• Title/Summary/Keyword: Maintenance Plan

Search Result 1,045, Processing Time 0.029 seconds

Estimation of Line Utilization Rate and Track Maintenance Time of Conventional Railway (일반철도의 선로이용율과 선로 유지보수시간 추정)

  • Ki, Hyungseo;Park, Dongjoo;Kim, Dongsoo;Kim, Haengbae
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.638-644
    • /
    • 2012
  • In this study, we numerically estimated available and unavailable time of conventional railway by examining 60% which is known as average range of track utilization efficiency. We also estimated track repair time for maintenance which is the main factor of making track utilization change and analyzed appropriate estimated time. The railway's safety should be guaranteed by appropriate railway operating plan and by adequate rail facilities maintenance. At the same time, daily railway train 'Dia's recovery power should be reflected to the management plan. Considering these factors, we examined mechanical equipment and the national rail network in order to rationally estimate track repair time of the maintenance and to secure spare time in case of train delays. It was found that track utilization efficiency was more or less 60%.

A Study on Simulation Model for RAM Analysis of SWRO Plant (SWRO 플랜트의 RAM 분석을 위한 시뮬레이션 모델 연구)

  • Kim, Yong Soo;Park, Jungwon;Choi, Sukho;Kang, Jun-Gyu
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The Sea Water Reverse Osmosis (SWRO) plant should take into account the availability of the plant from the design stage for long-term and continuous fresh water production. As it occurs, it is necessary to establish a corrective maintenance plan and preventive maintenance plan to maintain availability. In the field of complex engineering structures such as seawater desalination plants, it is difficult to estimate the reliability or availability of the system in a mathematical way. This study develops RAM analysis framework and model, and proposes discrete event simulation model as a application sowtware specialized for seawater desalination plant. Considering the characteristics of the plant maintenance, in case of corrective maintenance, we propose a preventive maintenance policy that not only repairs or replaces a single-broken part, but also simultaneously maintains all accessible parts according to the level of overhaul. A case study was conducted to estimate the availability of the system based on the field data of the seawater desalination plant in Korea and Saudi Arabia. The result was close to the expected availability of the plant.

A Characteristics of Maintenance Planning of Trees in Historical Landscape Forest of Royal Tombs of the Joseon Dynasty (조선왕릉 역사경관림 수목 정비 계획의 특성)

  • So, Hyun-Su;Lee, Jong-Keun
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.88-99
    • /
    • 2018
  • After UNESCO appointed Royal Tombs of the Joseon Dynasty to be World Cultural Heritages(2009), Cultural Heritage Administration in Korea established Management Office of Royal Tombs of the Joseon Dynasty(2012) and conducted Mid to Long-Term Plan on Conservation, Management, Utilization of World Heritage 'Royal Tombs of the Joseon Dynasty(2015)'. The report, as an implementation plan, provides detailed contents of the maintenance planning of Royal Tombs of the Joseon Dynasty. From this background, with a view to comprehending the characteristics of the maintenance planning of trees in historical landscape forests, this study extracted the contents related to the historical landscape forests of the 40 Royal Tombs of the Joseon Dynasty from the "Mid to Long-term Plan" and conducted literature research. The results of the study are as follows. First, from 2016, the short-term plans have provided detailed contents on logging, transplanting and planting trees in the plans divided by stages. On the other hand, the long-term plans, instead of presenting abstract contents repeatedly for each royal tomb, should seek vegetation landscape that each royal tomb should aim for. Second, since the areas that are in charge of the various functions of the royal tombs have been subjects to the maintenance planning, it is effective to establish a maintenance planning by separating functional areas instead of the comprehensive concept as historical landscape forests. Third, the maintenance planning of trees in historical landscape forest of the Royal Tombs of Joseon Dynasty is based on daily management such as density control and maintaining the shape of trees, which is necessary to sustain the forest. Also, due to the goal of preserving the pine forest, which is recognized as a prototype vegetation landscape, foreign species and other trees have been more cut down. With a few limited types of tall tree but few shrubs and flowers, it is characterized that the orientation toward aesthetic landscapes is insufficient in large green spaces. Fourth, according to the function of the tomb, it is divided into entrance area, ceremonial area, burial area and outer forest, and the contents of the maintenance planning are analyzed by basic conditions of tree management: prototype, ecology, functionality, and aesthetics. After studying the tree management characteristics of each area, four suggestions are made: understanding the diversity of trees that form prototype landscape as a management plan, sustainability of various forests adapted to ecological environment, convenience required in addition to ceremony and safety characterizing the Royal Tombs of Joseon Dynasty, and the necessity of access to aesthetic landscape on the tombs.

A Study on Establishment of Mitigation Technique of Deterioration for Environmental-friendly Dam Construction in Rural Area - A focus of the Plant Ecosystem - (농촌지역내 친환경적인 댐 조성을 위한 훼손저감기법 적용 연구 - 식물생태계를 중심으로 -)

  • Lee, Soo-Dong;Kang, Hyun-Kyung
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.2
    • /
    • pp.31-45
    • /
    • 2010
  • Building a dam that is not considering the environmental impact and human social impact can cause the loss of entire ecospheres such as fragmentary green network, disturbance of plants ecosystem, the destruction of social and cultural indigenous resources, therefore, it can occur the environment change and distortion of ecosystem. The purpose of this study is that presenting the methods of ecosystem maintenance and ecosystem damage compensation about for environmentally direct impact i.e. the ecosystem change in the intended place for building a dam. According to the planning progress, the study was proceeded to planning site examine, assessment, conception plan. As the results of examine and assessment, it must be necessary to offered the maintenance and damage compensation if the site where include the 1st degree of biotope area, the 2nd degree of biotope and the 8th degree of green naturality area were damaged by being submerged and constructing road. In addition, according to the conception plan, we suggest the mitigation proposals such as plant communities transplant, planning of connecting green network against for influencing direct impact ecosystem that is destroying plant communities, damaging inhabitants, noise pollution, water pollution, etc.

Development of Evaluation Indicators for Maintenance and Preservation of Agriculture and Rural Heritage (델파이 기법을 이용한 농업·농촌유산 유지·보전 평가지표 개발)

  • Kim, Eun Ja;Jeong, Won Ill;Lee, Yoo Kyoung;Lim, Chang Su
    • Journal of Agricultural Extension & Community Development
    • /
    • v.21 no.4
    • /
    • pp.1191-1226
    • /
    • 2014
  • The purpose of this study is to develop the evaluation criteria for the maintenance preserve of agriculture and rural heritage. The major steps for this study are 1) drafting the evaluation criteria for maintenance preservation of agriculture and rural heritage 2) verifying the evaluation criteria, and 3) determining the weighting values of the confirmed evaluation criteria. First, to derive the evaluation criteria for maintenance preservation of agriculture and rural heritage, the researcher reviewed the literature on the evaluation of agriculture and rural heritage, including research on the indexes of agriculture and rural heritage, the degree of the maintain preservation of heritage. A total of 31 evaluation criteria were selected. Second, to verify the selected 5 evaluation items and 31 evaluation indexes, the Delphi Method was implemented. Using traditional 3-step Delphi Method consisting of close-ended forms, with a panel of 41 experts, the researchers verified 5 evaluation items 31 evaluation indexes, two for each evaluation area validity. The confirmed evaluation areas are 5 items of management plan, management support system, surroundings of heritage, local network, heritage utilization and 31 criteria were preservation maintenance, performance plan, resident community composition, monitoring, act of parliament fulfillment, ecosystem management, landscape harmony, restoration and transmission plan and enhancement of residents' capability, etc. in the order. Through maintenance preservation evaluation index of agriculture and rural heritage, it can be utilized as sustainable development of plural resources.

A Study on establishing Improvement Plan of Rail Bridges (철도교량의 개량계획 설정에 관한 연구)

  • Baek, Jae-Wook;Park, Tae-Hyo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.10-16
    • /
    • 2008
  • In order to improve stability of rail and ride comfort, railway bridges should be maintained a integrity. However, it is necessary to plan various reinforcements and improvements because of a long term used and external effects. In this paper, the improvement plan which is reflected by investigation for reinforcement and improvement is introduced. The constituents of the structures are defined in order to optimize the improvement plane, and the analysis for relationships between the constituents are performed by several evaluation. Finally, the improvement plan is applied to a structure using impact factors for the external effects in order to obtain the improvements reasonably.

  • PDF

A Study on the Building Use Control of Seoul in District Units Plan (서울시 지구단위계획의 운용에 관한 연구)

  • Shim, Jae-Heon;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.4 no.2
    • /
    • pp.26-34
    • /
    • 2004
  • Our country did not illustrate and reverse by a city planning law department construction Buddhist priest's robe dual setup the urban setting to be regulated, it came. The city planning law as the high position system of space planning mainly provides the use and a size of the land, the construction law the detail contents of site undergarment concrete location and the form back is provided and of course, regarding the structure which relates with the designation of concrete building use in him and the immediacy back. These two laws are come by a trade name complement and a function sharing role in order for the affirmative development of the city to become accomplished, being used. To necessity of District unit plan the general causal government employee all it is sympathizing, it relates it goes to extremes and with the maintenance of endurance environment and many portion with charge Sikkim also the fact that it is the criticism which relativy is negative in duty of administrative origination is fact in the people. But realization of plan hazard the execution of the public section which stands will be important, it will reach and the public section execution plan of the autonomous nine dimension for must be prepared. The next research that the individual globe plan and development actual condition actual proof and the research which it analyzes system is necessary with base, sees the general operation evaluation of Seoul District unit plan.

  • PDF

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.

Reliability-Centered Maintenance of Generating Unit Using Stochastic FMECA (확률론적 FMECA를 이용한 발전설비의 신뢰도 기반 유지보수계획 수립)

  • Joo, Jae-Myung;Kim, Dong-Min;Byeon, Yoong-Tae;Kim, Hyung-Chul;Kim, Jin-O
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.1
    • /
    • pp.58-65
    • /
    • 2008
  • Reliability-Centered Maintenance plan for maintenance schedule of generating unit is being assessed in this paper. Maintenance schedule is a key index that can be used to determine stability and cost. In this paper, stochastic FMECA is described for the life assessment by using probability distribution, and combustion-turbine generations in Korean power systems have been assessed for maintenance schedule. Such an assessment can be a useful guide for maintenance plans in restructured power industry.