• Title/Summary/Keyword: Maintenance free

Search Result 435, Processing Time 0.028 seconds

Maintenance Policies Following the Expiration of Two-Dimensional Free Replacement Warranty (2차원 무료 보증이 종료된 이후의 보전정책)

  • Kim, Ho-Gyun
    • Journal of Applied Reliability
    • /
    • v.15 no.1
    • /
    • pp.6-11
    • /
    • 2015
  • Maintenance plays an important role in keeping product availability, reliability and quality at an appropriate level. In this paper, two-types of maintenance policies are studied following the expiration of two-dimensional (2D) free replacement warranty. Both the fixed-maintenance-period policy and the variable-maintenance-period policy are based on a specified region of the warranty defined in terms of age and usage where all failures are minimally repaired. An accelerating failure time (AFT) model is used to allow for the effect of usage rate on product degradation. The maintenance model that arises following the expiration of 2D warranty is discussed. The expected cost rates per unit time from the user's point of view are formulated and the optimal maintenance policies are determined to minimize the expected cost rate to the user. Finally numerical examples are given to illustrate the optimal maintenance polices.

Preventive maintenance model following the expiration of NFRRW (비재생무료교체-수리보증이 종료된 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.22 no.4
    • /
    • pp.775-784
    • /
    • 2011
  • In this paper, we consider the periodic preventive maintenance model for repairable system following the expiration of non-renewing free replacement-repair warranty (NFRRW). Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Collision Free Path Planing of Articulated Manipulator for Remote Maintenance Using Sequential Search Method (원격 유지보수용 다관절 조작기의 순차 탐색에 의한 장애물 회피 경로계획)

  • 이종열;송태길;김성현;박병석;윤지섭
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.519-522
    • /
    • 1997
  • In this study, the collision free path planning method of the articulated manipulator using sequential search is proposed. This method is to find the joint path of the manipulator with many degrees of freedom from the distal joint to the proximal one. To do this, the initial work space of the gantry manipulator, which is a remote maintenance equipment of the radioactive environment, is defined from the condition that the distal joint configuration is determined by the posture of maintenance. Then, 2-dimensional configuration space with the obstacle area is represented and the collision free path of manipulator is searched in the configuration space. And, this method is verified using the graphic simulation in virtual workcell for the spent fuel disassembling processes. The result of this study can be effectively used in implementing the maintenance processes for the hot cell equipment and enhance the reliability of the spent fuel management.

  • PDF

A Cost Analysis Model of Minimal-Repairable Items in Free Replacement under the Periodic Maintenance Policy (정기보전제도에서 응급수리제품에 대한 무상수리 적용의 비용분석 모델)

  • 김재중;김원중;조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.39
    • /
    • pp.89-98
    • /
    • 1996
  • This paper is concerned with cost analysis model in free -replacement policy under the periodic maintenance policy The free-replacement policy with minimal repairable item is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost per unit time is calculated according to maintenance period Tin a viewpoint of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has beta distribution.

  • PDF

The Study of Control Algorithm for Stand alone PV System (독립헝 태양광 발전 시스템의 제어 알고리즘에 관한 연구)

  • Kim, Tae-Yeop;Jung, Maeng-Hwa;Goh, Gweon-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1382-1384
    • /
    • 2002
  • The flooded type battery is used for solar lighting system. Because the characteristic of flooded type battery is the short life time, the maintenance cost is high. So the using flooded type battery in this system is inappropriate. The valve regulated lead acid batter.(VRLA) is the maintenance free and cycle service purpose. This paper presents the development of control system and monitoring system to applied VRLA battery for maintenance free and long life time in system.

  • PDF

Competitive Effects of Annual Weeds on Soybeans. II. Effect of Weed-free Maintenance Period on the Growth and Yield of Soybeans. (대두의 일년생잡조와의 경합에 관한 연구 II. 잡초방제기간의 차이가 대두의 생육 및 수량에 미치는 영향)

  • Jong-Yeong Pyon;Young-Rae Kim
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.23 no.2
    • /
    • pp.150-153
    • /
    • 1978
  • A study was conducted to determine the critical period of weed-free maintenance required to produce maximum soybean yields. Leaf area index(LAI). crop growth rate (CGR), and number of pods per plant were increased with extended weed-free maintenance period. Consequently, maximum soybean yields were obtained when weeds were controlled for more than six weeks, but a relatively high level of ;soybean production was attained with only two weeks of weed free maintenance.

  • PDF

Warranty Models with Discrete Preventive Maintenance (이산예방보수 정책을 고려한 보증모형분석)

  • Kim, Che-Soong
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.286-296
    • /
    • 2002
  • Products which are sold with warranty, preventive maintenance actions by manufacturers and/or buyers have an impact on the total costs for both parties. In this paper, we develop the models to study the expected warranty cost for products with free repairable warranty with three types of discrete preventive maintenance. We deal with by utilizing the concept that preventive maintenance reduces the virtual age of the system. We assume that the maintenance planning horizon can be segmented into k discrete and equally sized periods. In such a scenario, numerical examples are presented.

Preventive Maintenance Model after Minimal Repair Warranty (최소수리보증 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.6
    • /
    • pp.865-877
    • /
    • 2010
  • This paper considers the periodic preventive maintenance model for a repairable system following warranty expiration. We consider three types of warranty policies: free repair warranty, pro-rata repair warranty, and combination repair warranty. Under these preventive maintenance models, we derive the expressions for the expected cycle length, the total expected cost, and the expected cost rate per unit time. In addition, we explain the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for a Weibull distribution case.

A study on the Longitudinal Force Variation of CWR according to the Condition of Track Maintenance (궤도보수 작업 조건별 장대레일 축력변화에 관한 연구)

  • Won, Yong-Hoan;Kim, Kwan-Hyung;Kwon, Soon-Jung;Lee, Seung-Youl
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.99-105
    • /
    • 2009
  • This research presents the method to decide proper locations for destressing of CWR using a non-destructive equipments to measure the longitudinal force(installation temperature) in CWR. The effect and necessity of destressing were analyzed by estimating changes of longitudinal force. The installation temperature was measured to find changes of longitudinal force in high speed and conventional lines before and after destressing or track maintenance at the locations where destressing was planed or where change of longitudinal force was expected during track maintenance. Past destressing was carried out within qualitative decision criteria. This research proposes the quantitative criteria to decide the priority order of the destressing locations reasonably by considering the difference of air temperature and stress free temperature during the track maintenances, the grade of ballast resistance force recovering and the length of destressing, etc.

  • PDF

Construction Case of Maintenance-free Track System in Application of Elastic Rail Fastening System for Sharp Curved Section (급곡선용 레일탄성체결장치를 사용한 생력화궤도 시공 사례)

  • Kong Sun-Yong;Kim Sang-Jin
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.382-388
    • /
    • 2005
  • SMSC(Seoul Metropolitan Subway Corporation) is substantially taking the core role of mass transit system in Seoul Metropolitan area. When it was built, the design had challenged to sharp curved tracks less than 250m radius considering the protection of buildings and cultural properties as well as the connection to ground roads. Such circumstances have required a certain extent of slack in track geometry and therefore led to the construction of ballasted track with wooden sleepers. However, the dynamic force from running on sharp curved track has caused the misalignment and abnormal failure of track geometry, and it has resulted in a frequent maintenance and repair works which require a lot of cost and manpower. In this paper, we present the construction case of maintenance-free track system by using of concrete sleeper and elastic rail fastening system to ensure the safety of both passengers and trains, and to contribute the effective maintenance for track facilities of SMSC.

  • PDF