• Title/Summary/Keyword: Maintenance plan

Search Result 1,043, Processing Time 0.025 seconds

The Economic Effects and Operating Characteristics of the Outdoor Unit in Accordance with Zoning Plan of Gas Engine Driven Heat Pump Installed in the University Building (대학 건물에 설치된 가스엔진구동 히트펌프(GHP) 실외기의 조닝 계획에 따른 운전 특성과 경제적 효과)

  • Park, Kang-Hyun;Kim, Su-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.1
    • /
    • pp.70-76
    • /
    • 2012
  • The purpose of this study is to analyze of the operating characteristics of the Gas engine driven Heat Pump(GHP) and to reduce maintenance costs through the most Economical plan. As the zoning modifications that have economic effects were confirmed. Applications should be made with a similar purpose of the space. The combination of a modified space has led to reduced operating hours of the outdoor unit. The reduction of the outdoor unit operating hours, reducing maintenance costs accordingly. When analyzed at six years have elapsed, the amount of savings through zoning modifications is more than an additional construction cost. During the design phase, cost-effective operation of the GHP is required for the proper zoning plan.

Conceptual Simulation Model for Evaluating Availability of Railway System (철도 시스템 가용성능 시뮬레이션 개념 모형)

  • Kim, Jong-Woon;Kim, Hee-Wook;Ohn, Jung-Ghun;Kwon, Tae-Soo;Jeong, Do-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1241-1245
    • /
    • 2011
  • High RAM performance and efficient operation plan and maintenance equipment and policies are needed for improving the system availability performance such as punctuality and schedule adherence while reducing life cycle cost. Because railway systems are repairable, complex and have multi-echelon maintenance support structure, it is much complicated to set RAM performance targets and operation and maintenance plan. It is not easy to solve these problem by mathematical method and simulation can be consider for them. This article suggests the conceptual simulation model for analysing availability of railway system which has complex system structure and operation/maintenance environment.

  • PDF

The Improvement of Wetland Conservation Plan for Upo Wetland Protected Area (우포늪 습지보호지역 보전계획 개선방안)

  • Kim, Su-Ryeon;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.65-80
    • /
    • 2019
  • The Wetland Conservation Plan is used as a tool to set the management direction of wetland protected areas, and which is establishing a plan for the conservation, wise-use, and management based on wetland's condition. This study was conducted to establish a conservation plan considering the functions and management conditions of Upo wetland protected area. To this end, there are analyzed the current issues, plans and implementation status of Upo Wetland Conservation Plans in the past. The management elements to be considered in establishing the Wetland Conservation Plan were selected through prior research analysis and the priority of those elements was identified through the AHP. As a result, it was found that lack of considering the changes and performance evaluation of the existing plans in wetlands, conducting short-term projects related to maintenance original function of wetland, different management methods for wetland protected areas and other adjacent areas, lack of understanding and cooperation by stakeholders, inconsistencies in timing of the Conservation Plan and survey of wetland protected areas. In order to improve the problem, it needs to include the performance evaluation stage of establishing the conservation plan, strengthen cooperation of stakeholders and expertise, continuing of projects for wetlands' maintenance, priority of the project considering the management side, and to adjust the timing of plans to improve data availability.

Verification Efficiency the Trian Depot (성남~여주 복선전철 부발차량기지 배선 효율성 검증)

  • Kim, Byung-Kook;Woo, Sung-Won;Jung, Jae-Hyung;Shin, Hyun-Gon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2077-2081
    • /
    • 2011
  • Recently the train indusrty come to the fore because of Punctual, eco-friendly transportation system and becoming the main transportation. The construction plans for the trian depot for train's maintenance and storage increase constantly. For past few years, there were many construction plans, Bubal train depot, Gwangju train depot, Duckha train depot. Proper track distribution plan is important to carry out the design of railway depot for efficient maintenance operation and train storage. Through the proper design of track distribution plan, we can shorten the moving time, train movement distance, waiting time in train depot. In this paper, the verification of the track distribution plan's efficiency and appropriateness for railway depot as Bubal train depot's plan is studied and analyzed with the train depot management simulation program-Posrail(v1.0).

  • PDF

A Study on Developing the Guideline of Risk Management utilizing BCP technique for Airport Corporation (공항전문기업의 BCP기법을 활용한 위기대응 가이드라인 개발에 관한 연구)

  • Seo, Byung Seok;Shin, Do Hyoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.67-78
    • /
    • 2015
  • The purpose of the establishment of corporation's Business Continuity Plan(BCP) is to maintain corporations' own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review

Long-term Radiation Dose Reduction Plan of KHNP

  • Kim, Saeng-Ki;Shin, Sang-Woon;Lim, Byoung-Chan
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.2
    • /
    • pp.137-143
    • /
    • 2003
  • Annual radiation dose limit to radiation worker was substantially lowered in Korea by the adoption of 1990 recommendations of the International Commission on Radiation Protection (ICRP 60) in its legislation. On the other hand, radiation management environment in nuclear power plants is getting more worse because of the accumulation of radiation sources inside the system and the frequent need for maintenance according as the operation years of nuclear power plants increase. Therefore, Korea Hydro & Nuclear power Co., Ltd. (KHNP) has established a long-term 10 years plan from 2001 to 2010 for the reduction of radiation dose to workers. The plan is aimed for the reduction of annual dose per unit averaged over 5 years from 0.9 man-Sv in 2001 to 0.75 man-Sv in 2010 by radiation source reduction, equipment/tool improvement or new equipment development for easy maintenance, and the improvement of administration and system.

Case Study on Technology and Regulation Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 기술 및 제도 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.303-308
    • /
    • 2000
  • By means of analyzing of monitoring technology and monitoring regulation based on maintenance monitoring system installed in subway tunnel section, it needs monitoring system, development of operating program, monitoring analyzing system and development of analysis method, establishment of maintenance monitoring standard specification, and performance of responsible monitoring supervision for applying to subway monitoring maintenance effectively in future. It requires specialized monitoring and legislation of monitoring subcontract, improvement of monitoring work contract method, establishment the standard payment of monitoring, and effective calibration and correction of monitoring system in the plan of improving monitoring regulation.

  • PDF

Imperfect Preventive Maintenance Plan of Generation Unit Using Quasi-renewal Theory (Quasi-renewal 이론을 이용한 발전설비의 불완전한 유지보수 예방정비 계획)

  • Kim, Hyung-Jun;Byun, Yoong-Tae;Kim, Jin-O;Lee, Jun-Kyong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.5
    • /
    • pp.735-740
    • /
    • 2008
  • Recently, the research of PM (Preventive Maintenance) method on the RCM(Reliability-Centered Maintenance) of the system equipment is being actively advanced for a few years. For the most of the current power equipment maintenance, the state of the equipment after maintenance is assumed to be becoming 'as good as new ones' state. However, the state of the power equipment is maintained like the states of the between 'as good as new ones' and 'as bad as old ones' by imperfect maintenance that implies the life decrease of the equipment by frequent breakdown, the error of maintenance process, and so on. So, the Maintenance method considering the real case has to reflect Imperfect maintenance than perfect maintenance. This paper suggests the Preventive Maintenance method by using Quasi - Renewal Theory for the gas turbine equipment as deliberating the imperfect maintenance for the real cases.