• 제목/요약/키워드: Management plan

검색결과 6,979건 처리시간 0.031초

철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안 (On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program)

  • 김재철;이재천;조연옥;김상암;한순우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF

문재인 정부의 건강보험 보장성 강화대책 (Moon Jae-in Government's Plan for Benefit Expansion in National Health Insurance)

  • 박은철
    • 보건행정학회지
    • /
    • 제27권3호
    • /
    • pp.191-198
    • /
    • 2017
  • Moon Jae-in Government announced the Government's 5-Year Plan on July 19, 2017, President Moon directly announced the Government's Plan for Benefit Expansion in National Health Insurance on August 7, 2017. The main contents of the announced expansion include benefit coverage for all medically necessary services with control over non-covered service occurrence, a decrease in the cost-sharing upper limit, and monetary support for catastrophic medical costs. Although past governments have been continuously striving for benefit expansion in the last 15 years, this plan has its breakthrough aspect in that all medical services will be covered by the National Health Insurance. In alignment, there are important tasks to solve: attaining a proper fee schedule, reforming the healthcare delivery system, and improving healthcare quality. This plan is a symptom oriented action in that it is limited in reducing patients' out-of-pocket money, unlike the systematic approach of the National Health Insurance. The sustainability of the National Health Insurance is being threatened due to South Korea's low birth rate, rapidly aging society, and low economic growth, in addition to the unification issue of the Korean Peninsula, medical utilization of the elderly, management of non-communicable diseases, and so on. Therefore, the Government needs to plan the National Health Insurance system reformation including actions addressed toward medical consumers.

Gamma-Prior가 고려된 KS A 3102의 수정검사방식(修正檢査方式) (Rectifying Inspection Plan for KS A 3102 with Gamma-Prior Distribution)

  • 정영배;황의철
    • 품질경영학회지
    • /
    • 제15권2호
    • /
    • pp.55-60
    • /
    • 1987
  • A rectifying inspection plan which assumes a gamma - prior distribution on the lot percent defective is considered. This sampling inspection plan is developed for finite lot sizes with matching OC curves and generated from an initial plan selected from KS A 3102 single sampling by attributes. Comparisons are made with each plan by three examples.

  • PDF

작업성취율 측정을 위한 공정관리절차의 개선 방안 (The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed))

  • 임철우;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.722-726
    • /
    • 2006
  • LCI(Lean Constrcution Institute)에 의해 개발되어진 라스트 플래너(Last Planner System)은 Master Schedule, Phase Schedule, Lookahead Schedule, Weekly Work plan의 4단계로 이루어진다. 본 연구는 LSP의 4단계 중 Weekly Work Plan 단계에서 이루어지는 PPC(Percent of Plan Completed)의 측정 프로세스에 초점을 맞추고 있다. PPC 적용에 따른 여러 가지 장점에 대해서는 이미 해외 여러 나라에 의해 소개되어진 바 있지만, 아직까지 우리나라에서 PPC란 용어 자체가 낯선 상황이며, PPC 관련 연구가 미흡한 실정이다. 따라서, 본 연구는 한국 건설산업에 PPC를 도입하기에 앞서 라스트 플래너 시스템의 공정관리체계와 국내 공정관리체계를 비교 ${\cdot}$ 분석함으로써 우리나라 현실에 적합한 작업성취율 측정을 위한 공정관리절차를 제시하고 이를 도입하기 위해 선행되어져야할 사항에 대해 제시하고자 한다.

  • PDF

국립공원 및 인접지역 경관관리 방안에 관한 연구 - 설악산 국립공원을 중심으로 - (A Study on the Visual Resource Management for Soraksan National Parks and Adjacent Area)

  • 임승빈;신지훈
    • 한국조경학회지
    • /
    • 제26권2호
    • /
    • pp.283-292
    • /
    • 1998
  • The purpose of this study is to suggest visual resource management methods for the national parks and adjacent areas, where visual impacts by high rise buildings such as hotel, condominium, etc. become serious problems. In this study Soraksan National Park has been selected as a case study for landscape management planning. The results of this study are as follows: 1) Comprehensive landscape management planning for National Parks and adjacent areas is necessary to solve visual impact problems by high rise buldings such as hotel, condominium, etc. 2) It is suggested to investigate visual resources and conceptual landscape management ideas, to select landscape control points and lines, landscape management areas, and to prepare building height control plan for proper landscape management plan. 3) In case of Soraksan national park, the landscape management plan includes three landscape management areas : Landscape preservation area, General landscape management area, and special landscape management area. 4) In the part of special landscape management area, it is necessary to introduce landscape impact assessment system to more effective landscape management.

  • PDF

국토계획과 환경계획 통합관리 지표 개발 연구 (A Study on Assessment Indicators for Integrated Management on Korea National Planning and Environmental Planning)

  • 허한결;성현찬;이동근;허민주;박진한
    • 한국환경복원기술학회지
    • /
    • 제21권3호
    • /
    • pp.27-45
    • /
    • 2018
  • Both the national land plan and the environmental plan reflect the need for sustainable land use and management. However, the linkage between the plans is reduced due to the lack of integrated management. Therefore, this study developed indicators to achieve integrated management. A total of 59 environmental plans were reviewed for the development of indicators, and a total of 74 integrated management indicators were derived through a three-stage process. In this process, the relevance of the integrated management indicators of this study to the UN 's sustainable development goals (SDGs) is presented in order to derive indicators that meet the level of international consultation. In order to facilitate the utilization of the indicators, the final indicators are divided into seven areas: natural ecology, water resource and quality, urban and green space, atmospheric, energy, landscape, resource circulation and waste. Furthermore, the indicators were classified into national, regional, and city level. Accordingly, the final indicator can be adapted to the field of influence of the planned to be established, and the indicator can be selected and applied to the level of the plan. The final indicators can be used to examine the extent to which the national plan reflects the contents of the environmental plan and can be used as an aid to confirm the contents to be included in the plan when establishing a new national plan.

건축현장 관리인력의 생산성 영향요인 조사 연구 (Influence Factors Analysis on the Productivity of Management Manpower)

  • 권기덕;김선국;손효원;김선형;이동훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.153-157
    • /
    • 2010
  • As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.

  • PDF

철도운행선 인접공사 사고분석과 체계적인 체크리스트 개발 등 안전대책 수립에 관한 연구 (A Study on the Development of Safety Management Checklist Using Accident Case adjacent to Railway Operation)

  • 류상환;염병수;갈원모
    • 산경연구논집
    • /
    • 제9권10호
    • /
    • pp.63-72
    • /
    • 2018
  • Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.

BULK선용 자동 Ballast Water Management Plan 개발 (The development of auto Ballast Water Management Plan For Bulk Carrier.)

  • 홍충유;권영섭;권성진;황진욱;박제웅
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2003년도 추계학술대회 논문집
    • /
    • pp.266-271
    • /
    • 2003
  • Many port states such as New Zealand. the USA. Australia and Canada have strict regulations to prevent ships which arrive in their port from discharging polluted ballast water which contain harmful aquatic organism and pathogens. They are notified that transfer of polluted ballast water can cause serious injury to public health and damage to property and environment. For this reason. they perceived that the ballast exchange in deep sea is the most effective method. together with submitting the ballast management plan which contains the effective exchange method. ballast system and safety consideration. In this study, we make an effort to develop optimum ballast water exchange management and in result of that. it provide more convenient and stable process to prepare ballast water management plan for Bulk Carrier.

  • PDF

동토지역 파이프라인 설계/시공에 따른 발생 데이터의 관리방안에 관한 기초연구 (A Fundamental Study on Management Plan of Occurrence Data in Accordance with Engineering & Construction of Pipeline in Frozen Soil Region)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.20-21
    • /
    • 2014
  • Recently, activation of related construction projects due to the large traditional gas resource development of frozen soil region of Russia are expected. It is necessary to provide a plan that can be utilized and collectively managed the occurrence data in the engineering & construction stage for continued contracts of the pipe construction. Therefore, this research is aimed to provide a management plan of occurrence data for efficient management in engineering & construction stage of pipeline business in frozen soil region. The data of the engineering & construction(related pipe construction projects) can be accumulated each version and multiply managed. Furthermore, I will be expected to be the foundation of the systematic management of the classifying based on metadata and the optimizing operations using big data method.

  • PDF