• Title/Summary/Keyword: Major Construction Company

Search Result 121, Processing Time 0.033 seconds

Enterprise Knowledge Management System(KMS) Construction - using Business Analytics Solution : A Case of KB Card (Business Analytics를 이용한 기업 지식관리시스템 구축 사례 연구)

  • Lee, Chung Keun;Lee, Soo Yong;Lee, Gun Hee
    • Knowledge Management Research
    • /
    • v.14 no.5
    • /
    • pp.137-149
    • /
    • 2013
  • Although business Intelligence system is introduced to many companies over the past decade, The result of business benefits from BI investment are not so significant than expected. But still successful BI system can provide the ability to analyse business information in order to support and improve management decision making across a broad range of business activities. In recently, Business Analytics System(BA) is emerging as advanced alternative of outdated and inefficient BI System. This study is focus on constructing procedure of BA system in KB card company, which is major credit card company in South Korea. In practice there were just few works that mentioned well-designed environment of KMS system, and other contribution of this study is to make a platform which invoke revelation of collective intelligence in data analytic professional users group.

  • PDF

Residual Stress Analysis for Repair Welding in Dissimilar Metal Weld (보수용접에 따른 이종금속 용접부의 잔류응력 해석)

  • Lee, Seung-Gun;Jin, Tae-Eun;Kang, Sung-Sik;Kwon, Dong-Il
    • Journal of Welding and Joining
    • /
    • v.27 no.4
    • /
    • pp.32-37
    • /
    • 2009
  • Alloy 600 and Alloy 82/182 materials have been used widely in PWR plants. But these materials are known to be susceptible to PWSCC(Primary Water Stress Corrosion Cracking). Recently, there have been several PWSCC events in major components due to repair welding, because repair welding in the dissimilar metal welds during the construction increases residual stress significantly on the inner surface of welds. In this paper, various residual stress analyses for repair welding were performed using FEM to check the effect of repair welding on residual stress distributions in PZR safety/relief nozzle. The results indicate that for inside surface repair welding, high tensile residual stress is developed on the inside surface of the nozzles.

Developing of Construction Project Risk Analysis Framework by Claim Payout and its Application

  • Kim, Ji-Myong;Park, Young Jun;Kim, Young-Jae;Yu, YeongJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.192-194
    • /
    • 2015
  • The growing size and complex process in construction project recently leads to increase risk and the losses as well. Even though researchers have identified the major risk indicators, there is lack of comprehensive and quantitative research for identifying the relationship between the risk indicators and economic losses associated with construction projects. To address this shortage of research, this study defines risk indicators and create a framework to assess the influence of economic losses from the indicators. An insurance company's claim payout record was accepted as the dependent variable to reflect the real economic losses. Based on the claims, we categorized the causes and results of accidents. To establish framework, built environment vulnerability indicators and geographical vulnerability indicators were employed as the risk indicators. A Pearson correlation analysis was adopted to validate the relationship with loss ratio and risk indicators. Consequently, this framework and its results may offer significant references for under writers of insurance companies and loss prevention activities.

  • PDF

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A Study on Differentiation Strategy of Apartment Space According to Brand Identity Factors (브랜드 아이덴티티 요소에 의한 아파트 공간의 차별화 전략 연구)

  • Choe, Hye-Jin;Kim, Kai-Chun
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.5
    • /
    • pp.105-113
    • /
    • 2011
  • Brand is a useful tool for modem people living under the age of the brand, to explain the information of their products by differentiating themselves from others. It also represents the value of company and plays a major role convincing customers. Even living space brands are no exception. According to the development of marketing management ability, living space brands require the new sales strategy to dominate the market over the business competition, and plan differently for a changing market environment. On such account, companies are commercializing the living space via establishing its brands. Thus the study will cover the living space differentiation strategies for promoting the brand images of respective construction companies and will strive to compare and analyze the differentiation strategy factors that construction firms are pursuing through case analysis framework. Moreover, it's objective focuses on materializing the strategies of living space in accordance to the brand application elements.

Delelopment of Cloud-Based ERP (Cloud 기반의 ERP 개발)

  • Jang, Dai-Hyun;Shin, Seong-Yoon;Lee, Hyun-Chang
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2019.05a
    • /
    • pp.147-148
    • /
    • 2019
  • In this paper, we propose cloud-based site-oriented ERP development for a construction company. The ERP development was aimed at the development of web-based user service portal and management portal, middleware development based on WCF (Windows Communication Foundation), and client SW development based on WPF (Windows Presentation Foundation). Major developments of ERP are the process refinement of the use process of the small and medium construction, user-oriented UI design, process slimming and automation.

  • PDF

A study on the quality improvement plan of recycled aggregate concrete for the use of building materials (건축자재 활용을 위한 순환골재 콘크리트의 품질개선 방안 연구)

  • Kim, Tae-Hyun;Hong, Sung-In;Choi, Yun-Jeong;An, Jae-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.162-163
    • /
    • 2022
  • Recycled aggregate has structural limitations in that it cannot be actively used for use as a structural building material due to quality deviations such as increase in cracks, decrease in constructability during in-situ casting, and decrease in strength. Although the government gives incentives to use recycled aggregate concrete for major structural parts of buildings to revitalize recycled aggregate concrete, there is a perception that the quality control of recycled aggregate producers that produce raw materials is insufficient. In this study, recycled aggregate, I checked the quality of the company that handles the quality. We are working on this.

  • PDF

A study on the Interior Space Composition of Apartment desired by Housewives (주부들이 원하는 아파트 실내공간의 평면구성특성에 대한 연구)

  • 이선미;이연숙
    • Korean Institute of Interior Design Journal
    • /
    • no.17
    • /
    • pp.173-180
    • /
    • 1998
  • The aim of the study was to grasp the current trends and to predict the future trends of space composition characteristics by analyzing floorplans drawn by housewives as their ideal apartments. The content analysis method was used for this study. This research used data from a competition held in 1993 by a housing construction company. Among 3,102 floorplans collected 12,232 were selected by Proportional Stratified Sampling Method. The major findings are as follows; 1) Some major features were interpreted as current trends; respondents wanted new rooms that could accomodate various functions separated the private spaces from public trends; they wanted to expand the verandah both visually and actually put importance on the number of bathrooms and have the space for outdoor living and leisure activities.

  • PDF

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.