• Title/Summary/Keyword: Maintenance Cost Estimation Method

Search Result 76, Processing Time 0.023 seconds

Optimal Sampling Method of Censored Data for Optimizing Preventive Maintenance (예방정비 최적화를 위한 중도절단 자료의 최적 샘플링 방안)

  • Lee, In-Hyun;Oh, Sea-Hwa;Li, Chang-Long;Yang, Dong-In;Lee, Key-Seo
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.3
    • /
    • pp.196-201
    • /
    • 2013
  • As there is no failure data for the entire lifecycle of a product, when analyzing reliability measures based on early failure data only, there may be a significant error between the estimated mean life and the real one, because it can be underestimated, or on the other hand, it can be overestimated when analyzing reliability measures based on a large amount of censored data with the failure data. To resolve the issue, this study proposes an optimal sampling estimation procedure that selects the proportion of censored data to estimate the optimal distribution with the idea that the estimated distribution could be approximated as closely as the real life distribution. This would work if we sampled the optimal proportion on the censored data, because failure data has real intrinsic distribution in any situation. We validate the proposed procedure using an actual example. If the proposed method is applied to the maintenance policy of TWC (Train to Wayside Communication) system, then we can establish the optimal maintenance policy. Thus, we expect that it will be effective for improvement of reliability and cost savings.

Prestressing Loss Management for PSC Girder Tendon Based on EM Sensing (EM센서를 활용한 PSC 텐던 긴장력 손실 관리)

  • Kim, Junkyeong;Park, Jooyoung;Zhang, Aoqi;Lee, Hwanwoo;Park, Seunghee
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.4
    • /
    • pp.369-374
    • /
    • 2015
  • In this paper, an EM sensing based prestressing force estimation method is proposed, in which it can estimate tensile force of PS tendon for PSC girder. The PSC girder has more improved performance than the general concrete girder by introducing the prestressing to the concrete. Thus the PSC girder bridge is widely constructed due to its high performance and low cost. However, the prestressing force has not been managed nevertheless it is major factor for the maintenance of the PSC girder bridge. The prestressing force was just measured during construction using jacking device and after that, it can not be managed. For this reason, this paper proposes a tensile force estimation method of PS tendon based on EM sensor. The permeability of ferroelectric material is changed according to the induced stress to the material, in which it can be measured using EM sensor. To measure the permeability of PS tendon, the EM sensor was fabricated and verified by performing the MTS test. The test was performed using 7-wire steel tendon under the 0, 40, 80, 120, 160, 200 KN of tensile force. The permeability of PS tendon was gradually decreased according to the increasement of tensile force. The regression method was used to find the relation between permeability and stress. As a result, the permeability has linear relation with the tensile force of PS tendon and the pre-stressing force can be estimated by the derived estimation equation.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

Estimation of Bridge Vehicle Loading using CCTV images and Deep Learning (CCTV 영상과 딥러닝을 이용한 교량통행 차량하중 추정)

  • Suk-Kyoung Bae;Wooyoung Jeong;Soohyun Choi;Byunghyun Kim;Soojin Cho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.3
    • /
    • pp.10-18
    • /
    • 2024
  • Vehicle loading is one of the main causes of bridge deterioration. Although WiM (Weigh in Motion) can be used to measure vehicle loading on a bridge, it has disadvantage of high installation and maintenance cost due to its contactness. In this study, a non-contact method is proposed to estimate the vehicle loading history of bridges using deep learning and CCTV images. The proposed method recognizes the vehicle type using an object detection deep learning model and estimates the vehicle loading based on the load-based vehicle type classification table developed using the weights of empty vehicles of major domestic vehicle models. Faster R-CNN, an object detection deep learning model, was trained using vehicle images classified by the classification table. The performance of the model is verified using images of CCTVs on actual bridges. Finally, the vehicle loading history of an actual bridge was obtained for a specific time by continuously estimating the vehicle loadings on the bridge using the proposed method.

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

A Study on Efficiency Estimation of Aquaculture : the Case of the Korean Seaweed Farms (해조류 양식업 규모의 효율성 추정에 관한 연구 - 부산 기장지역 미역양식을 중심으로 -)

  • Seo, Ju-Nam;Song, Jung-Hun
    • The Journal of Fisheries Business Administration
    • /
    • v.40 no.1
    • /
    • pp.1-26
    • /
    • 2009
  • The aquaculture management considers the maintenance of households lifehood more than profit maximization. As aquaculture industry has developed enterprise farms appeared, and the small and the large scale farms coexist. The features of coexistence could be summarized as followings. First of all, the large scale farms show the higher net profit while the small scale farms show the higher profit per 1ha and the earning rate. Secondly, in the case of over 2ha, the earning rate is stable in spite of the scale expansion. Moreover, in processing method, dried seaweed occupy the biggest proportion in the small scale farms while the raw seaweed occupy the biggest proportion in the large scale farms. Lastly, the scale of farms becomes larger, the participation rate of household labor rises. This thesis analyses the efficiency of Korean seaweed farms in the way of DEA model and suggests the improvements for the efficiency management. The mean technical, pure technical and scale efficiencies were measured to be 0.88, 0.96 and 0.91, respectively. Among the 20 farms included in the analysis, 10 were technically efficient and 12 were scale efficient. In conclusion, it is shown that the aquaculture farms has been becoming the form of coexistence. This appearance results in the effort for reducing the cost in the small scale farms and in profit maximization in the large scale farms. On the other hand, middle scale farms is inefficient compared with the small or large scale farms. Therefore, in order to achieve the efficiency, it is necessary to accomplish economy of scale by extending farm size or to cut expenses by reducing farm area. In other word, the efforts for achieving the efficiency is required in a different direction in spite of the same scale.

  • PDF

Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.

A Study on Dam Exterior Inspection and Cost Standards using Drones (드론을 활용한 댐 외관조사 및 대가기준에 대한 연구)

  • Kim, Tae-Hoon;Lee, Jai-Ho;Kim, Do-Seon;Lee, Suk-Bae
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.3
    • /
    • pp.608-616
    • /
    • 2021
  • Purpose: Safety inspections by existing personnel have been limited in evaluation and data securing due to concerns about the safety of technicians or difficulty in accessing them, and are becoming a bigger problem as the number of maintenance targets increases due to the aging of facilities. As drone technology develops, it is possible to ensure the safety of personnel, secure visual data, and diagnose quickly, and use it is increasing as safety inspection of facilities by drones was introduced recently. In order to further enhance utilization, it is considered necessary to base a consideration standard for facility appearance investigation by drones, and in this paper, research was conducted on dams. Method: To calculate the quality, existing domestic safety inspection and drone-related consideration standards were investigated, and procedures related to safety inspection using drones were compared and analyzed to review work procedures and construction types. In addition, empirical data were collected through drone photography and elevation image production for the actual dam. Result: Work types for safety inspection of facilities using drones were derived, and empirical survey results were collected for two dams according to work types. The existing guidelines were applied for the adjustment ratios for each structural type and standard of the facility, and if a meteorological reference point survey was necessary, the unmanned aerial vehicle survey of the construction work standard was applied. Conclusion: The finer the GSD in appearance investigation using drones, the greater the number of photographs taken, and the concept of adjustment cost was applied as a correction to calculate the consideration standard. In addition, it was found that the problem of maximum GSD indicating limitations should be considered in order to maintain the safe distance.

Calculation of the Coefficient of Artificial Reef According to the Coefficient of Volume (체적계수에 따른 인공어초 계수산정)

  • Kim, Young Jong;Choi, Hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.9
    • /
    • pp.2307-2312
    • /
    • 2014
  • Artificial reef refers to various structures that facility to construction field format and spawning of marine organisms, sea ranch, forest of the sea, and sea jungle artificially in water, Build a production stable base of marine products, thereby contributing to an increase in the income of fishermen. In the management of an artificial reef, the calculation of the number of square reefs may be that it is a method to perform the submersible is an important part of maintenance is correct. However, cost and diving personnel, depending on the diving situation, there is a difficult thing to implement to coast across the country. Therefore, In this study, We calculated the volume using the multi-beam Echo Sounder and side scan sonar for the reefs of the rectangle are the existing installation. And proposes the improvement of the estimation in accordance with the volume coefficient reef.

Estimation of Motor Deterioration using Pulse Signal and Insulation Resistance Measurement Algorithm (펄스 신호 및 절연저항 측정 알고리즘을 이용한 전동기 열화 추정)

  • Jeong, Sungin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.5
    • /
    • pp.111-116
    • /
    • 2022
  • The causes of motor burnout include overload, phase loss, restraint, interlayer short circuit, winding ground fault, instantaneous overvoltage, and the rotor contacting the stator, leading to insulation breakdown, leading to breakdown or electrical accidents. Therefore, equipment failure causes not only loss due to cost required for equipment maintenance/repair, but also huge economic loss due to productivity decrease due to process stop because the process itself including the motor is stopped. The current level of technology for diagnosing motor failures uses vibration, heat, and power analysis methods, but there is a limit to analyzing the problems only after a considerable amount of time has passed according to the failure. Therefore, in this paper, a device and algorithm for measuring insulation resistance using DC AMP signal was applied to an industrial motor to solve this problem. And by following the insulation resistance state value, we propose a diagnosis of deterioration and failure of the motor that cannot be solved by the existing method.