• Title/Summary/Keyword: Managing System

Search Result 2,372, Processing Time 0.03 seconds

Design and Implementation of High-availability System (임무컴퓨터를 위한 고가용 시스템의 설계 및 구현)

  • Jeong, Jae-Yeop;Lee, Cheol-Hoon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.529-533
    • /
    • 2008
  • Mission Computer performs important role both managing a whole system and dealing with a specific mission in avionics system. In general, the fault of SPOF(Single Point Of Failure) in unity system can lead to failure of whole system. It can cause a failure of a mission and also can threaten to the life of the pilot. So, in this paper, we design the HA(High-availability) system so that dealing with the failure. And we use HA software like Heartbeat, Fake, DRBD and Bonding to managing HA system.

  • PDF

The study on Analysis of Influence factors on Items in Apartment House Maintenance Cost (공동주택 관리비 항목별 영향요인 분석 연구)

  • Lim, Nam-gi;Park, Chan-jeong;Jung, Sang-jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.1
    • /
    • pp.155-162
    • /
    • 2002
  • In this research, I finally came to a conclusion analyzing the connection among managing of each items in management expenses, the size of each complex and stories, and the term of using. (1) In the managing cost regarding to the management manner, although the managing cost of self-governing management is less imposed than the one of commission management, there is slight difference between those Costs. And it is more important to consider the effectiveness of management than to emphasize reduction of management cost. (2) The higher the stories, the higher the managing cost of elevator per the unit area. It Is caused by the fact that the father the distance of the elevator operating, the higher the electric charges. (3) The third of one of total management cost goes to pay the personnel expenses. So I found that the effective management of the expenses is available to reduce management cost. (4) The higher the stones, the lower the cost of personnel expenses including the cleaner cost. (5) The sum of costs assigned in repairment and management increases in proportion to the term of using. The costs assigned in special repairment and management are interacting to each other. (6) To reduce the management cost, we have to cut down the personnel in security guard that occupies one third of total management cost with application to the joint security system and operation of the self-governing guard. Through this process, it will be easy to accomplish the rationalization of contract with an outside order. Because the improvement of management service is not only the responsibility of owner but also the one of dwellers. And it Is imperative to realize the importance of cooperation and trust between the owner and dwellers. And the establishment of effective managing system which has convenience and rationality must be settled without delay.

A Study on the Improvement of Mutual Cooperation Using Partnering (상호협력관계 개선을 위한 파트너링 도입에 관한 연구)

  • Park Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.275-278
    • /
    • 2002
  • The reinforcement of competitiveness and prevention of false construction has become the management goal of construction companies since construction market was opened. In this study, we introduced the concept, 'Partnering' to effectively manage subcontractors, and shed light on again the relationship between contractor and subcontractor, and tried to find its mutual progressive relationship. This study looked at the theories through existing literature to build mutual cooperation system by 'Partnering', and then sampled 'Quality Management System' of general construction companies and looked into their present state in managing subcontractors, and then compared and analyzed the problems in managing subcontractors by questionnaire survey with specialized construction companies. And, in order to establish a reasonable plan in managing subcontractors based on these problems, we progressed the study on how to build mutual cooperation system using 'Partnering'.

  • PDF

System Development for Guiding Job Information Based on Android Smart-phone (안드로이드 스마트폰 기반 취업정보 알림이 시스템 개발)

  • Cho, Yong-Hyun
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.21 no.5
    • /
    • pp.588-594
    • /
    • 2011
  • This paper presents the development of application and management system for guiding job information based on android smart-phone. The real-time informations which are provided from the job portal site, become known by using the smart-phone, and the sever system for saving and managing the related informations has been implemented. Especially, the relay and synchronization protocol of job informations have been designed and the system for managing a transmitting and receiving information is also designed and modelled. The developed application has been made up for and registered in the application store for making good use.

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

Design of Distributed Cloud System for Managing large-scale Genomic Data

  • Seine Jang;Seok-Jae Moon
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.16 no.2
    • /
    • pp.119-126
    • /
    • 2024
  • The volume of genomic data is constantly increasing in various modern industries and research fields. This growth presents new challenges and opportunities in terms of the quantity and diversity of genetic data. In this paper, we propose a distributed cloud system for integrating and managing large-scale gene databases. By introducing a distributed data storage and processing system based on the Hadoop Distributed File System (HDFS), various formats and sizes of genomic data can be efficiently integrated. Furthermore, by leveraging Spark on YARN, efficient management of distributed cloud computing tasks and optimal resource allocation are achieved. This establishes a foundation for the rapid processing and analysis of large-scale genomic data. Additionally, by utilizing BigQuery ML, machine learning models are developed to support genetic search and prediction, enabling researchers to more effectively utilize data. It is expected that this will contribute to driving innovative advancements in genetic research and applications.

Prototype Implementation of a Context Awareness System by Analyzing Alarm and Neighborhood Environment for Managing Underground Facilities (알람정보와 인접환경 분석을 통한 지하시설물 상황인식 시스템의 프로토타입 구현)

  • Cho, Sung-Youn;Hong, Sang-Ki;Jang, Seok-Woo
    • Spatial Information Research
    • /
    • v.19 no.3
    • /
    • pp.83-93
    • /
    • 2011
  • Since urban facilities have a signigicant meaning that represents the degree of development of nations and cities, it is very important to effectively manage and operate the facilities. In this paper, we propose a context-awareness system for managing urban underground facilities intelligently and develop its algorithm and prototype. The algorithm of the suggested system includes the period from the point when various sensors set up in USN environments sense abnormal signals and make alarms to the point when the context-awareness system analyzes the alarm and sends the analysis results to integrated platform and related modules. We then implement the prototype of the proposed context awareness system and verify the effectiveness of the system by performing unit tests. Our developed prototype will become the basis of actual system development. We expect that the suggested system will be used as a good reference model of related systems managing various types of urban facilities.

A Study on Development of Bridge Maintenance and Management System Using GSIS (GSIS를 이용한 교량 유지보수 이력관리 체계 개발에 관한 연구)

  • Yeu, Bock-Mo;Joo, Hyun-Seung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.133-141
    • /
    • 1999
  • Collapse of a huge structural material has brought about enormous loss of lives and property. Every construction may be destroyed by the nature's power and careless mistake of human as well as its own defect. So a great number of concern and detailed managing technique are demanded not in constructing work but also in management of constructed material. The Interest of construction safety has Increased rapidly and a plenty of effort has been attempted to manage systematically. In this study, the use of FM(Facilities Management) as a branch of GSIS(Geo-spatial Information System) was developed to offer the users convenient managing achievement and establishment of history managing system in the bridge management system. This study accomplished dividing all information of images, photos, drawing and etc. into their items of time, material and the person in charge, and developed to stue and maintain those items in database. Related database which is composed of recording of check, retrieving and adding the data was accomplished to an easy access of database, and by using these data as output for example images, m display, report and hard copy, this system was proved to help manage efficiently in bridge management system.

  • PDF

Development of Managing Security Services System Protection Profile (보안관제시스템 보호프로파일 개발)

  • Son, Seung-Wan;Kim, Kwang-Seok;Choi, Jung-Won;Lee, Gang-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.2
    • /
    • pp.345-353
    • /
    • 2015
  • Security Management System is a system which operates in the security control center for security control. All living things across the Internet in recent years, with the rapid increase in the subscriber base has increased the need for network security dramatically depending on yirueojim through web services, thus cyber security sheriff, I have a big issue to build a security management system, each agency and perform control tasks. But the security functional requirements for security management system would not specified exactly, in developing a security management system to build and design a situation that PP's needs require a lot of trouble. In this paper, we develop a Managed Security System Protection Profile for the security functional requirements specification of the security management system.

A Historical Analysis of Records and Archives Management System of Won-Buddhism (원불교 기록관리체제의 성립과 변천)

  • Ha, Jong-Hee
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.17 no.2
    • /
    • pp.157-176
    • /
    • 2006
  • This study covers the transition of the records and archives management system of Won-Buddhism. The System can be reviewed in four eras. In the Bulbeopyeonguhoe regulations era(1924$\sim$1948), records and archives were managed in an elementary but more ingenious manner than in any other era. The first phase of the Won-Buddhism regulations era(1948$\sim$1965) was governed by the Won-Buddhism Regulations, though the traditional system of the Bulbeopyeonguhoe regulations era was still widely practiced. During the second phase of the Won-Buddhism regulations era (1965$\sim$1994), the system of "national regulations" was actively introduced into the Won-Buddhism system of managing records and archives. During the third phase of the Won-Buddhism regulations era(1994$\sim$present), the Won-Buddhism Regulations had their own meaning because in that they were the first regulations of Won-Buddhism established for the sole purpose of managing records and archives. This study has significance for understanding the Won-Buddhism system of managing records and archives.