• 제목/요약/키워드: Maintenance cost

검색결과 2,581건 처리시간 0.032초

철도차량 정비효율화에 관한 연구 (A study on the Maintenance efficiency of the Rolling-stock)

  • 유양하;김관형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1494-1500
    • /
    • 2008
  • Life cycle of the rolling stock is normally 20 to 40 years, though there is some difference in accordance with each vehicle. Maintenance cost is over the twice of purchasing price. and also it is true that precise statics is not managed properly except for some developed countries due to the difference of maintenance method, skills. After KORAIL introduced ERP system in 2007, maintenance cost is managed by type of cars, by unit. but, afterwards it should be controlled as an index and also more precisely. it is the best pending issues to make train maintenance efficiency, to utilize accumulated indexes. I want to attribute to train maintenance efficiency by analysing what is the problems in the present maintenance method.

  • PDF

신뢰성에 기반한 구조물 의사결정 방법 (Reliability - Based Decision Analysis for Structures)

  • 김이현;김동근;한서연
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.3208-3213
    • /
    • 2011
  • It has regarded an attempt to design and construct more safe structures as challenges such as fate. In order to operate public facilities safely, It can be taken how to improve the resistance to applied load by increasing the cross-section of structural members or by installing reinforcement. But inevitably such a way is accompanied by an increase of construction cost or maintenance cost. To make a cost-effective construction, Reliability-based decision analysis which can judge the adequacy of investment is suggested using statistical data of the load, resistance and the maintenance cost.

  • PDF

예방적 유지관리를 통한 교량의 생애주기비용 절감 효과 분석 (Bridge Life Cycle Cost Analysis of Preventive Maintenance)

  • 정유석;김우석;이일근;이재하
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제20권6호
    • /
    • pp.1-9
    • /
    • 2016
  • 본 논문은 교량의 예방적 유지관리 효과를 생애주기비용 절감 측면에서 분석 하였다. 예방적 유지관리는 현재 실시되고 있는 대응적 유지관리 전략과 대비 되는 유지관리 전략으로 교량의 열화지연을 통해 궁극적으로는 교량의 사용수명을 연장 시키며 생애주기비용을 절감시키는 유지관리 전략이다. 이러한 예방적 유지관리 효과를 분석하기 위해 교량의 공용연수에 따른 건전도 점수 변화 모델과 FHWA 자료를 바탕으로 한 국내 고속도로 교량의 건전도 점수에 따른 보수 보강 비용 모델을 제시 하였다. 제시한 복수의 모델과 국내외 참고 문헌을 바탕으로 제안된 예방적 유지관리 항목(청소와 도장)의 비용과 주기를 활용하여 사용수명 100년까지의 표준교량($1,730m^2$/교량) 당 생애주기 비용과 향후 20년간의 고속도로 총 유지관리 비용을 산정 하였다. 분석 결과 100년간 예방적 유지관리 활동으로 인해 교량 당 5억원의 절감효과를 볼 수 있으며 현재 예방적 유지관리 활동을 실시할 경우 20년 후(2035년)에는 총 1,837억원, 즉 연간 약 92억원의 비용 절감효과를 볼 수 있는 것으로 분석 되었다.

교량 유지관리비용 분석을 위한 대표 보수보강 비용모델 개발 (Development on Repair and Reinforcement Cost Model for Bridge Life-Cycle Maintenance Cost Analysis)

  • 선종완;이동열;박경훈
    • 한국산학기술학회논문지
    • /
    • 제17권11호
    • /
    • pp.128-134
    • /
    • 2016
  • 교량관리시스템(Bridge Management System, BMS)을 활용한 교량의 생애주기 관리를 위해서는 교량의 부재별 보수보강 비용 산정이 필수적이다. 본 연구에서는 BMS에 적용 가능한 체계적인 유지관리 비용 모델의 개발을 위하여 교량을 구성하는 대표 부재를 정의하고, 대표 부재별 세부 및 대표 보수보강 공법을 도출하였다. 세부 보수보강 공법별 단가를 산정하기 위해 표준 품셈과 실적 공사비를 이용해 각 세부 보수보강 공법별 일위대가를 구성하고, 적산 프로그램을 활용하여 보수보강 단가의 갱신이 용이하도록 체계적인 절차를 제시하였다. 또한 세부 보수보강 공법별 단가와 적용 빈도를 고려해 가중 평균 형태로 대표 보수보강 공법의 평균 단가를 산정하였다. 도출된 평균 단가를 기존의 실적 비용 단가와 비교 검증하여 적정성을 검토하였다. 제안된 평균 보수보강 비용 단가는 교량 유지관리 계획 수립 단계에서 요구 예산의 타당성을 검증하거나 보수보강 실적 비용의 적정성을 검토하는 데 활용될 수 있다. 본 연구를 통해 유지관리 비용 정보의 신뢰도와 의사결정의 합리성을 증진시킬 수 있을 것으로 판단된다.

시뮬레이션 모형과 실험설계법을 활용한 창정비 비용대 효과 분석 사례 (A Case Study on the Cost Effectiveness Analysis of Depot Maintenance Using Simulation Model and Experimental Design)

  • 김성곤;이상진
    • 한국시뮬레이션학회논문지
    • /
    • 제26권3호
    • /
    • pp.23-34
    • /
    • 2017
  • 본 연구는 복수 품목을 정비하는 단일 정비부대의 정비 프로세스를 시뮬레이션으로 모델링하였다. 이를 통해 정비능력을 공유한 정비창이 최적 비용으로 구성품 가동률과 목표 가동율 등을 달성하는지를 분석할 수 있다. 구성품 가동률과 정비시간 등을 핵심 성과지표로 하여 육군 항공기 정비단 엔진 정비프로세스에 대한 시뮬레이션 모델을 구성하고 실증연구를 하였다. 영향요소의 식별을 위해 NOLH 실험설계법을 적용하여, 33가지 시나리오를 구성하고 다중회귀분석을 수행하였다. 이 비용분석 연구를 통해 정비 프로세스의 개선사항을 식별할 수 있었다. 본 연구는 시뮬레이션을 통해 복수품목을 정비하는 단일 정비부대의 비용대 효과 분석 모형을 제공했다는데 의의가 있다.

베이지안 기법을 이용한 교량 점검 타당성 분석 및 유지관리 시나리오 제안 (Proposal of Maintenance Scenario and Feasibility Analysis of Bridge Inspection using Bayesian Approach)

  • 이진혁;이경용;안상미;공정식
    • 대한토목학회논문집
    • /
    • 제38권4호
    • /
    • pp.505-516
    • /
    • 2018
  • 교량 유지관리 전략 수립 시 현재 상태를 기반으로 미래 상태를 예측할 수 있어야 하며, 상태예측모델의 신뢰도가 높아질수록 효과적인 유지관리 의사결정이 가능하다. 그러나 인력기반 반복 주기적인 현행유지관리는 관리자가 목표하는 관리(등급)수준의 교량 상태를 정확히 예측하지 못해서 막대한 보수 보강비용이 발생될 가능성이 있고, 합리적인 유지관리 의사결정을 도모하는데 어려움을 겪는다. 이에 따라 본 논문에서는 국내 교량 점검 이력 데이터를 이용하여 불확실성을 고려한 교량 부재별 대표 상태예측모델을 개발하고, 개발된 상태예측모델을 실제 유지관리 대상 교량에 보다 높은 정확도로 적용 가능한 베이지안 업데이트 기법을 제안하였다. 또한, 모니터링 업데이트 상태예측모델 기반 예방적 유지관리가 기존 현행유지관리 대비 비용 효율성 측면에서 유리함을 제안하기 위해 각각의 유지관리비용 산출에 따른 교량 점검 타당성 분석을 수행하였다.

군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구 (Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project)

  • 박준호;송지훈
    • 한국산업융합학회 논문집
    • /
    • 제26권5호
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

교량의 내진성능확보를 위한 유지보수계획의 최적화 (Optimization of Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges)

  • 고현무;박관순;김동석;이선영
    • 한국지진공학회:학술대회논문집
    • /
    • 한국지진공학회 2002년도 춘계 학술발표회 논문집
    • /
    • pp.284-293
    • /
    • 2002
  • Using the life cycle cost concept, optimum maintenance and retrofit planning for reliable seismic performance is suggested the overall life cycle cost to be minimized including the initial cost, the costs of inspection, repair, and failure. Limit states of the bridges are defined. And failure probabilities are computed through crossing theory. The effect of maintenance and retrofit is represented using the probability of damage detection and event tree analysis. Optimization of maintenance and retrofit planning method proposed from this research was applied to numerical examples. The analysis incorporates the acceleration and site conditions prescribed in the code, and the quality of inspection methods.

  • PDF

발전기보수유지계획을 고려한 CO2배출량의 추정 (Assessment of the CO2 Emission Considering the Generator Maintenance Scheduling)

  • 전동훈;박정제;오태곤;조경희;최재석;백웅기
    • 전기학회논문지
    • /
    • 제59권9호
    • /
    • pp.1507-1513
    • /
    • 2010
  • The $CO_2$ emission can be decreased due to freedom of generator maintenance scheduling(GMS). This paper proposes assessment of $CO_2$ emission considering generator maintenance scheduling(GMS) and evaluates effect of the GMS on $CO_2$ emission. And also, this paper assesses the $CO_2$ emission and the probabilistic production cost simulation of nuclear and thermal power generators considering operation of hydro and pumped generator. The minimum reliability criterion level satisfied production cost minimization function model is used in this paper. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system in Korea in 2010.

서울메트로 차량 유지보수체계 정보시스템의 경제성 분석 (Economic Analysis for Vehicle Maintenance Information System of Seoul Metro)

  • 정충식
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.473-481
    • /
    • 2006
  • This study attempts to estimate economic benefits in terms of cost sayings and qualitative effects resulting ken implementation of new vehicle maintenance information system. It is widely expected that the effect of new vehicle maintenance information system will be significant in cost savings by information sharing and electronic documentation. To evaluate the economic feasibility of new system implementation, the study conducted seven subsystems case studies on the vehicle maintenance information system of Seoul Metro. Economic benefits are estimated by measuring the time savings, in turn, are calculated into cost savings by multiplying the average wages per hour of employee. The result of case study showed that over the 20 billion Won will be saved owing to new vehicle information system implementation. In conclusion, this study will contribute to the field of practices for the most, in evaluation of the economic benefits resulting from new information system implementation in the railway organization.