• Title/Summary/Keyword: Maintenance Guidelines

Search Result 363, Processing Time 0.025 seconds

Perception Survey on the Necessity of Improvement for the Standard Buoys Fouling Maintenance

  • Yoo, Yun-Ja;Kim, Tae-Goun;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.43 no.2
    • /
    • pp.93-100
    • /
    • 2019
  • In 2001, about 20 years after the introduction of the standard buoys, the natural environment and maritime traffic flow changes in the waters near Korea and the necessity of improvement of the AtoN (Aids to Navigation) maintenance was suggested. The IALA provides guidelines for maintenance and management of AtoN, and Korea provides guidelines for the management and operation of standard buoys by means of the Enforcement on the AtoN laws. The objective of this study was to investigate the installation status and the repair status of the standard type buoys by sea area in order to improve the management and operation of the steel standard buoys. In addition, a survey was conducted on the improvement of the steel buoy fouling and the improvement of the lifting inspection cycle towards on the AtoN managers and producers of the representative authority by sea area. In the case of LL-26 (M) buoy type, the standard type buoy installation status of Korea in 2017 was 57.1%, and the LL-26 (M) type was 58.9% showing the highest repair rate. According to the results of the survey on buoys fouling, 51.2% were caused by the attachment of shellfish, and 43.2% were caused by bird feces. The results of the survey on the improvement of the regular buoy inspection cycle showed that the measures are to maintain the current inspection period of 2 years regardless of the characteristics of the sea area (water depth, inside and outside port, buoy size, etc.).

Development of a Knowledge-based Information Management System for Plant Maintenance (설비 관리를 위한 지식기반 정보관리 시스템의 개발)

  • Yim, Hyung-Sang;Park, Young-Jae;Lee, Sang-Min;Choi, Jae-Boong;Kim, Young-Jin;Roh, Eun-Chul;Lee, Byung-Ine
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.149-156
    • /
    • 2003
  • Recently, the importance of plant maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as riskbased inspection(RBI), fitness for service guidelines(FFS), plant lifecycle management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

  • PDF

Development of a Knowledge-Based Information Management System for Plant Maintenance (설비 관리를 위한 지식기반 정보관리 시스템의 개발)

  • Park, Young-Jae;Lee, Sang-Min;Yim, Hyung-Sang;Choi, Jae-Boong;Kim, Young-Jin;Roh, Eun-Chul;Lee, Byung-Ine
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.11
    • /
    • pp.1933-1940
    • /
    • 2003
  • Recently, the importance of plant maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as risk-based inspection(RBI), fitness for service guidelines(FFS), plant lifecycle management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

Planning and Design Guidelines for the New Lifestyles in One-person Officetels (신수요 계층의 생활에 대응할 수 있는 주거형 오피스텔의 계획 방안 연구)

  • 이지순;이현애;박지현;윤정숙
    • Journal of the Korean housing association
    • /
    • v.13 no.4
    • /
    • pp.53-60
    • /
    • 2002
  • The purpose of this study is to provide the guidelines for the planning and design of officetels, meeting the requirements of life in one-person household which is a new type in housing market. Literature survey is used as a research method. We analyzed the needs of officetel residents, by reviewing researches and by examining internet homepages and catalogs of 20 officetels sold since 2000. Case study analysis method is used as a qualitative analysis. The major findings of this study are as follows; 1) In dwelling unit space, it lacks the independence of working space and the privacy of living space. Therefore, the provision of various unit plans, such as 2-bay plan, unit with mezzanine floor or movable walls, layout of kitchen and dining area in window side, is proposed. 2) In communal space, it lacks the consideration of natural environments and the systematic maintenance. Therefore, the introduction of communal workshop and conference rooms and of various types of garden space, is proposed.

Development Considerations for Reverse Engineering Guidelines for AEC (AEC 역설계 지침 개발을 위한 고려사항 도출)

  • Kang, Tae Wook
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.23-29
    • /
    • 2015
  • The purpose of this study is to provide considerations for developing reverse engineering guidelines for AEC(Architecture, Engineering and Construction). The reverse engineering is a methodology which has the purpose of extracting and recognizing geometries and properties from physical objects such as buildings, facilities, terrain and infrastructure including roads, bridges, and tunnels. To handle them for the purpose of construction management, maintenance, and operation, we should know the exact position, orientation, and dimension of the objects including their properties. As the viewpoint of the information extraction from reverse engineering, it is necessary to derive consideration factors for developing reverse engineering guidelines.

Korean Industrial Standards - Quality management and quality assurance standards - Part 3 : Guidelines for the application of KS A : 9001 : 1998 to the development, supply installation and maintenance (한국산업규격 - 품질경영 및 품질보증 규격 - 제3부 : 컴퓨터 소프트웨어의 개발, 공급, 설치 및 유지보수에 대한 KS A 9001 : 1998의 적용을 위한 지침)

  • 한국골판지포장공업협동조합
    • Corrugated packaging logistics
    • /
    • v.7 no.32
    • /
    • pp.149-156
    • /
    • 2000
  • PDF

Modal parameters identification of heavy-haul railway RC bridges - experience acquired

  • Sampaio, Regina;Chan, Tommy H.T.
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.1
    • /
    • pp.1-18
    • /
    • 2015
  • Traditionally, it is not easy to carry out tests to identify modal parameters from existing railway bridges because of the testing conditions and complicated nature of civil structures. A six year (2007-2012) research program was conducted to monitor a group of 25 railway bridges. One of the tasks was to devise guidelines for identifying their modal parameters. This paper presents the experience acquired from such identification. The modal analysis of four representative bridges of this group is reported, which include B5, B15, B20 and B58A, crossing the Caraj$\acute{a}$s railway in northern Brazil using three different excitations sources: drop weight, free vibration after train passage, and ambient conditions. To extract the dynamic parameters from the recorded data, Stochastic Subspace Identification and Frequency Domain Decomposition methods were used. Finite-element models were constructed to facilitate the dynamic measurements. The results show good agreement between the measured and computed natural frequencies and mode shapes. The findings provide some guidelines on methods of excitation, record length of time, methods of modal analysis including the use of projected channel and harmonic detection, helping researchers and maintenance teams obtain good dynamic characteristics from measurement data.

Development of a Maintenance Support System for C++ Programs (C++프로그램의 유지보수 지원 시스템 개발)

  • Moon, Yang-Sun;Jang, Gun-Sil;Yoo, Cheol-Jung;Chang, Ok-Bae
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.7
    • /
    • pp.1759-1773
    • /
    • 1998
  • This paper introduces a maintenance support tool for C++ programs. The tool was extended by adding a documentation supporting tool(DT) and an OOD/OOP style guidelines supporting tool(OOD\ulcornerP-GT) to previous work results, the complexity measurement tool(CT) and the visualization tool(VT). The tool was named C++ MT. For the extention, we studied a documentation method of object oriented programs, analyzed and grouped the OOD/OOP style guidelines suggested in some works. The DT developed in this paper helps programmer understand, cange, and est programs, and also extract the reuse components. OOD/P-GT provides guielines for programmer to improve program quality.

  • PDF

The Establishment Plan of Strong-Motion Instrumentation of Dams for Monitoring of Seismic Behavior and Taking An Urgent Countermeasure (댐의 지진관측 및 내진대책 수립을 위한 지진계측시스템 구축 방안에 관한 연구)

  • Oh, Byung-Hyun;Lee, Jong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1588-1595
    • /
    • 2005
  • In this study, the installation location of accelerometer and accelerograph for dam are investigated in the field to establish of emergency action against dam failure when earthquake occur and to guarantee the results of seismic stability of dams which are analysed with dynamic analysis method during 1999 to 2003 by KOWACO. By a comparative study concerning of domestic and foreign guidelines of seismic strong motion instrumentation for dams, "Guidelines of Seismic Strong-Motion Instrumentation Installation, Operation and Maintenance for Dams" is established to set up the standard of seismic strong-motion instrumentation for dam, are supervised by KOWACO There is some problems in taking a measure of stability of dams when earthquake event occur because the existing seismic strong motion instruments are operated independently. This make difficult to confirm the occurrence of seismic event. For that reason, in this study the plan of unified operation and maintenance system for strong-motion instrument for dams is designed. It will make possible real-time seismic monitoring, data transmission and receiving, giving warning for earthquake, and exchanging data with national seismic network.

  • PDF

Seismic Isolation Effects According to Set up the Isolation Period in the Medium and Low-rise Framed Building (중.저층골조에서 면진주기 설정에 따른 면진효과)

  • Chun, Young-Soo;Hur, Moo-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.93-99
    • /
    • 2010
  • Seismic isolation offers an attractive approach for reducing seismic loads in the building and its components. This paper deals with the seismic isolation effects due to variation in period ratio between superstructure and isolation layer of the building. Seismic isolation effects of the moment-resisting frames with the various period ratio were studied by nonlinear time history analysis, and the guidelines on the stiffness ratio of the superstructure and isolation layer of the building for the effective seismic isolation follow from the results of this study. It is recommended that the isolation period should be greater than 2.5 times of that of the superstructure for the effective seismic isolation.