• Title/Summary/Keyword: Maintenance Item

Search Result 179, Processing Time 0.029 seconds

Cost Analysis Model for Periodic Maintenance Policy with Maintenance Cost Factor (보전비용요소를 고려한 정기보전정책의 비용분석모델)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.287-295
    • /
    • 1995
  • This paper is concerned with cost analysis model in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Mimimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a new item until tile periodic maintenance time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to scale parameter of failure distribution. Maintenance cost factors are included operating, fixed, minimal repair, periodic maintenance and new item replacement cost. Numerical example is shown in which failure time of system has weibull distribution.

  • PDF

A Preventive Maintenance Model Based on the level of item degradation (마모 수준에 의거한 예방 정비 모형)

  • 구자항;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.15 no.26
    • /
    • pp.173-179
    • /
    • 1992
  • This paper is concerned with preventive maintenance model for the items whose failures are dependent on their wear level. The previous maintenance models have used time as their decision variable, but it is not appropriate for the case which have wear dependent processes for their failures. In this paper, we consider an operating item which is under periodic review and which is subject to degradation. The scheduled maintenance (overhaul ) is based on the level of item degradation rather time. A functional equation for the total expected cost over an infinite horizon period is formulated and solved.

  • PDF

A Study on the Maintenance System Module Design for the BTL Project Facilities : Focused on Educational Facilities (임대형 민자사업(BTL) 발주 시설물의 합리적 유지관리시스템 모듈 설계에 관한 연구 -교육시설물을 중심으로-)

  • Kim, Sang-Seok;Son, Jae-Ho;Lee, Seung-Hyun;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.702-707
    • /
    • 2008
  • BTL projects for educational facilities were conceived in 2005 to supply public facilities in a timely and efficient manner After the projects were completed in March 2007, proper facility maintenance has become an increasingly important issue. However, BTL projects are still in an early developmental stage, and the data on the maintenance and operation of such facilities are not yet available because the operation of the facilities has just begun. Accordingly, this study is conducted to derive maintenance processes and to specify maintenance items for the efficient maintenance of BTL educational facilities. Then, database on the maintenance processes will be created, and a maintenance system module will be designed.

  • PDF

A Study on the inspection item classified by reinforcement method for the construction slope maintenance (건설공사 비탈면 유지관리를 위한 보강공법별 점검항목에 관한 연구)

  • Kim, Yong-Soo;Chang, Buhm-Soo;Shin, Kwan-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.759-764
    • /
    • 2005
  • With the tunnel to case of the construction slope it executes the periodic maintenance due to an objectivity standard. But, the standard connected with construction slope is not integrated with the important public paper organic enemy and it is duplicated and the standards which conflict are being scattered. Also, it is referred to some specifications simply and the feature which is diffuse appears. Therefore, there is a necessity which it investigates the problem point of the maintenance civil official and it improves rationally and it takes a triangular position a confusedly be standard system. In this research which it sees accomplished the fundamental research against the inspection item classified by reinforcement method for the construction slope maintenance.

  • PDF

Cost Analysis Model with Minimal Repair of Spare Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 대체품 수리정책에서의 비용분석 모델)

  • Kim Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.2
    • /
    • pp.151-161
    • /
    • 2006
  • This article is concerned with cost analysis model in periodic maintenance policy. The repair policy is differently applied according as unit importance during an item being used and unit restoration during an item being failed. So in this paper the repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a spare unit until the periodic maintenance time arrived. Then total expected cost per unit time is calculated according to scale parameter of failure distribution in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and spare unit cost. Numerical example is shown in which failure time of item has Erlang distribution.

  • PDF

A Study on cost expenditure characteristics and importance level of each maintenance item of public office buildings by conducting cost surveys (공공업무시설의 수선비 조사를 통한 연차별 비용변화 패턴 및 수선비 항목별 발생빈도와 평균비용 분석)

  • Choi, Seok Kyoo;Kim, Gap Youl
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.111-118
    • /
    • 2008
  • To maintain the public office buildings, the related government employee uses cost under the limited budget. it is difficult to execute the budget as is assigned to maintenance items with contemplating the characteristics such as frequency, cost/item, weighting factor, and etc. As a precedent study about this cost-efficiency model, this study is intended to show the expenditure trends, frequencies, and cost distributions of maintenance items for the development of cost-efficiency model by analyzing time series data from the surveys on maintenance costs of the selected public office buildings.

Deterioration Evaluation for Industrial Pipeline by Sectionalizing (산업시설 배관의 섹션화에 의한 노후도 평가)

  • Min, Hyuk-Ki;Kim, Sang-Bum;Kim, Byung-Woo;Kim, Hyoung-Ki;Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.123-130
    • /
    • 2016
  • This study introduced deterioration evaluation item and criteria that could be applied to industrial facilities with the most widely used carbon steel pipe installed for ordinary piping (KSD 3507). Experimental industrial pipes were evaluated with pipe sectionalizing method combined with the established evaluation item and criteria to measure and manage semi-continuously for overall piping system. After applying outcomes from this study to a plant of incineration facility, a 42% saving in repairing and remodeling cost was achieved.

A Cost Analysis Model of Minimal-Repairable Items in Free Replacement under the Periodic Maintenance Policy (정기보전제도에서 응급수리제품에 대한 무상수리 적용의 비용분석 모델)

  • 김재중;김원중;조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.39
    • /
    • pp.89-98
    • /
    • 1996
  • This paper is concerned with cost analysis model in free -replacement policy under the periodic maintenance policy The free-replacement policy with minimal repairable item is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost per unit time is calculated according to maintenance period Tin a viewpoint of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has beta distribution.

  • PDF

A Research for Weight Decision of Waterproofing Methods Selection Evaluation Item using the AHP (AHP기법을 이용한 방수공법 선정 평가항목의 가중치 결정에 관한 연구)

  • Choi, Sung-Min;Lim, Jong-Kwon;Oh, Sang-Keun;Seo, Chee-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.205-211
    • /
    • 2008
  • Recently, selects method of waterproofing where is suitable with method and material physical properties, construction technique, Productive technique and specifications and maintenance techniques evaluation for the same evaluation method is coming to be presented. Respects the application which select system is substantial objectively reflects a weight to evaluation item the research for is necessary. This research the evaluation which in order is effective and the decision-making to be possible about technically countermeasures for a quality security from waterproofing materials, method selection processes, clearly responsible dividing of construction and maintenance techniques. A sets weight of evaluation item for right select system, it stratify the causes which affect in priority based on AHP.

  • PDF

Analysis on Correlation between Infiltration/Inflow and Defective Rate in Sewer (하수관거 침투수/유입수(I/I)와 불량률과의 상관성 분석)

  • Choi, Seung-cheol;Kwon, Young-sung;Rim, Jay-myoung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.2
    • /
    • pp.221-227
    • /
    • 2005
  • This study has suggested the base data for decision of maintenance ranking and estimation of maintenance effect in the maintenance project of sewers as based on investigation of the defective rate in the sewer through Infiltration/Inflow(I/I) and CCTV analysis. It also analyzed the correlation between I/I and defective rate of sewer. As the result of this study, (1) Defective items of sewer was found out one item each 12.97m with an average. (2) By regression analysis, I/I has high correlation with defective rate of sewer like that $R^2$ is 0.7806. (3) The first thing in the item with bad influence on the I/I was joint badness and secondary was cross connection.