• Title/Summary/Keyword: Maintenance & Management

Search Result 3,864, Processing Time 0.037 seconds

A Production and Preventive Maintenance Policy with Two Types of Failures (두 가지 고장형태를 고려한 생산 및 예방보전 정책)

  • 김호균;조형수
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.3
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

(A Study on Optimization for Connected-(r,s)-out-of-(m,n):F System ) ((m,n)중 연속(r,s):F시스템의 최적화 연구)

  • Lee, Sang-Heon;Gang, Yeong-Tae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.618-629
    • /
    • 2006
  • This Paper is about optimizing preventive maintenance period of connected (r,s) out of(m,n) : F lattice system that one of multi-component system, (m,n) matrix failure of whole system is occurrence when parts that belong in (r,s) matrix part procession of parts arranged with procession are breakdown all. The preventive maintenance about system is very important viewing from system reliability and operational expense viewpoint. Preventive maintenance that misses a time calls big loss by system failure and expense of frequent full equipment is paid excessively in preventive maintenance itself but expense is paid much in preventive maintenance itself and whole expense escalation can be achieved preferably. Through this research, reliability model is constructed that do expense by smallest under full equipment policy chosen through comparison of each full equipment policy and preventive maintenance expense full equipment cycle and r ,s value are made using simulated annealing algorithm and simulated annealing algorithm that converge fast in multi-component system certified most suitable to optimization decision

  • PDF

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

A Study on the Forecasting of Using BIM Long-Term Maintenance Cost Model for Apartment (BIM을 이용한 공동주택 장기수선비용 예측모델 제시)

  • Song, A-Reum;Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.215-217
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. It can't use the possibility that BIM originally has, and also causes some confusion in communication. This study analyzes and classifies required information in terms of BIM in the range of estimating repair costs of apartment buildings, as an example of a way to use BIM information at the maintenance step.

  • PDF

A Study on Professional Qualification System for Electric Vehicles (전기자동차 관련 전문자격제도의 개선방향과 과제)

  • Jeon, Ju Su;Jeon, Jinwon
    • Journal of Auto-vehicle Safety Association
    • /
    • v.13 no.3
    • /
    • pp.26-31
    • /
    • 2021
  • Although the number of domestic electric vehicle registrations exceeded 100,000 in the first half of 2020, legal and institutional concerns for maintenance and management are insufficient. In particular, the existing automobile maintenance business and qualification holders are not prohibited from performing electric vehicle maintenance without additional qualifications or training under the current laws. In this study, we review the current status of Korean laws and regulations, examine discussions abroad such as the UK, the US, and Germany, and then discuss desirable laws and institutional reform. This study proposes to temporarily reorganize the system in a way that separates the electric vehicle maintenance business and the electric vehicle maintenance qualifications from conventional vehicle.

A Comparative Study of risk based LOS(Level of service) of the Regional Water Supply (자산관리 상수도분야 리스크 기반 서비스수준)

  • Cho, Inuh;Lee, Youngjai
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.3
    • /
    • pp.305-317
    • /
    • 2015
  • The function failure of present major facilities is likely to lead to failure of related systems and/or whole facilities, increasing the necessity for protection of infrastructures, main structures, and major industrial facilities. In addition, safe and efficient management for urban infrastructure (waterworks and sewerage facilities, electricity, telecommunications, roads, etc) installed in the basement or on large cities grounds at various public areas is required. Recently in response to this demand, efforts for vitalizing asset management are being made such as enacting related laws and developing asset management system in the U.S., Australia, Europe and other advanced countries with the concept for a new maintenance. In our county, identifying maintenance system problems such as aging and rapid increasing of existing infrastructures and decision-making about updating maintenance is required for systematic and organizational maintenance. In this study, by comparing and observing the LOS(Level of Service) of each countries' waterworks and risk-based LOS, we suggest the direction of future urban water infrastructure management systems for more effective management.

A Study on Outworn Aircraft Management Scheme Using Market Basket Analysis (장바구니 분석을 이용한 노후 항공기 관리방안 연구)

  • Jung, Chi-Young;Lee, Jae-Young
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.1
    • /
    • pp.77-83
    • /
    • 2010
  • In this paper, we proposed new outworn aircraft management procedure. ROKAF has both good management skill and information system, AMMIS, regarding aircraft maintenance based on all kinds of aircraft's defects. To optimize and secure aircraft's operation, management of the outworn aircraft is very important for ROKAF. With respect to these outworn aircraft's defects and maintenance, we analyzed defects occurrence pattern of outworn aircraft by using AMMIS data and Market Basket Analysis, and found the specified association rules for each defect. By using these association rules, we developed new management procedure for outworn aircraft based on the results of affinity analysis. The management procedure in this paper will also be used to optimal operation and maintenance of other aircraft and weapon systems.

A Predictive Preventive Maintenance Data Base System Design for Safety (안전성 확보를 위한 예측.예방설비보전 데이터베이스 시스템 설계)

  • Yang, Sung-Hwan;Park, Peom
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.123-128
    • /
    • 1997
  • A data base design framework for predictive a preventive-maintenance system is presented in this paper in order to effectively control machines and reduce accident rates in the workplace. The data base is designed to meet general management requirements to evaluate different maintenance strategies. There are seven data files: the equipment list maintenace pesonnel, maintenance history, maintenance specification, spare part, maintenance equipment, and maintenance schedules. Each data base file has several record based upon data acquisition.

  • PDF

A Study on the Survey of the Experts' Consciousness as to the Level in Maintenance Management of Educational Facilities (교육시설 유지관리 수준에 관한 전문가 의식조사 연구)

  • Lee, Mi-Hye;Jung, Young-Han;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.392-397
    • /
    • 2008
  • In case of the BTL project for current educational faculties, the proper standards to analyze those said educational standards lack, so it is very difficult to conduct an exact analysis and those improper standards are problematic when proper management and maintenance costs are calculated. In case of such educational facilities, as students have to use them safely for a long time and the quantity of their activities and the status of their physical growth based on individual classes, as well as the features for use by facility and the regional characteristics are different, other standards for maintenance and management must be considered unlike an apartment house. Thus, in this study, to set up the standards considering the features of educational facilities, the maintenance and management level suitable for educational facilities is presented by comparing and analysing that required to maintain and manage an apartment house, targeting the experts specializing management of educational facilities.

  • PDF

A Study on Garden Facility Management of Seoul Garden Show 2015 and 2016

  • Hong, Kwang-pyo;LEE, Hyuk-jae
    • International Journal of Advanced Culture Technology
    • /
    • v.7 no.2
    • /
    • pp.125-136
    • /
    • 2019
  • This study focuses(selected) on garden facilities of designer gardens created at the 1st and 2nd Seoul Garden Shows and examined installed facilities at each designer garden by categorization according to type, material and functions. The study observed problems occurring from maintenance of garden facilities as time passes by and collected basic data to develop maintenance guideline aiming to make contribution to further spreading and promotion of high quality garden culture. This study examined all gardens created at 1st and 2nd Seoul Garden shows in 2015 and 2016. There were 18 gardens built in 2015 and 16 in 2015.The study looked at responsible entities for maintenance of facilities and examined maintenance system for managing these gardens. Garden facilities of the study were categorized into paving, facility for rest, playground, water facility, environmental sculpture and planting media facility according to categorization by landscape design standards and construction guidelines. Target gardens of this study are maintained mostly by citizen gardeners who are passionately carrying out maintenance work while communicating with designers. However, these citizen gardeners lack technical knowledge to manage various facilities. Also, maintenance manuals submitted by garden designers do not offer sufficient details on facility maintenance which calls for professional maintenance and clear instructions on facilities from early phase of design.