• Title/Summary/Keyword: Management plan

Search Result 6,978, Processing Time 0.04 seconds

A Study on the Forest Landscape Master Plan for Riverside Forest Landscape Belt - Focusing on Sangju-si, Gyeongsangbuk-do - (하천변 산림경관벨트 산림경관기본계획 수립에 관한 연구 -경북 상주시를 중심으로-)

  • Kim, Hoon-Hui;Shin, Ji-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.6
    • /
    • pp.17-29
    • /
    • 2013
  • Recently, the importance of forest landscape as a visual resource has been increased, so it is emphasized that the necessity of forest landscape management through 'Forest landscape management master plan' and 'National Forest landscape belt'. As such, this study aims to suggest a method for forest landscape management plan considering visual landscape analysis and regional landscape resources in case of Sangju-si, Gyeongsangbuk-do. Accordingly, this study has investigated regional landscape resources and surveyed existing forest conditions of target area. In order to analyze the characteristics of visual landscape, landscape control points are selected through viewshed analysis. And, Forest landscape plan is suggested 3 areas considering comprehensive analysis of forest landscape resources survey and characteristics of visual landscape:the landscape resource management area, the landscape resource restoration area and the landscape resources exploit area.

A study about logistics costs reduction and improving work safety by way of stocking cart improvement and information sharing plan adopting the SCM theory (SCM 개념의 통합 정보공유 계획과 적재대차 개선을 통한 물류비 절감방안 및 작업안전성 개선에 대한 연구)

  • YANG DOOJIN;LEE CHANGHO;Lee Gong-Seop
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.225-230
    • /
    • 2005
  • A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.

  • PDF

A study about logistics costs reduction and improving work safety by way of stocking cart improvement and information sharing plan adopting the SCM theory (SCM 개념의 통합 정보공유 계획과 적재대차 개선을 통한 물류비 절감방안 및 작업안전성 개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.41-56
    • /
    • 2005
  • A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.

A Study on the Fire Safety Plan for Building Construction (건축물 건설공사 시 화재안전계획 수립에 관한 연구)

  • Jeong, Myeong-Jin;Lee, Myeong-Gu;Ham, Eun-Gu
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.31-37
    • /
    • 2012
  • Recently buildings are constructed in larger and higher scales and becoming more complex. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore to improve fire safety plan, examining the actual fire safety management and understanding fire risk analysis Using Fire Modeling through Computer Simulation. On this study, the permissible evacuation times were estimated for smoke fall, temperature, CO concentration, viability, etc. Fire safety management plans for fire safety were suggested.

Strategic Action Plan for Companies to Supply Safe Products Using AHP Technology (AHP를 활용한 안전한 제품을 공급하기 위한 기업의 전략적 실행방안)

  • Seo, JunHyeok;SungMin, Bae
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.4
    • /
    • pp.635-646
    • /
    • 2022
  • Purpose: In this study, the detailed implementation plan for product safety evaluation and management suggested by KS A ISO 10377 to reduce the risk of harm to consumers and users is presented so that companies can strategically implement it. Methods: In order to achieve the purpose of this study, the upper elements and detailed execution plans shown in KS A 10377 are classified into hierarchies and set as a decision hierarchy. A pairwise comparison is performed to derive it. Results: Among the top factors, 'design safety (D)' was the most important factor, with 0.314. Therefore, ensuring safety in the design stage that can prevent defects in advance is the most important action plan for companies to supply safe products. Conclusion: The results of this study, it is intended to help companies and related organizations more easily understand and continuously apply KS A ISO 10377.

Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

KNOWLEDGE MANAGEMENT DEVELOPMENT PROCEDURE AND ITS INTRODUCTION PLAN FOR CONSTRUCTION COMPANY

  • Ji yun Lee;Young woong Song;Yoon ki Choi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1199-1202
    • /
    • 2005
  • Knowledge has been considered one of the important elements that determine our future. Competitive power of an enterprise has also been transformed from labor, capital, and technology-oriented to knowledge-oriented. Current construction environment is experiencing overall decrease of number of construction contracts due to opening of domestic construction market and economic slump, problems on methods of receiving orders/bidding, and change of costumers' attitude, which intensify competition, therefore many companies consider adopting knowledge management to secure their competitive power. However, there are difficulties in adopting knowledge management and increasing the use by establishing management plan, Performance Measurement, and knowledge maintenance system in reality. Therefore, this study is to provide assistance to successful realization of knowledge management by suggesting development plan of knowledge management that enables knowledge management more efficient with certain goals.

  • PDF

A Study on the Establishment of U-City Data Management (U-City정보의 생산.수집.가공.활용 및 유통 등 정보관리방안 수립 연구)

  • Ahn, Jong-Wook;Shin, Dong-Bin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.17 no.2
    • /
    • pp.27-35
    • /
    • 2009
  • U-City law was enacted U-City construction to support efficiently. But U-City planning system is not set. And detailed instructions are not also available. In particular, U-City data is not available and specific plans and instructions. Therefore, in this research, "U-City Law" by the state and local governments need to establish in the U-City Comprehensive Plan and the U-City master plan to be included in U-City data management was presented matters. U-City comprehensive plan provides the direction of the U-City master plan. Detailed action task are (1) U-City data management standards for the establishment of cooperation and sharing (2) Establishment of U-City data processing and activation (3) U-City data distribution system infrastructure (4) Establishment of data quality and price. U-City master plan is based on the U-City comprehensive plan. And U-City master plan for the data managements are (1) U-City data on the production plan (2) U-City data on the collection plan (3) U-City data on the processing plan (4) U-City data on the activation plan (5) U-City data on the distribution plan.

  • PDF

Plan-coordination architecture for Multi-agent in the Fractal Manufacturing System (FrMS) (프랙탈 생산 시스템에서의 멀티에이전트를 위한 플랜 조율 체계)

  • Cha, Yeong-Pil;Jeong, Mu-Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1124-1128
    • /
    • 2005
  • In this paper, a plan-coordination architecture is proposed for multi-agent control in the fractal manufacturing system (FrMS). A fractal in FrMS is a set of distributed agents whose goal can be achieved through cooperation, coordination, and negotiation with other agents. Since each agent in the FrMS generates, achieves, and modifies its own plan fragments autonomously during the coordination process with other agents, it is necessary to develop a systematic methodology for the achievement of global plan in the manufacturing system. The heterarchical structure of the FrMS provides a compromised plan-coordination approach, it compromise a centralized plan-generation/execution (which mainly focuses on the maximization of throughput) with a distributed one (which focuses on the autonomy of each module and flexibility of the whole system). Plan-coordinators in lower level fractal independently generate plan fragments according to the global plan of higher level fractal, and plan-coordinators in higher level fractal mediate/coordinate the plan fragments to enhance the global performance of the system. This paper assumes that generation method of the plan fragments and the negotiation policy of the fractal is achieved by a simple process, and we mainly focuses on the information exchanging and distributed decision making process to coordinate the combinations of plan fragments within a limited exchange of information.

  • PDF

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF