• Title/Summary/Keyword: Major Construction Company

Search Result 121, Processing Time 0.03 seconds

A Current Status Study on the Introduction of CM at Risk on the Domestic Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 도입 현황 분석)

  • Yoo, Seung-Kyu;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.5-8
    • /
    • 2009
  • This paper investigated the qualitative introduction status of domestic major construction company. And that focused on a point of suggestions about CM at Risk introduction. The survey analysis showed that three importan suggestions. First, the biggest obstacles factors to CM at Risk introduction that related laws is lagging amendment. Second, we have to improve the available hands ability in domestic major construction company. And last, we have to do that using uncomplicated design and standard design form. Consequently, environmen analysis for the introduction and example project is urgently required.

  • PDF

An Analysis of Capability of CM at Risk in Major Construction Company (국내 대형건설회사의 책임형 건설사업관리 역량분석)

  • Yoo, Seung-Kyu;Choi, Seok-In;Son, Chang-Baek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.85-94
    • /
    • 2009
  • For the purpose of analysing the capability (knowledge, experience, and ability) of CM at Risk in the major construction company in korea, this study performed questionnaire survey with experts in the companies. Based on the analysis of the survey, the study was found as follows. 1) It is needed to increase the capability of preconstruction services, such as project management plan/manual, contract documents, value engineering, alternative analysis, time management, and claim. 2) Despite of gap of the capability between the present and the future CM services, the study concluded that the capability is sufficient to perform CM at Risk project in the major construction company.

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

A study on management and judgement of defect-repair in private housing construction company (민간 주택건설회사의 하자보수에 대한 인식 및 실태에 관한 연구)

  • 윤정숙
    • Journal of the Korean Home Economics Association
    • /
    • v.33 no.5
    • /
    • pp.143-151
    • /
    • 1995
  • The purpose of this study is to suggest a defect-repair management and judgement of apartment housing for the private housing construction company. The objectives are : 1) to investigate how the defect-repair were managed and 2) to suggest the range, period of defect-repair and the proper managial size of housing company. Data were collected by the interviews from the heads of management departments of housing construction companies. Twenty-one companies selected were divided into three groups according to the amount of housing supply. Major result were as follows : 1) departments of defect-repair in housing construction company are divided into sub-system according to the size of housing supply. 2) the judgement of the range and period of defect-repair are extracted. They are, according to the order of their importance, constructional defect, functional defect, aesthetical defect and the defect in use.

  • PDF

FAULT-TOLERANT DESIGN FOR ADVANCED DIVERSE PROTECTION SYSTEM

  • Oh, Yang Gyun;Jeong, Kin Kwon;Lee, Chang Jae;Lee, Yoon Hee;Baek, Seung Min;Lee, Sang Jeong
    • Nuclear Engineering and Technology
    • /
    • v.45 no.6
    • /
    • pp.795-802
    • /
    • 2013
  • For the improvement of APR1400 Diverse Protection System (DPS) design, the Advanced DPS (ADPS) has recently been developed to enhance the fault tolerance capability of the system. Major fault masking features of the ADPS compared with the APR1400 DPS are the changes to the channel configuration and reactor trip actuation equipment. To minimize the fault occurrences within the ADPS, and to mitigate the consequences of common-cause failures (CCF) within the safety I&C systems, several fault avoidance design features have been applied in the ADPS. The fault avoidance design features include the changes to the system software classification, communication methods, equipment platform, MMI equipment, etc. In addition, the fault detection, location, containment, and recovery processes have been incorporated in the ADPS design. Therefore, it is expected that the ADPS can provide an enhanced fault tolerance capability against the possible faults within the system and its input/output equipment, and the CCF of safety systems.

The Effect of the Contingent Liabilities Caused by Project Financing of the Domestic Construction Firms

  • Kang, Namhee;Kim, Hyunjung;Choi, Jaehyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.683-684
    • /
    • 2015
  • Project Financing (PF) is the long-term financing of infrastructure and industrial projects based upon the projected cash flows of the project rather than the balance sheets of its sponsors. However, the financial institution, the subject of financing in the case of PF in Korea, the lack of validation system of business, rather than to assess the feasibility of the project, requested a credit reinforcement to the construction company, the fact is Construction Company on loans of the employer is the guarantor or debt argument commitments accordingly. As a result, PF contingent liabilities, which are indirect debt, are triggered in the construction company, not included in the financial statements, along with the disclosure standards established according to 2009 PF contingent liabilities, and major can be a management item. In this study, PF contingent liabilities is of Pearson of the index and the PF debt ratio showing the main financial ratios and risk by classifying the credit rating and contractors Ranking of construction companies in order to analyze the impact on the financial condition of the company was performed correlation analyzes, through the Pearson correlation coefficient analysis indicated quantitative or negative relationship to derive the explicit indication.

  • PDF

A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work (돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구)

  • Ha, Haeng-Bong;Bang, Myung-Seok;Lim, Kyu-Won
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

A Proposal of Quality Model for Alternative Evaluation of Major Construction Projects (건설공사에서 주요공종 대안평가를 위한 품질모델 제안)

  • Lee, Jong-Min;Seo, Bo-Ram;Son, Hyun-Jeong;Lee, Tae-Shim;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.43-44
    • /
    • 2019
  • Major construction projects will be directly related to construction costs and disclosure period depending on the selection of the construction method. However, there are some sites that choose without taking into account sufficient conditions. Therefore, the company wants to present a quality model that suits the characteristics of major engineering fields.

  • PDF

A Study on the inhabitants' Satisfaction Degree in the Defect-Management system (공동주택 하자처리과정에 대한 거주자 입장의 만족도 분석)

  • Suk Sung-Joon;Yoo Hyun-Kyoung;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.91-94
    • /
    • 2004
  • The demand for apartments is decreasing as the condition of housing market in Korea has changed. Therefore, construction companies have to understand the needs of the customers to win over them. It is important for construction companies not only to supply customers with high quality apartments but also to provide them high service quality for a long range plan. One of the important service of the construction companies is after-service(A/S) that includes the defect management. The inhabitants' unsatisfactory defect management will worse the image of the company among the future customers. Also A/S is one of the best way for the company to create good impression to the customers. so the defect management carried out by construction firms has to satisfy the inhabitants. In this study. the degree of association between inhabitants satisfaction and the company's image is proved and the factors of the inhabitants dissatisfaction in defect-management are presented. The major factor that causes dissatisfaction is the long service time of the defect management. Therefore, shortening the time of process taken to deal with the defects would allow construction outfits to satisfy their customers effectively and to be more competitive ones in the Korean apartment market.

  • PDF

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.