• Title/Summary/Keyword: Management Works on Site

Search Result 148, Processing Time 0.024 seconds

Efficiency Analysis for RFID-based Curtain Wall of unit Type Construction (RFID 기술 적용에 따른 유닛타입 커튼월 공사의 효율성 분석)

  • Kang, Hyun-Koo;Ha, Young-Seo;Lim, Chul-Woo;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.206-213
    • /
    • 2008
  • Due to the following reasons, the management of curtain wall parts and material is very Important. Firstly, curtain wall work is one of the main works in High-rise building construction for it takes about $10{\sim}15%$ of the total construction cost. Secondly, the whole process of curtain wall work including manu acture, delivery, storage, installation and maintenance is very complicated and sometimes more than 30 companies involve in the process. Thus there are many control points for curtain wall units. Thirdly, there are not enough space on site for material storage and this situation is more serious for sites in urban area. The purpose of this research is to validate an information systems using RFID technology that is developed to manage the curtain wall units following the process of curtain wall work. For the validation, the cycle times of curtain wall work before and a ter the system was used. The results show that using the systems shorten the cycle time of the curtain wall work. Thus it is concluded that the system can increase the efficiency of managing curtain wall work.

A Study on the Establishment of Clinical Nurse Specialist (우리나라 전문간호사제도 개선방안에 관한 연구)

  • Byun, Young-Soon;Kim, Young-Im;Song, Mi-Sook
    • Research in Community and Public Health Nursing
    • /
    • v.5 no.2
    • /
    • pp.130-146
    • /
    • 1994
  • Our medical care system is trying to diversify in order to meet the client's needs, and to adjust to a medical environment which is changing very rapidly. Because current nursing theory and practice focus on holistic care, health care management, education, and research, contrary to the traditional emphasis on only assisting a physician, more autonomy and specialization for the implementation of nursing are required. Considering these trends and actual needs, the category of clinical nurse specialist should be established as soon as possible. In order to develop strategies for implementing this new professional specialty, the authors conducted a field survey and literature review of the current system in Korea. As a result, various obstacles and constraints were discovered as follows : 1) There are few accredited educational programs for the training of CNS's. 2) Several hospitals already have staff designated as clinical nurse specialist (CNS) even though the term CNS is not yet standardized or adopted in nationwide. 3) The role of the CNS is not clearly understood by the medical societies, or even nursing societies. A nurse who works in specific nursing areas such as central supply, kidney dialysis, intensive care, coronary care, etc. for a long time, considers herself /himself a CNS. Based upon the above findings, the following alternatives are recommended. 1) The role of the CNS should be defined according to specified functions and authority : professional autonomy ; counselling and educating patients and their familes, nurses, and even other medical personnel ; research on improvement of nursing ; and management of the nursing environment including medical resources, information, and cases. 2) the qualification of CNS should be attained only by a nurse who has an RN license and clinical experience of more than 3 years in a specific nursing field: passes a qualifying examination; and contributes to the professional development of peers, colleagues, and others. A master's degree should only be optional, because of the insufficient of graduate programs which are well designed for the CNS. 3) The CNS should initially be a head nurse rather than line staff in order to deal with as wide an experience base as possible. 4) The nursing specialty could be divided into two areas such as a clinical field and a community field. The clinical field could then be categorized by the Styles' classification such as diseases and pathogenics, systems, ages, acuity, skills/techniques, and function/role ; the community field could be classified according to work site.

  • PDF

Resear cher & Coordinator, Canal Reseach & Development, japan (농업수리시설과 소수로굴착용 Trencher V형의 개발에 대하여)

  • 영목청
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.21 no.2
    • /
    • pp.28-36
    • /
    • 1979
  • One of most important problems in the Monsoon Asia today is the production of rice paddy to meet the needs of the ever increasing population. Diversemeans are being employed to meet this demand, both by increasing productivity of existing farm land and by bringing further areas into cultivation. The primary step in either field is to ensure that there is sufficient moisture in the soil to suit the paddy, and at the same this means that excess moisture has to be drained off the land, while in others irrigat ion has to be employed to bring sufficient water to an area. In view of the fact that the project comprises a huge amount of earthwork, it can be carried out by extensive use of construction machinery in order to shorten the period. As farm ditch has a comparatively small section with shallow cutting depth, inaddition, there is lack of access road in the field, the excavation equipment with bulldozer or tracter-shovel (backhoe) type are not applicable because there are mostly adapted for the excavation of deep and wide section. Mini-backhoe with its bucket width not larger than 0. 3m, and width of blade not larger than 1. 00m seems to be more adaptable. About 80% of excavation of ditch section will be done by the machinery while the other 20% of excavation together with the finishing of the section are supposed to be done by man-power. The embankment of ditch section can be compacted by the crawler of backhoe when it is moving along the ditch for excavation. However, Lowland paddy field in the Monsoon Asia are made particulary in rain season, therefore, heavy machinery is not easy excavation for ditch. It is very important to know exact ground support power of the working site and select machines with corresponding ground pressure. Ground support power is variable subject to quality and water content of soil and therefore selection of machines should be made duly considering ground condition of the site at the time of construction works. Farm ditches dug and compacted by mannual labar are of poor quality and subject to destruction after one or two years of operation. On the other hand, excavation and compaction by bulldozer is not practical for ditches. Backboe is suitable for slope land, but this is required cycle time of bucket excavation and dumped out. If a small-scale farm ditch trencher adaptable to lowland paddy field is invented, such a machine could greatly accelerate the massive construction work envisaged in many countries and thus significantly speed up the most difficult part of irrigation development and management in Monsoon Asia.

  • PDF

The analysis for attributes of OUV of the capital of Shilla Kingdom (세계유산 신라왕경의 탁월한 보편적 가치 속성 분석)

  • KIM, Euiyeon
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.151-174
    • /
    • 2022
  • According to the "Special Act on the Restoration and Maintenance of the Core Relics of the Shilla Kingdom" enacted in 2019, the Shilla Kingdom refers to the capital of Shilla and Unified Shilla period, and refers to Gyeongju, where the king lived, and the nearby area. Shilla Wanggyeong is a heritage registered on the UNESCO World Heritage List in 2000 under the name of Gyeongju Historic Site and belongs to Wolseong District, Hwangnyongsa District, and Daeneungwon District among the five districts registered as Gyeongju Historic Site. Unlike the Namsan and Sanseong districts, the Shilla Kingdom is a heritage consisting mostly of archaeological sites without physical substance. Gyeongju City sought to promote local tourism while providing more direct experiences to visitors by restoring the heritage that constitutes the Shilla Kingdom. Starting with the restoration of Woljeonggyo Bridge in 2005, the Shilla Wanggyeong restoration project began in earnest. Gyeongju City tried to restore the building site on the west side of Donggung Palace and Wolji after Woljeonggyo Bridge, but it was canceled due to opposition from the UNESCO World Heritage Committee. The World Heritage Committee opposed the restoration and recommended a heritage impact assessment for similar projects in the future. During the miscarriage impact assessment procedure, there is an OUV attribute analysis process of the heritage to be evaluated. This study intends to preemptively derive OUV attributes for the Silla Kingdom through literature and overseas case analysis. In the case of literature research, domestic and foreign research data related to the UNESCO World Heritage Convention and World Heritage Management were examined, and in overseas cases, the architectural works of Krakow Historical District, Stonehenge and Abbury Geoseok Ruins in England, and Le Corbusier were analyzed. Through this, the outstanding universal value attributes of the Silla Kingdom were derived. This study is expected to be used as a reference in the process of restoration projects of other heritage constituting the Shilla Kingdom or construction plans in nearby areas in the future and serve as an indicator to improve the management system of the Shilla Kingdom more efficiently from the perspective of world heritage.

Geoscientific land management planning in salt-affected areas* (염기화된 지역에서의 지구과학적 토지 관리 계획)

  • Abbott, Simon;Chadwick, David;Street, Greg
    • Geophysics and Geophysical Exploration
    • /
    • v.10 no.1
    • /
    • pp.98-109
    • /
    • 2007
  • Over the last twenty years, farmers in Western Australia have begun to change land management practices to minimise the effects of salinity to agricultural land. A farm plan is often used as a guide to implement changes. Most plans are based on minimal data and an understanding of only surface water flow. Thus farm plans do not effectively address the processes that lead to land salinisation. A project at Broomehill in the south-west of Western Australia applied an approach using a large suite of geospatial data that measured surface and subsurface characteristics of the regolith. In addition, other data were acquired, such as information about the climate and the agricultural history. Fundamental to the approach was the collection of airborne geophysical data over the study area. This included radiometric data reflecting soils, magnetic data reflecting bedrock geology, and SALTMAP electromagnetic data reflecting regolith thickness and conductivity. When interpreted, these datasets added paddock-scale information of geology and hydrogeology to the other datasets, in order to make on-farm and in-paddock decisions relating directly to the mechanisms driving the salinising process. The location and design of surface-water management structures such as grade banks and seepage interceptor banks was significantly influenced by the information derived from the airborne geophysical data. To evaluate the effectiveness ofthis planning., one whole-farm plan has been monitored by the Department of Agriculture and the farmer since 1996. The implemented plan shows a positive cost-benefit ratio, and the farm is now in the top 5% of farms in its regional productivity benchmarking group. The main influence of the airborne geophysical data on the farm plan was on the location of earthworks and revegetation proposals. There had to be a hydrological or hydrogeological justification, based on the site-specific data, for any infrastructure proposal. This approach reduced the spatial density of proposed works compared to other farm plans not guided by site-specific hydrogeological information.

An Analysis of Cost Reduction Potentials for Modular Housing from the Long-term Perspective (장기적 관점에서의 모듈러 주택 공사비 절감기회 분석)

  • Kim, Hu Yong;Ryu, Kuk Mu;Kim, Kyoon Tai;Jun, Young Hun;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.124-134
    • /
    • 2018
  • Despite the many advantages of modular housing, low preference for modular housing for consumers who are familiar with RC structure leads to high construction cost of modular housing. The cost of modular buildings is about 130% of that of RC structures, so it is urgent to secure economical efficiency of modular buildings. Therefore, in this study, after calculating the savings amount of modular housing by type of construction work, economic analysis was conducted from a long - term perspective. In order to carry out the research, the authors compiled and analyzed the material cost, labor cost, and expenses incurred by each type of work by reclassifying the statement of the modular housing into the factory production and the site installation. After that, Pareto diagrams were created to find a core work that is included in the cost ratio of about 80%, and selected it as a cost reduction subject. Based on the assumption that the market size of domestic modular housing is similar to the level of modular advanced countries such as Japan and European countries, six cost reduction methods were set up that reflects the characteristics of the modular construction method and used for the expert interviews. Cost saving potentials in percentage from the interview were converted to the amount of savings that can be achieved by each type of method when applying the method. Finally, the findings of the study are expected to suggest long-term directions for technical development for modular construction and cost savings.

A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

Improvement of Contract Change Order System for the Fairness of Subcontracting in Public Construction Projects (공공건설공사의 하도급 거래 공정화를 위한 계약변경 제도개선 방향)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.3-10
    • /
    • 2020
  • Subcontracting of construction is essential to carry out public construction projects. Subcontractor of the construction work shall enter into a contract with the original contractor without directly entering into a contract with the owner. Subcontracts are therefore greatly affected by the original contract with the owner. To protect subcontractors, the Fair Trade Act is enacted and the construction company's standard subcontracting contract is in operation. However, subcontracts are not properly reflected in the Government contract system, which deals with the relationships between the owner and the original contractor. In particular, the subcontractor may complain of difficulties at the public construction site as such procedures are not properly reflected in the construction work standard subcontract, although various procedures shall be carried out depending on the amount when change order occurs in subcontracts. Thus, the direction of improvement of subcontracting systems was proposed in the case of change order at public construction project sites as follows: First, the rights of subcontractors should be strengthened. Second, in order to resolve the information non-identity, subcontractors should have access to information related to subcontracts. Third, the status of subcontractor shall be guaranteed by reflecting the characteristics of the subcontract when the original contract for public works is concluded. Fourth, the dispute settlement method should be prioritized over litigation in order to fair subcontracting.

A Study on Civil and Criminal Liabilities of 119 Rescue and Its Legal Protection (공무원인 119구급대원의 직무수행과 관련하여 발생할 수 있는 민$\cdot$형사상 책임과 그에 따른 법적 보호를 위한 대책에 관한 연구)

  • Bae Hyun-A;Yun Soon-Young;Jung Koo-Young;Lee Kyung-Whan;Kim Chan-Woong
    • Fire Science and Engineering
    • /
    • v.19 no.2 s.58
    • /
    • pp.45-62
    • /
    • 2005
  • This thesis has defined the legal status of 119 rescue who plays a major role in the Korean prehospital emergency medical system and reviewed the various issues that may occur depending on work related legal liabilities. As a result, the purpose of this study was to represent the countermeasures for legal protection of 119 rescue required for the quality improvement of prehospital emergency medical system and as well as the countermeasures for risk management prepared for its related lawsuits. The legal liabilities of 119 rescue officers can be divided largely into public law liabilities and civil and criminal liabilities. In order to decrease the incidences of legal problems and provide the legal protection to rescue officers, the liability of supervising physician should be emphasized when the emergency medical practice is performed by a rescue officer under their supervision by consolidating medical control and the rescue officer should have legal liability on his emergency medical practice. itself Also, the emergency medical service guideline for 119 rescue officers should be prepared and their works should be performed according to such a guideline and procedures. In addition, the accurate legal documentation on emergency medical system from on-site to ER and related mobilization should be framed and preserved. Moreover, it is required to enact a new law such as the Good Samaritan Act or the Rescue Officers Protection Act.

The Analysis of Parcels for Land Alternation in Jinan-Gun jeollabuk-Do based on GIS (GIS 기반 전라북도 진안군의 토지이동 필지 분석)

  • Lee, Geun Sang;Park, Jong Ahn;Cho, Gi Sung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.1
    • /
    • pp.3-12
    • /
    • 2014
  • Cadastre is a set of activity registering diverse land information in national scope land management works. A nation examine land information and register it in a cadastral book, and must update data when necessary to properly maintain the information. Currently, local governments execute work about parcels of land alternation by manual work based on KLIS road map. Therefore, it takes too much time-consuming and makes problem as missing lots of parcels of land alternation. This study suggests the method selecting the parcels of land alteration for Jinan-Gun of Jeollabuk-Do using the GIS spatial overlay and the following results are as belows. Firstly, the manual work on the parcels of land alteration was greatly improved through automatically extracting the number and area of parcels according to the land classification and ownership by GIS spatial overlay based on serial cadastral maps and KLIS road lines. Secondly, existing work based on KLIS road lines could be advanced by analyzing the parcels of land alternation using the actual-width of the road from new address system to consider all road area for study site. Lastly, this study can supply efficient information in determining the parcels of land alternation consistant with road condition of local governments by analyzing the number and area of parcels according to the land classification and ownership within various roadsides ranging from 3m, 5m, and 10m by GIS buffering method.