• 제목/요약/키워드: Maintenance Planning

검색결과 834건 처리시간 0.027초

애완동물과의 공생을 고려한 공동주택 계획요소 연구 (A Study on the Planning Elements for Apartment Residents Living with Companion Animals)

  • 김선아;이연숙;이수진
    • KIEAE Journal
    • /
    • 제5권2호
    • /
    • pp.27-34
    • /
    • 2005
  • The purpose of this study were to examine actual conditions of apartment residents living with their companion animals and to identify their residential stress and needs of planning elements under those conditions. Questionnaire survey was adopted in this study, and 100 cases were used for data analysis. The subjects for this study were limited to the residents breeding pets in their apartments. The results of this study are as follows: Most of the residents share their living spaces with pets together like their family without spatial restrictions. They indicated problems related to breeding pets in their residence such as walking the dog, cleaning home, leaving pets alone, noise and unpleasant smell. However, they didn't seem to be stressed a lot for their living environments. In terms of residential planning elements, floor plans for effective natural ventilation, balcony with sufficient sunlight, sound proof system, easy-maintenance interior material, unlash area, rubbish bin, mechanical ventilation and central vacuum system and safe electric outlet were highly indicated.

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권1호
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.

도시계획단계에서의 가상건설 적용에 관한 기초연구 (A Study on Introduction of Virtual Construction into Urban Planning)

  • 심진규;이혜인;김주형;김재준
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.170-175
    • /
    • 2007
  • Recently, construction industry in Korea is considering of various approaches for improving productivity and thus enhancing the competitive capacity in the global market. To this end, Korean Ministry of Construction & Transportation has launched R&D project in the field of automation, information systems, high value-added techniques. Furthermore, a new era of cities such as U-city and Eco-city is coming due to the government strategy for developing the country. In the regards of methodological development and trends of construction projects stated above, conventional methods for managing the projects is not likely to guarantee the success. Especially, in the planning and maintenance phases of such large scale cities, a new paradigm should be introduced. We thought of it as 3D object based simulation system for city planning. This paper describes the concept of the system.

  • PDF

유지보수를 고려한 철도차량 운용계획에 관한 연구 (A Study on the Rolling Stock Scheduling considering maintenance activities in Railway)

  • 김동회;홍순흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 춘계학술대회 논문집
    • /
    • pp.280-285
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long-term, mid-term. short-term, and real-time plan. The planning of vehicle and manpower resources is a main research topic in tactical short-term planning step. Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far, power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high-speed railway is introduced, the operational planning of trainset vehicles become important, In this paper, we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

고속철도차량의 유지보수계획 (Rolling Stock Maintenance Scheduling for High-Sneed Railway)

  • 김동희;홍순흠
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 춘계학술대회
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

항공기 부품의 생산 및 정비를 위한 공정 계획 시스템의 개발 (Development of a CAPP System for Production and Maintenance of Aircraft Parts)

  • 노경윤;강수준
    • 한국군사과학기술학회지
    • /
    • 제2권2호
    • /
    • pp.83-91
    • /
    • 1999
  • Dynamic characteristic of manufacturing stage is understood and the utilization of each machine is maximized by developing on-line dynamic CAPP system to consider the overloads in the aircraft part manufacturing line. In this paper, a scheme of production planning and scheduling system was proposed through inspection about some predeveloped CAPP system. Developed production planning and scheduling system included process planning module. After precise inspection of some FMS line schema at domestic heavy industry, optimized FMS line was applied to aircraft part manufacturing and repairing factory. By virtue of considering overloads of factory and machine through on-line dynamic CAPP system, the utilization of resources is maximized and manufacturing lead time is minimized.

  • PDF

만성 치주염에서 비외과적 또는 외과적 치주치료 후 유지관리기 동안 임상적 변화의 비교 (The comparison of clinical changes during maintenance phase after non-surgical or surgical therapy of chronic periodontitis)

  • 김지현;정현주
    • Journal of Periodontal and Implant Science
    • /
    • 제36권1호
    • /
    • pp.69-84
    • /
    • 2006
  • Reports on the comparison of clinical effect between non-surgical and surgical therapy, and the change of the clinical parameters during maintenance phase have been rarely presented in Korea. This study was to observe the clinical changes during maintenance phase of 6 months in patients with chronic periodontitis treated by non-surgical or surgical therapy in Department of Periodontics, Chonnam National University Hospital. Among the systemically healthy and non-smoking patients with moderate to severe chronic periodontitis, twenty eight patients (mean age: 47.5 years) treated by non-surgical therapy (scaling and root planning) and nineteen patients (mean age: 47.3 years) treated by surgical therapy (flap surgery) were included in this study. The periodontal supportive therapy including recall check and oral hygiene reinforcement was started as maintenance phase since 1 month of healing after treatment. Probing depth, gingival recession. clinical attachment level and tooth mobility were recorded at initial, baseline and 1, 2, 3 and 6 month of maintenance phase. The clinical parameters were compared between the non-surgical and surgical therapies using Student t-test and repeated measure ANOVA by initial probing depth and surfaces. Surgical therapy resulted in greater change in clinical parameters than non-surgical therapy. During the maintenance phase of 6 months, the clinical effects after treatment had been changed in different pattern according to initial probing depth and tooth surface. During maintenance phase, probing depth increased more and gingival recession increased less after surgical therapy, compared to non-surgical therapy. The sites of initial probing depth less than 3 mm lost more clinical attachment level, and the sites of initial probing depth more than 7 mm gained clinical attachment level during maintenance phase after non-surgical therapy, compared to surgical therapy. Non-surgical therapy resulted in greater reduction of tooth mobility than surgical therapy during maintenance phase. These results indicate that the clinical effects of non-surgical or surgical therapy may be different and may change during the maintenance phase.

대학시설(大學施設)의 유지보수공사(維持補修工事) 발생요인(發生要因)과 비용분석(費用分析) 연구(硏究) (A Study on the Causes and Cost analysis of Maintenance and Repair work in the University Facilities)

  • 이규주;이수용
    • 교육시설
    • /
    • 제9권3호
    • /
    • pp.5-12
    • /
    • 2002
  • This study attempts to suggest a standard for maintenance and repair cost per each unit area, by analyzing the causes and cost of various maintenance and repair work in the university facilities. The result of my study on the data of maintenance and repair work for 12 years between 1990 and 2001 in the two campuses of the university that I selected for my case study is the following. (1) The yearly average for maintenance and repair cost in the facilities of the university with 67 old and new buildings for the past 12 years was $W4,422/m^2$. In addition, the repair cost based on the calculation of the degree of decrepitude of the buildings was $W10,291/m^2$. (2) The number of causes of maintenance and repair work increase steadily every year, due to the development of universities and changes in the educational environment. A special case like a university merger also appears, which also demands maintenance and repair work of university facilities. (3) It is important that a budget for interior maintenance is increased or added to an extent, in order to minimize the maintenance and repair cost of the university facilities, and to cope with changing educational environments flexibly. (4) The publication of a white paper that includes the planning of a building, construction process, and changes in design, seems to be required for the sake of users' convenience and efficient maintenance and repair work.

열차종합제어장치 정보전송시 RTD시스템을 적용한 사례 연구 (A Study for Applied In the Transfer of Train Information using RTD System)

  • 신한철;김정현;김상훈
    • 한국컴퓨터정보학회:학술대회논문집
    • /
    • 한국컴퓨터정보학회 2011년도 제43차 동계학술발표논문집 19권1호
    • /
    • pp.109-110
    • /
    • 2011
  • 현대의 도시철도차량 시스템은 복잡하고 첨단화 되어 있으며, 상호 인터페이스 체계를 구축하고 있는 차량 유지보수시스템의 체계적인 종합관리가 필요하다. 본 연구는 무선 전송 장치를 이용하여 전동차 정보 자동 수집 장치를 도입 적용한 사례에 대한 분석 결과이다. 무선 전송 장치는 차량기지로 입고한 전동차 열차종합제어장치에 수집된 각종 정보를 무선 통신으로 데이터를 전송함으로써 유지보수 비용절감과 데이터 전송의 신뢰성 향상 효과가 있으며 이러한 무선 전송 장치를 도입 적용하여 기존의 열차정보수집 방법을 개선한 운용 사례를 제시한다.

  • PDF

빌트인형 BMR 시스템의 이동 중 충격완화를 위한 모션제어 (Motion Planning of Building Maintenance Robot System for Reducing Jerk Effect)

  • 이승훈;강민성;강성필;황순웅;김영수;문성민;홍대희;한창수
    • 한국정밀공학회지
    • /
    • 제30권4호
    • /
    • pp.368-374
    • /
    • 2013
  • Maintenance works for current high-rise buildings significantly depend on human labor, unlike other construction processes that are gradually being automated. Herein, this paper proposes robotic building maintenance system using motion control, in specific, reducing a system jerk which is directly subjected to improve the process performance and economic feasibility. The sensor for detecting straight and curvature section of the building facade, moreover rail-joint segment can be detected and be utilized for reducing jerk of the system. Analysis of the proposed system error caused by excessive vibration, e.g. jerk motion is introduced. To enhance the stability and safety of the system, herein, the strategy is proposed for enhancing the performance of the system based on anti-jerk motion control algorithm which comes out increasing the stability and sustainability of the integrated system, as well.