• Title/Summary/Keyword: Mal-Operation

Search Result 65, Processing Time 0.037 seconds

An Adaptive Setting Method for the Overcurrent Relay of Distribution Feeders Considering the Interconnected Distributed Generations

  • Jang Sung-Il;Kim Kwang-Ho;Park Yong-Up;Choi Jung-Hwan;Kang Yong-Cheol;Kang Sang-Hee;Lee Seung-Jae;Oshida Hideharu;Park Jong-Keun
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.357-365
    • /
    • 2005
  • This research investigates the influences of distributed generations (DG), which are interconnected to the bus by the dedicated lines, on the overcurrent relays (OCR) of the neighboring distribution feeders and also proposes a novel method to reduce the negative effects on the feeder protection. Due to the grid connected DG, the entire short-circuit capacity of the distribution networks increases, which may raise the current of the distribution feeder during normal operations as well as fault conditions. In particular, during the switching period for loop operation, the current level of the distribution feeder can be larger than the pickup value for the fault of the feeder's OCR, thereby causing the OCR to perform a mal-operation. This paper proposes the adaptive setting algorithm for the OCR of the distribution feeders having the neighboring dedicated feeders for the DG to prevent the mal-operations of the OCR under normal conditions. The proposed method changes the pickup value of the OCR by adapting the power output of the DG monitored at the relaying point in the distribution network. We tested the proposed method with the actual distribution network model of the Hoenggye substation at the Korea Electric Power Co., which is composed of five feeders supplying the power to network loads and two dedicated feeders for the wind turbine generators. The simulation results demonstrate that the proposed adaptive protection method could enhance the conventional OCR of the distribution feeders with the neighboring dedicated lines for the DG.

Development of the Algorithm for Discriminating Faults from Variation using Wavelet Transform (웨이블릿 변환을 이용한 고장과 Variation의 유형 구분 알고리즘 개발)

  • Seo, Hun-Chul;Lee, Soon-Jeong;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.8
    • /
    • pp.1460-1466
    • /
    • 2011
  • This paper proposes the algorithm for discriminating faults from the variation due to the operation of non-linear components to prevent the mal-operation of protection relay in the distribution system. An IEEE 13 node test feeder is modeled to analyze the characteristics of the fault and each variation using EMTP-RV. Simulations with various operating conditions of transformers, non-linear loads, and unbalanced loads are performed using the test feeder model. Based on simulation results, the wavelet transform is adopted to analyze the current waveforms from the faults and variations to find out the differences between them and the algorithm for discriminating faults from the variation is proposed. The proposed algorithm is verified by using the current waveforms simulated in the KEPCO's distiribution system and IEEE 13 node test feeder.

An Enhanced Compensation Algorithm for the CT Saturation Using Interpolation-based LSQ(Least Square) Fitting Method (내삽법 기반의 최소자승법을 이용한 개선된 CT 포화 복원 알고리즘)

  • Ryu, Ki-Chan;Kang, Sang-Hee;Lee, Bong-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.14-15
    • /
    • 2006
  • A saturation of magnetic flux in the core may occur when a large primary current flows when the iron-cored current transformer is used. This saturation makes the distorted secondary current of the CT. the distorted secondary current may cause the mal-operation or operation time delay of protective relays. CT compensation algorithm using The LSQ(Least Square) fitting method has a problem. It needs to acquire enough data for executing this algorithm without an error. In this paper, an enhanced algorithm using interpolation based LSQ(Least Square) Fitting Method is proposed. The Lagrange Interpolation Method is used for the interpolation and CT is simulated by EMTP. The results show that the proposed algorithm can accurately compensate a distorted secondary current more than existing Algorithm when the saturation severely occurs.

  • PDF

AR Model and LSQ Based Compensation Method for the Saturated Secondary Current of a Current Transformer (AR 모델 및 LSQ 기반 변류기 2차 전류 복원 기법)

  • Chang, Soo-Young;Lee, Dong-Gyu;Kang, Sang-Hee
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.6
    • /
    • pp.221-226
    • /
    • 2006
  • The current flowing though a power line is measured by a current transformer (CT). Since a CT is a kind of transformer, saturation of magnetic flux in the core may occur when a large primary current flows. This saturation makes the secondary current of a CT distorted and causes problems in the protection point of view. Because of the current distortion, a protection relay cannot collect the correct information showing how the primary power system changed. Consequently, the current distortion may cause the mal-operation or operation time delay of protective relay. In this paper, an algorithm based on AR model and LSQ is proposed to compensate the saturated CT secondary currents. Various test results indicate that the proposed algorithm can accurately compensate a severely distorted secondary current and is not affected by remanence.

The Improvement of NGR for Power Transformer Open Circuit Protection (전력용변압기 단선 보호용 NGR 성능 개선)

  • Kang, Y.W.;Shim, E.B.;Kwak, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11d
    • /
    • pp.83-88
    • /
    • 2004
  • As the electric system is getting larger to meet the increasing demand for electric power, the rating of power apparatus is becoming inevitably higher in its working voltage and larger in its capacity. According to KEPCO reports, power transformers in the KEPCO system have undergone troubles such as winding short insulation breakdowns every year since 1981. the cause of this troubles were high one line grounding fault currents in KEPCO systems that had direct grounding systems. KEPCO has installed the NGR(neutral grounding reactor) to lower this fault current and reduced winding short insulation breakdowns in power transformers. But when a circuit breaker opened a no load bus, some trips of circuit breakers for protecting transformer have occurred by mal-operation of 59GT(overvoltage ground relay) that detect disconnection of NGR. Therefore, in this paper, we analyzed the cause and examined the effect of time delav circuit to prevent wrong operation of 59GT.

  • PDF

Agent based algorithm for detecting sympathetic inrush of a transformer (Agent 기반 변압기의 Sympathetic inrush 판단 방법)

  • Kang, Yong-Cheol;Lee, Byung-Eun;Park, Jong-Min;Hwang, Tae-Keun;Jang, Sung-Il;Kim, Yong-Gyun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.234-235
    • /
    • 2006
  • The protection relay keeps electric power facilities by using signals of the voltage and current which are input and output terminals of each equipment. Each relay performances protection algorithm by using informations of own protecting zone. To prevent the mal-operation in inrush current, established transformer differential protection method uses the second harmonics as blocking signal. This method is not operate at the initial inrush. However, in case of the parallel operation, if the initial inrush is occurred in one transformer which is generated, the sympathetic inrush Is occurred in adjacent transformer. This paper approach the sympathetic inrush detecting algorithm of a transformer based on agent. Proposed algorithm, when inrush current occurred, distinguish sympathetic inrush or not by using differential current of adjacent transformer. This algorithm have the advantage of the distinguishing initial inrush and sympathetic inrush at operation of parallel transformer

  • PDF

Correction of Overcurrent Protective Relay on Distribution Feeders Considering the Power Output of Wind Farm Interconnected with Utility Networks (계통 연계 풍력발전단지의 출력 조건을 고려한 배전선 과전류 계전기 정정)

  • Kim, J.W.;Jang, S.I.;Kim, K.H.;Yoo, N.S.;Park, H.J.;Song, D.S.;Lee, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.342-344
    • /
    • 2003
  • This paper describes the correction of overcurrent protective relaying set value in distribution networks interconnected with wind farm by dedicated line. The wind farm composed of wind turbine generators is one of the great energy sources; however, it would be also highly possible that the current in the point of common coupling is influenced by the output power of wind farm. So, the overcurrent relay applied in distribution feeders might generate trip signal for normal operation. In order to prevent the mal-operation of overcurrent relay, it is necessary to correct the relay's setting value according to the output power of end farm. This paper presents the influence of wind farm on the overcurrent relaying set value in distribution feeders for cases of fault as well as normal operation and proposes the basic strategy for correction of overcurrent relaying set value.

  • PDF

A Study of The Effect of Waiting time for Operation in the Operating Room on Preoperative Patients (수술환자에 있어 수술실내에서 수술대기 시간이 불안에 미치는 영향에 관한 연구)

  • Lee, Hea-Won;Lee, Kyu-Chung;Kim, Hae-Ock;Lee, Haik-Ock;Kim, Hea-Suk;Lee, Mi-Kyung;Song, Mal-Soon
    • The Korean Nurse
    • /
    • v.29 no.3
    • /
    • pp.36-48
    • /
    • 1990
  • This study was attempted to provide us with basic information on how to improve understanding with patients for operation, and to offer then better nursing and treatment. This kind of study will help scientific application to nursing practice and operating room. The data was collected by interviewing 29 patients who underwent the elective surgery under the general anesthesia at Y hospital in Seoul. The interview ran from October 15 to December 15, 1989. The research instrument was a anxiety measurement device (SAAI) originally developed by Spielberger, et al and modified by Jung-Tack Kim. 1. Hypothesis Testing Hypothesis one was that there would be a difference in state anxiety level according to a time difference in watiting for operation. This hypothesis was rejected(state.anxiety level one hour before operation P>.05, r-.747, State anxiety level half an hour before operation P>.05, r-.1550, state anxiety level just before operation, P>.05, r=.1099). However, state anxiety, evel appeared to be associated with a longer watiting period, like one day before operation (P<.05, r-.4628). Hypothesis two was that there would be a difference according to state anxiety level of patients for operation. This was rejected. (Change of blood perssure in systolie P>.05 r=.1082, Change of blood pressure in diastolic P>.05, r=.088, Change of pulse rate, P>.05, r-1.909) 2. Examining trait anxiety and state anxiety levels, the average level of trait anxiety was 42.034, and the average level of state anxiety one day before operation was 43,000. The average level of state anxiety was averaged 42.356 in a waiting room for operation. 3. Examining the state anxiety level by time period, the one hour before was 42.379 the level half an hour before 42.276, and the level just before operation 42.414. The low level of state anxiety was due to the fact that premedication was not eliminated. 4. Age and time period like one day before operation was related to state anxiety level (F=5.271, P<.0.01) and blood pressure in waiting room for operation. That is, state anxiety level and blood pressure of patients one day before operation appeared high. Sex was relation to changes of blood pressure ; the blood pressure of male patients appeard higer than of female patients. A marital status was also related anxiety level one hour before operation the married patient for operation showed a higher state anxiety level than that of the unmarried patient for operation. Education was similarily related to trait anxiety level in which highly educated patients show lower levels of trait anxiety than poorly educated ones. Motive for hospitalization was related to state anxiety level for patient one hour before operation (F=6.464, P<.05) likewise, patients who are supposed to undergo operation hastily showed higher levels of anxiety than patients who expect elective surgeries.

  • PDF

Removal of Renal Calculi by Nephrotomy in Two Dogs (개에서 신장결석의 제거를 위한 신절개술)

  • 정순욱;김진영;최치봉;이경리;최혜정;김지헌;정병현
    • Journal of Veterinary Clinics
    • /
    • v.17 no.2
    • /
    • pp.480-484
    • /
    • 2000
  • A 10 years old female Poodle weighing 4.38 kg and a 10 years old female Maltese weighing 4.33kg were referred to veterinary leaching hospital of college of veterinary medicine, Konkuk uni-versity because of hematuria and severa anorexia. Preoperative hematological and srum chemical values revealed that counts of WBC were $78.4{\times}10^3$,/TEX>/ul in the Poodle and $21.6{\times}10^3$in the Maltese, concentrations of BUN 105 and 13 mg/dl, concentrations of creatinine 4.0 and 1.4 mg/dl, concentration of ALKP 542 U/L in the Poodle and concentration of ALF 37 U/L in the Maltese, respectively. Radiographic findings were observed radiopaque bilateral nephroliths in the Poodle and right renal cal- culus in the Maltese. Ultrasonographic findings were showed hyperechoic mass with severe acoustic shadowing, which were ]ocated in the center of both kidneys parenchyma in the Poodle and in right kidney in the Maltese. Bisectional nephrotomy in right kidney for removal of calculus, which had ,sin- gle stone and more large than splitted stones in lets kidney in the Poodle, was performed under isnf- lurane anesthesia in 100% $O_2$. The time from temporary occlusion of blood flow to suture of incisioned kidney after removal of renal calculi was elapsed 12 minutes. During operation and until 24hrs after operation was infusioned mannitol and tranexanic acid solution. There were normal urination with yellow color in the Poodle at 3 days after operation and in the Maltese at 1 day and good appetite after 7 days and 1 day after operation. At 7 days and 9 days after operation, hematolgoical and seam chemical values repealed that counts of WBC were $29.8{\times}10^3/u1 in the Poodle and 13.1 {\itmes}10^3$/ul in the Mal- tese, concentrations of BUN 13 and 10 mg/dl. concentrations of creatinine 1.3 and 1.1 mg/dl, con-centrations of ALT 34 and 97U/L, concentraion of AST 10 U/L in the Poodle, respectively, By ultra-sonographic view there was not observed hyperechoic mass and radippaque calculus in operated kid-ney in radiographic view.

  • PDF

Gifted Students' Perceptions of On-line and Off-line Gifted Education in Mathematics (수학 영재교육에 대한 일반 영재학생과 사이버 영재학생의 인식 분석)

  • Hwang, Hee-Sook;Kim, Mal-Sook
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.22 no.3
    • /
    • pp.316-329
    • /
    • 2010
  • The purpose of this study was to examine how middle school students perceived the operation of on-line and off-line math-gifted education. The research questions were as follows: 1. How do students recognize the current situation concerning the operation of on-line and off-line gifted education? 2. How do students recognize the effect and satisfaction level of on-line and off-line gifted education? 3. How do students recognize the improvement of on-line and off-line gifted education? The subjects in this study were 591 students who included 208 in on-line classes and 383 in off-line classes. The results were as follows: First, the students who were enrolled in the on-line and off-line classes regarded gifted people as ones who had a superb ability in a particular field and as ones who think creatively. Second, all the students in on-line and off-line classes found gifted education to be of use to developing their potentials, and they had the biggest preference for experiential field study as the most effective teaching method. Third, concerning their needs for the management of gifted classes, they asked for immediate Q&A services over the Internet.