• Title/Summary/Keyword: Maintenance phase

Search Result 569, Processing Time 0.029 seconds

The comparison of clinical changes during maintenance phase after non-surgical or surgical therapy of chronic periodontitis (만성 치주염에서 비외과적 또는 외과적 치주치료 후 유지관리기 동안 임상적 변화의 비교)

  • Kim, Jee-Hyun;Chung, Hyun-Ju
    • Journal of Periodontal and Implant Science
    • /
    • v.36 no.1
    • /
    • pp.69-84
    • /
    • 2006
  • Reports on the comparison of clinical effect between non-surgical and surgical therapy, and the change of the clinical parameters during maintenance phase have been rarely presented in Korea. This study was to observe the clinical changes during maintenance phase of 6 months in patients with chronic periodontitis treated by non-surgical or surgical therapy in Department of Periodontics, Chonnam National University Hospital. Among the systemically healthy and non-smoking patients with moderate to severe chronic periodontitis, twenty eight patients (mean age: 47.5 years) treated by non-surgical therapy (scaling and root planning) and nineteen patients (mean age: 47.3 years) treated by surgical therapy (flap surgery) were included in this study. The periodontal supportive therapy including recall check and oral hygiene reinforcement was started as maintenance phase since 1 month of healing after treatment. Probing depth, gingival recession. clinical attachment level and tooth mobility were recorded at initial, baseline and 1, 2, 3 and 6 month of maintenance phase. The clinical parameters were compared between the non-surgical and surgical therapies using Student t-test and repeated measure ANOVA by initial probing depth and surfaces. Surgical therapy resulted in greater change in clinical parameters than non-surgical therapy. During the maintenance phase of 6 months, the clinical effects after treatment had been changed in different pattern according to initial probing depth and tooth surface. During maintenance phase, probing depth increased more and gingival recession increased less after surgical therapy, compared to non-surgical therapy. The sites of initial probing depth less than 3 mm lost more clinical attachment level, and the sites of initial probing depth more than 7 mm gained clinical attachment level during maintenance phase after non-surgical therapy, compared to surgical therapy. Non-surgical therapy resulted in greater reduction of tooth mobility than surgical therapy during maintenance phase. These results indicate that the clinical effects of non-surgical or surgical therapy may be different and may change during the maintenance phase.

C4I Maintenance Priority Decision using Maintenance Metric

  • Kim, Kiwang;Kang, Dongsu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.12
    • /
    • pp.145-153
    • /
    • 2017
  • Systemic management is required at each phase of the C4I system life cycle to achieve information advantage in the battlefield through stable operation of the C4I system under the NCOE. In particular, the maintenance phase is the longest period of the C4I system life cycle, and it is easy to utilize and analyze data such as faults that occur during system operation. However, according to the previous research, the maintenance is evaluated as a phase in which the definition and management of comprehensive indicators are insufficient compared to other phase. In this paper, we propose the method of C4I Maintenance Priority decision using Maintenance metric. As a result of modifying the Naval Tactical C4I System's preventive maintenance cycle according to the priority, the total number of faults is reduced and the maintenance efficiency is improved.

Reliability Models for Application Software in Maintenance Phase

  • Chen, Yung-Chung;Tsai, Shih-Ying;Chen, Peter
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.1
    • /
    • pp.51-56
    • /
    • 2008
  • With growing demand for zero defects, predicting reliability of software systems is gaining importance. Software reliability models are used to estimate the reliability or the number of latent defects in a software product. Most reliability models to estimate the reliability of software in the literature are based on the development lifecycle stages. However, in the maintenance phase, the software needs to be corrected for errors and to be enhanced for the requests from users. These decrease the reliability of software. Software Reliability Growth Models (SRGMs) have been applied successfully to model software reliability in development phase. The software reliability in maintenance phase exhibits many types of systematic or irregular behaviors. These may include cyclic behavior as well as long-term evolutionary trends. The cyclic behavior may involve multiple periodicities and may be asymmetric in nature. In this paper, SGRM has been adapted to develop a reliability prediction model for the software in maintenance phase. The model is established using maintenance data from a commercial shop floor control system. The model is accepted to be used for resource planning and assuring the quality of the maintenance work to the user.

Development of Life Cycle Cost Model & System of the Road Tunnel (지하도로시설물의 LCC예측 모델 및 시스템 개발)

  • 조효남;선종완;김충완;민대홍
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.157-162
    • /
    • 2004
  • Recently, Life Cycle Cost (LCC) for civil infrastructures, such as pavements, bridges, and dams, has been emphasized. However there are few cost models for road tunnel especially for maintenance phase. The road network is composed of highways, bridges, and road tunnels. Thus it is as important as for road tunnels to keep safe for traffic. The maintenance strategies for road tunnels can be achieved based on the minimization of LCC in maintenance phase. For this purpose, in this paper, cost model and cost classification for road tunnel in maintenance phase are suggested.

  • PDF

The Effects of Additives on the Cooling Characteristic of a Clathrate Compound (포접화합물의 냉각특성에 대한 첨가제의 영향)

  • Kim Jin Heung;Chung Nak Kyu;Kim Suk Hyun;Kim Chang Oh
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.2
    • /
    • pp.125-130
    • /
    • 2005
  • This study was peformed to investigate the phase change temperature, the supercooling, the maintenance time of liquid phase and the change rate of volume of TMA 30 $wt\% clathrate compound with additives. TMA 30 $wt\% clathrate compound with additive was cooled at heat source temperature of $-6^{circ}C$. The additives are ethylene glycol and chloroform. Their concentration are 0.1$wt\% respectively. The experimental results showed that the phase change temperature was not affected by additives and this was average $5.3^{circ}C$. Also the supercooling and the maintenance time of liquid phase were decreased by additives. Especially, the average value of supercooling showed by $8.8^{circ}C$ and the maintenance time of liquid phase was by 19 minutes in the case of chloroform 0.1$wt\%. Additionally, the average change rate of volume showed by $1.26{\~}1.31\%$ according to additives and the volume was decreased by the phase change from liquid to solid.

MAINTENANCE PERFORMANCE EVALUATION OF THE BUILDINGS IN THE DESIGN PHASE

  • Hakyu Baeck;Chansik Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1138-1143
    • /
    • 2005
  • As the importance of building maintenance is being emphasized, studies regarding the efficient building maintenance focus on the evaluation of the maintenance plan, implementation and its cost only while the evaluation of the maintenance performance is nearly ignored. At this point when the importance is placed on the performance design we need to have methods to improve maintenance performance of the buildings in Design Phase. The purpose of this study was to set the design evaluation items to improve the maintenance performance of the buildings. Through the review of the existing literature, we set the concept of the maintenance performance and suggested evaluation items to evaluate the maintenance performance through the analysis of domestic and overseas certification and design guidelines.

  • PDF

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Case Study on Analysis the Problem and Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 문제점 분석 및 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03c
    • /
    • pp.93-104
    • /
    • 2000
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the methods of improvement were proposed for applying to subway monitoring maintenance effectively in future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

On condition based maintenance policy

  • Shin, Jong-Ho;Jun, Hong-Bae
    • Journal of Computational Design and Engineering
    • /
    • v.2 no.2
    • /
    • pp.119-127
    • /
    • 2015
  • In the case of a high-valuable asset, the Operation and Maintenance (O&M) phase requires heavy charges and more efforts than the installation (construction) phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs), we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM) approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.