursive constraint bounding(RCB) method to reduce the cycle time in internal cylindrical plunge grinding process. This method can cope with process noise as well as modeling bias. The main features of RCB method are its utilization of measurements at the end of each cycle and its use of monotonicity analysis for determining the extremes of bias and noise. This method is investigated in simulation and evaluated by experiment in internal cylindrical plunge grinding operation. The results from simulation and experiment show that it is effective in reducing cycle time in spite of modeling uncertainty in the forms of process noise and modeling bias.

  • PDF

반도체 FAB공정의 사이클타임 단축을 위한 병목일정계획 (Bottleneck Scheduling for Cycletime Reduction in Semiconductor Fabrication Line)

  • 이영훈;김태헌
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.298-301
    • /
    • 2001
  • In semiconductor manufacturing, wafer fabrication is the most complicated and important process, which is composed of several hundreds of process steps and several hundreds of machines involved. The productivity of the manufacturing mainly depends on how well they control balance of WIP flow to achieve maximal throughput under short manufacturing cycle time. In this paper mathematical formulation is suggested for the stepper scheduling, in which cycle time reduction and maximal production is achieved.

  • PDF

반도체 FAB 공정의 효율적인 통제를 위한 생산 기준점 산출 알고리듬 (A Milestone Generation Algorithm for Efficient Control of FAB Process in a Semiconductor Factory)

  • 백종관;백준걸;김성식
    • 대한산업공학회지
    • /
    • 제28권4호
    • /
    • pp.415-424
    • /
    • 2002
  • Semiconductor manufacturing has been emerged as a highly competitive but profitable business. Accordingly it becomes very important for semiconductor manufacturing companies to meet customer demands at the right time, in order to keep the leading edge in the world market. However, due-date oriented production is very difficult task because of the complex job flows with highly resource conflicts in fabrication shop called FAB. Due to its cyclic manufacturing feature of products, to be completed, a semiconductor product is processed repeatedly as many times as the number of the product manufacturing cycles in FAB, and FAB processes of individual manufacturing cycles are composed with similar but not identical unit processes. In this paper, we propose a production scheduling and control scheme that is designed specifically for semiconductor scheduling environment (FAB). The proposed scheme consists of three modules: simulation module, cycle due-date estimation module, and dispatching module. The fundamental idea of the scheduler is to introduce the due-date for each cycle of job, with which the complex job flows in FAB can be controlled through a simple scheduling rule such as the minimum slack rule, such that the customer due-dates are maximally satisfied. Through detailed simulation, the performance of a cycle due-date based scheduler has been verified.

고속 고정도가공에 기인하는 Servo System의 최적화와 기능특성에 관한 연구 (A Study on the Optimization of Servo System Originating to High-Speed Fixed Duty Processing)

  • 이홍길;김원일;최명환;백상엽
    • 한국기계가공학회지
    • /
    • 제8권2호
    • /
    • pp.18-24
    • /
    • 2009
  • The most dominate aspect in machine works using CNC devices in industrial production processes is the precision of the product and the Cycle Time. To this day, many studies on the external factors of the technology to reduce the Cycle Time have advanced amid to the advancements in cam soft development for manual programs and the numerous studies on high speed and precision machining. This study experimented various functions of the sequence pattern flow and arranged system development technologies of past few years to develop and applicate various usage of adjustment factors within the CNC, so it would be more understandable to the user and would enable them to make high speed and precision products more faster develop and. In order to reduce the Cycle Time, the mechanism of machine tools has to be analysed and applied, in addition to program reduction and improvement of the manufacture process.

  • PDF

High Precision Path Generation of an LCD Glass-Handling Robot

  • Cho, Phil-Joo;Kim, Hyo-Gyu;Kim, Dong-Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.2311-2318
    • /
    • 2005
  • Progress in the LCD industries has been very rapid. Therefore, their manufacturing lines require larger LCD glass-handling robots and more precise path control of the robots. In this paper, we present two practical advanced algorithms for high-precision path generation of an LCD glass-handling robot. One is high-precision path interpolation for continuous motion, which connects several single motions and is a reliable solution for a short robot cycle time. We demonstrate that the proposed algorithm can reduce path error by approximately 91% compared with existing algorithms without increasing cycle time. The second is real-time static deflection compensation, which can optimally compensate the static deflection of the handling robot without any additional sensors, measurement instruments or mechanical axes. This reduces vertical path error to approximately 60% of the existing system error. All of these algorithms have been commercialized and applied to a seventh-generation LCD glass-handling robot.

  • PDF

PVAJT 모션플래너를 이용한 Cubic Spline 보간기의 설계 (Design of Cubic Spline Interpolator using a PVAJT Motion Planner)

  • 신동원
    • 한국기계가공학회지
    • /
    • 제10권3호
    • /
    • pp.33-38
    • /
    • 2011
  • A cubic spline trajectory planner with arc-length parameter is formulated with estimation by summing up to the 3rd order in Taylor's expansion. The PVAJT motion planning is presented to reduce trajectory calculation time at every cycle time of servo control loop so that it is able to generate cubic spline trajectory in real time. This method can be used to more complex spline trajectory. Several case studies are executed with different values of cycle time and sampling time, and showed the advantages of the PVAJT motion planner. A DSP-based motion controller is designed to implement the PVAJT motion planning.

최적 Kanban 수거 시간에 대한 분석 (Analysis of Optimal Kanban Cycle Time)

  • 이상복
    • 한국경영과학회지
    • /
    • 제23권4호
    • /
    • pp.53-61
    • /
    • 1998
  • In this paper, we take into consideration the optimal cycle time in a kanban system. Even though there are many studios in the literature published in the past. It is rare to fine a paper dealing with kanban cycle time. We consider manufacturing structure configured in the real field and suggest kanban cycle time for the cases of linear, tree assembled, distributed, general and mixed structures. Also we give numerical example for each structure.

  • PDF