• Title/Summary/Keyword: Major(minor) Failure

Search Result 46, Processing Time 0.02 seconds

Maintenance Model for Multi-Component System Considering Failure Types (고장형태(故障形態)를 고려한 다부품장비(多部品裝備)의 보전모형(保全模型))

  • Jeong, Yeong-Bae
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.33-42
    • /
    • 1990
  • This paper proposes the maintenance model of multi-component system when the failure characteristics and types of components are considered. In this model, it is assumed that a system is composed of a critical component, a major component and a minor component. Also, failure types is classified into major failure and minor failure. If major failure occurs to critical component before system age replacement time, the system is renewed. If major failure does not occur until its age replacement time, preventive maintenance is performed at age replacement time T. Minimal repairs are carried out after each minor failure. Major component is minimal-repaired if any failure is discovered during operation. Minor component should be replaced as soon as any failure is found. This paper determines the optimal replacement time of the system which minimizes total maintenance cost. Numerical example illustrates these results.

  • PDF

Preventive Policy With Minor Failure Under Age and Periodic Replacement (경미한 고장을 수반하는 시스템에 대한 노화 및 예방적 교체 정책)

  • Lee, Jinpyo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.78-89
    • /
    • 2022
  • The purpose of this study was to propose useful suggestion by analyzing preventive replacement policy under which there are minor and major failure. Here, major failure is defined as the failure of system which causes the system to stop working, however, the minor failure is defined as the situation in which the system is working but there exists inconvenience for the user to experience the degradation of performance. For this purpose, we formulated an expected cost rate as a function of periodic replacement time and the number of system update cycles. Then, using the probability and differentiation theory, we analyzed the cost rate function to find the optimal points for periodic replacement time and the number of system update cycles. Also, we present a numerical example to show how to apply our model to the real and practical situation in which even under the minor failure, the user of system is not willing to replace or repair the system immediately, instead he/she is willing to defer the repair or replacement until the periodic or preventive replacement time. Optimal preventive replacement timing using two variables, which are periodic replacement time and the number of system update cycles, is provided and the effects of those variables on the cost are analyzed.

Optimum Free Warranty Interval for Repairable Items (수리가능한 아이템의 최적무상보증기간)

  • 정영배
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.45
    • /
    • pp.301-307
    • /
    • 1998
  • This paper proposes free warranty interval for repairable items when the failure types of item are considered. Failure types are classified into major failure and minor failure. If major failure occurs during warranty period, the item is replaced and if minor failure occurs during warranty period, the item is minimally repaired. This paper determines the optimum free warranty interval which minimizes total expected cost of the free warranty cost model. Numerical example is shown in which failure time of item has weibull distribution.

  • PDF

Age Replacement Policy for A System Considering Failure Characteristics of Components (부품(部品)의 고장특성(故障特性)를 고려한 시스템의 수명교환방침(壽命交換方針))

  • Jeong, Yeong-Bae
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.109-120
    • /
    • 1993
  • Most systems are composed of components which have different failure chracteristics. Since the failure characteristics of components is different, it is rational and reasonable to establish a maintenance model to be considered repair and replacement policies which are proper to failure characteristics of these components. This paper proposes the age replacement time for a system composed of components which have different failure characteristics. In this model, it is assumed that a system is composed of a critical failure component, a major failure component, minor failure component. If any failure occurs to critical component before its age replacement time, the system should be replaced. If any failure does not occur until its age replacement time, preventive replacement should be performed at age replacement time T. Major component is minimal repaired if any failure occurs during operation. Minor component should be replaced as soon as failure is found. This paper determines the optimal replacement time of the system which minimize, total maintenance cost and initial stock Quantity of minor component within this optimal replacement time. Numerical example illustrates these results.

  • PDF

A Production and Preventive Maintenance Policy with Two Types of Failures (두 가지 고장형태를 고려한 생산 및 예방보전 정책)

  • 김호균;조형수
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.3
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

The Comparative Study of the relationship between Technology Valuation Index and performance in Ventures (기술평가지표와 기업성과의 관계비교분석 -초기중소벤처와 성장중소벤처-)

  • Yang Dong-Woo
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1175-1198
    • /
    • 2005
  • The objective of the study is to verify the relationship between technology valuation indexes and corporate's performance in ventures by business operating periods. The result of the study is expected to be useful in loan evaluation, investment decision, internal management decision making and business improvement. The results of study is as follows. First, in early stage ventures, we find that three major valuation index(technology feasibility, economic efficiency, productivity) are significant ex-ante variables which are discriminating between firms' going concern and firms' failure. Second, in growth stage ventures, we find that three major valuation index(business feasibility, general marketability, technology marketability) are significant ex-ante variables which are discriminating between firms' going concern and firms' failure. Third, in early stage ventures, we find that at least thirty-eight minor valuation index elements are significant ex-ante variables which are discriminating between firms' going concern and firms' failure and in growth stage ventures, thirty-one minor valuation index elements are significant in various analysis' results.

  • PDF

Influence of Composition of Layer Layout on Bending and Compression Strength Performance of Larix Cross-Laminated Timber (CLT)

  • Da-Bin SONG;Keon-Ho KIM
    • Journal of the Korean Wood Science and Technology
    • /
    • v.51 no.4
    • /
    • pp.239-252
    • /
    • 2023
  • In this study, bending and compression strength tests were performed to investigate effect of composition of layer layout of Larix cross-laminated timber (CLT) on mechanical properties. The Larix CLT consists of five laminae, and specimens were classified into four types according to grade and composition of layer. The layer's layout were composited as follows 1) cross-laminating layers in major and minor direction (Type A), and 2) cross-laminating external layer in major direction and internal layer applied grade of layer in minor direction (Type B). E12 and E16 were used as grades of lamina for major direction layer of Type A and external layer of Type B according to KS F 3020. In results of the bending test of CLT using same grade layer according to layer composition, the modulus of elasticity (MOE) of Type B was higher than Type A. In case of prediction of bending MOE of Larix CLT, the experimental MOE was higher than 1.00 to 1.09 times for Shear analogy method and 1.14 to 1.25 times for Gamma method. Therefore, it is recommended to predict the bending MOE for Larix CLT by shear analogy method. Compression strength of CLT in accordance with layer composition was measured to be 2% and 9% higher for Type A using E12 and E16 layers than Type B, respectively. In failure mode of Type A, progress direction of failure generated under compression load was confirmed to transfer from major layer to minor layer by rolling shear or bonding line failure due to the middle lamina in major direction.

Do Radiology Residents Perform Well in Preliminary Reporting of Emergency MRIs of Spine?

  • Lee, Joon Woo;Lee, Guen Young;CHONG, Le Roy;Kang, Heung Sik
    • Investigative Magnetic Resonance Imaging
    • /
    • v.22 no.1
    • /
    • pp.10-17
    • /
    • 2018
  • Purpose: To evaluate interpretation errors involving spine MRIs by residents in their second to fourth year of training, classified as minor, intermediate and major discrepancies, as well as the types of commonly discordant lesions with or without clinical significance. Materials and Methods: A staff radiologist evaluated both preliminary and final reports of 582 spine MRIs performed in the emergency room from March 2011 to February 2013, involving (1) the incidence of report discrepancy, classified as minor if there was sufficient description of the main MR findings without ancillary or incidental lesions not influencing the main diagnosis, treatment, or patients' clinical course; intermediate if the correct diagnosis was made with insufficient or inadequate explanation, potentially influencing treatment or clinical course; and major if the discrepancy affected the main diagnosis; and (2) the common causes of discrepancy. We analyzed the differences in the incidence of discrepancy with respect to the training years of residents, age and sex of patients. Results: Interpretation discrepancy occurred in 229 of the 582 cases (229/582, 39.3%), including 146 minor (146/582, 25.1%), 40 intermediate (40/582, 6.9%), and 43 major cases (43/582, 7.4%). The common causes of major discrepancy were: over-diagnosis of fracture (n = 10), missed cord lesion (n = 9), missed signal abnormalities associated with diffuse marrow (n = 5), and failure to provide differential diagnosis of focal abnormal marrow signal intensity (n = 5). No significant difference was found in the incidence of minor, intermediate, and major discrepancies according to the levels of residency, patients' age or sex. Conclusion: A 7.4% rate of major discrepancies was found in preliminary reporting of emergency MRIs of spine interpreted by radiology residents, probably related to a relative lack of clinical experience, indicating the need for additional training, especially involving spine trauma, spinal cord and bone marrow lesions.

Empirical Study on Relationship Between ex-ante Early Stage Venture Technology Innovation Power and ex-post Firm's Performance (초기 중소벤처의 기술혁신역량과 기업성과의 관계에 관한 연구)

  • Yang, Dong Woo
    • Knowledge Management Research
    • /
    • v.7 no.1
    • /
    • pp.49-63
    • /
    • 2006
  • The objective of the study is to verify the discriminatory power of technology innovation in predicting Early Stage Ventures' success or failure. To accomplish this objective, we test early stage ventures'(Firm's period is below 3 years)technology innovation and performance. The result of the study is expected to be useful in loan evaluation, investment decision, internal management decision making and business improvement. The results of study is as follows. First, Early Stage Ventures' technology innovation power is composed of 4 major indexes(technology, marketability, manufacturing infra and economic feasibility). Second, we find that thirty-seven minor indexes are significant ex-ante variable which are discriminating between firms' success and failure in Early Stage Ventures. Also thirty-seven minor indexes explain 57.2% of the total variance. This explainable power of these indexes is similar to that of the existing 58 index elements. Finally, we find that the most important technology innovation power of Early Stage Ventures' is economic feasibility.

  • PDF

Anaysis of System Lifetime Subject to Two Classes of Random Shocks

  • Kunmin Yeo;Jun, Chi-Hyuck
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.49-64
    • /
    • 2000
  • We consider a system whose inherent life follows an Erlang distribution, which is subject to two heterogeneous random shocks. Minor shocks arrive according to a renewal process and each causes the system to fail independently with a certain probability. A major shock whose interarrival times follow an Erlang distribution causes the system to fail with probability one. The Laplace transform of the distribution of the time to system failure is derived in a functional form of the Laplace transform of the interarrival time distribution of minor shocks. An algorithm is given for the computation of the moments of the time to system failure.

  • PDF