굴착 공정에 따른 주변지반의 거동 특성을 파악하기 위하여 굴착 깊이가 15m$\∼$29m인 3개 굴착현장에서 장기간에 걸쳐 계측을 실시하고 그 결과를 분석하였다. 이 논문에서는 본 굴착뿐만 아니라 토류벽 설치 및 지보 해체 작업이 굴착 주변지반의 거동에 미치는 영향을 정량적으로 평가하기 위하여 전체 굴착 공정을 굴토 전 준비 공정, 본 굴착 공정, 지보 해체의 세 공정으로 구분하여 계측을 수행하였다. 3개 굴착현장에서 이루어진 계측결과에 의하면, 지보 해체로 인하여 추가적으로 발생한 벽체 수평변위는 본 굴착단계에서 발생한 변위의 약 40$\%$ 내외였으며, 지표침하의 경우에는 본 굴착 시 발생한 침하체적의 $18\%\∼33\%$가 발생하였다. 이와 같은 현장계측 결과를 통하여, 굴착 전 및 지보 해체 공정 중에도 무시할 수 없을 정도의 지반 변위가 발생할 수 있음을 정량적으로 확인하였다.
한국지반공학회 1990년도 PROCEEDINGS OF THE FIRST KOREA-JAPAN JOINT GEOTECHNICAL SEMINAR ON EXCAVATION and TUNNELING IN URBAN AREAS
/
pp.163-175
/
1990
A main factor in the design of excavation in an urban area is the movements. The finite element method provides rational predictions of excavation behaviour, yet practical engineers may find difficulties in applying it to the actual field case. In this study, factors affecting the excavation behaviour are considered in details and the applicability of the finite element method to the actual field excavation cases is presented. Numerical examples are analyzed to provide results of parametric study on the affecting factors.
MiStrut is a new method to establish structural stability in designing braced excavations by making a rigid connection between top-level steel beams and soldier beams. MiStrut has a function of working as a strut as well as supporting cover plates of top-level steel beams. The structural mechanism of MiStrut is supposed to reduce flexural deformation of soldier beams, which may lead to reduced lateral earth pressures behind excavation. In this research, for verification of the performance of MiStrut, shear-wave velocities of subsurface soil before and after excavation was compared. The rigid connection of main girder beams with soldir beams reduced shear-wave velocity by 67% and lateral earth pressures by 90%, which indicates that MiStrut is effective development in reducing lateral earth pressures on braced excavation.
Hydraulic excavators have been one of the most popular devices in the various industries for construction, forestry and agriculture etc. Because the excavators generally work in poor environment, the various organizations study to automate those. In this paper, a hydraulic simulation for evaluation of automatical excavation system is presented. It is using the AMESim based on the 1.5 ton excavator with fixed displacement pumps, and operated by signals those control pilot pressure to spools of the main control valve. The main control valve is regarded that only consists of boom, arm and bucket. This simulation program is expected to apply to evaluation of the controller for automatic excavation system and to estimate of effect in accordance with change of some components or parameter.
Seo Young Song;Bitnarae Kim;Ahyun Cho;Juyeon Jeong;Dongkweon Lee;Myung Jin Nam
Geomechanics and Engineering
/
제35권2호
/
pp.109-119
/
2023
Ground subsidence in urban areas due to excessive development and degraded underground facilities is a serious problem. Geophysical surveys have been conducted to estimate the distribution and scale of cavities and subsidence. In this study, electrical resistivity tomography (ERT) was performed near an area of road subsidence in an urban area. The subsidence arose due to groundwater leakage that carried soil into a neighboring excavation site. The ERT survey line was located between the main subsidence area and an excavation site. Because ERT data are affected by rapid topographic changes and surrounding structures, the influence of the excavation site on the data was analyzed through field-scale numerical modeling. The effect of an excavation should be considered when interpreting ERT data because it can lead to wrong anomalous results. A method for performing 2D inversion after correcting resistivity data for the effect of the excavation site was proposed. This method was initially tested using a field-scale numerical model that included the excavation site and subsurface anomaly, which was a loosened zone, and was then applied to field data. In addition, ERT data were interpreted using an existing in-house 3D algorithm, which considered the effect of excavation sites. The inversion results demonstrated that conductive anomalies in the loosened zone were greater compared to the inversion that did not consider the effects of excavation.
풍화토 및 모래질 충적토가 암반위에 쌓인 형태로 구성된 국내 수도권 도심 지역에서, 깊은 굴착 공사로 인하여 발생하는 인접 지표의 침하에 대해 현장 측정을 중심으로 연구를 수행하였다. 먼저, 토류벽 설치, 중간 말뚝 설치 등 본격적인 굴토 공사가 진행되기 이전의 공정으로 인한 인접 지표침하량, 침하 영향거리 등을 측정, 분석하였으며 다음으로, 본격적인 굴토로 인하여 발생하는 인접 지표의 침하에 대해 침하량, 침하 영향거리 등을 측정, 분석하고 균질한 사질토 지반이나 단단한 점토 지반에 대해 기존에 제시된 연구 결과와 비교하였다. 또한 굴착 공사시 과도한 변형으로 인하여 인접 지표 및 구조물에 균열 등의 피해가 발생한 7개 현장 사례를 통하여 굴착 공사로 인한 인접 지표의 균열 발생 범위에 대하여 분석하였다.
근래 들어 도심지 지하공간 개발에 대한 수요가 증가함에 따라 도심지 터널계획이 활발히 진행되고 있다. 도심지 구간에는 주민 생활환경을 고려하여 지하정거장이 계획되며, 기존 구조물의 안정성 및 환경훼손 저감 등을 위해 2-Arch터널 정거장을 적용하고 있다. 그러나 도심지 구간은 심한 풍화작용에 따라 불량지반의 심도가 깊게 발달되어 터널 안정성 확보를 고려한 신중한 계획이 요구된다. 이뿐만 아니라 도심지의 복합적인 지반상태를 고려하여 본선터널에 TBM 기계굴착 공법을 적용하는 경우, 기존 NATM형 2-Arch터널과는 시공연계성을 확보할 수 없게 된다. 본 연구에서는 쉴드TBM과 2-Arch터널을 조합한 형태인 TBM선굴진 2-Arch터널을 국내 최초로 적용한 설계사례를 중점으로 기술하고자 하였다. 중앙터널 굴착후 좌우터널 시공을 고려하여 쉴드TBM 세그먼트 설치 및 해체를 위해 고려한 설계사항을 설명하고, 수치해석을 활용한 안정성 검토를 통해 TBM선굴진 2-Arch터널의 설치효과를 검증하였다.
Yunjuan Chen;Mengyue Liu;Fuqiang Yin;Lewen Zhang;Jing Wu;Jinrui Li
Geomechanics and Engineering
/
제38권1호
/
pp.1-13
/
2024
The construction adit plays a pivotal role in enhancing the working face during the excavation of long-distance and deep hydraulic tunnels. However, the intersection zone between the main tunnel and the construction adit exhibits more intricate deformation patterns in surrounding rock, posing a significant threat to stability during excavation. Taking the Xianglushan tunnel in Yunnan Province, China, as a case study, the FLAC3D software is employed to simulate the excavation process at the intersection. The simulation results are verified combined with the field deformation monitoring results, and the spatial distribution of tunnel rock deformation in the intersection area are analyzed. Five excavation conditions with different intersection angles are simulated, and the surrounding rock deformation of the tunnel intersection area with different intersection angles is analyzed, and its influence range is discussed. The results show that: (1) The surrounding rock deformation in the intersection area increases rapidly during the tunnel excavation. With the increase of construction distance, the deformation of intersection area is gradually stable. (2) The deformation distribution of the tunnel rock is uneven, and the deformation of main tunnel near the intersection area is larger than that far away from the intersection area. (3) With the increase of the intersection angle, the surrounding rock deformation of the tunnel intersection and its influence range decreases gradually. The research results have certain guiding significance for the construction safety of the tunnel intersection area.
The purpose of this study is to analyze the plan type of excavation remains during the Mid to Late Joseon period around Jong-ro area in Seoul. 523 building remains were selected in accordance with plan type could identified through the excavation investigation report. Among these, 276 building remains were verified to the $15-16^{th}$, 145 and 102 building were verified to the 17-18th and the $19^{th}$ century. By classifying excavation remains, four dominant plan type of the each century came out. First, -shape was the most common plan type took nearly 50 percent. In a considerable proportion of cases, this plan type seems an annex of main building. However, -shape plan type also seemed to be used for main building in some cases. ㄱ and ㄷshape plan type took the second and the third. In most cases, these types seemed typical plan used for a main housing building. For the last, ㅁshape plan type identified the most unusual. This plan type merely took under five percent but, these cases are meaningful because it shows the plan alteration from ㄷshape to ㅁshape plan type. Existence proportion between each plan types of the $15-16^{th}$ century were continued to the $18-19^{th}$century without small changes between -and ㄱ types in $17-18^h$ century. By examining selected excavation remains, installing front Toi space on ㄱ, ㄷ and ㅁshape plan type stand out clearly compared with -shape plan type. From this tendency, it could be considered that plan type became a significant factor influenced installing Toi space. Similar to periodical tendency of plan type was not changed dramatically, the rate of installing Toi space in the $15-16^{th}$ century was not changed much until the $18-19^{th}$ century. It also shows the close relation between plan type and installing Toi space. In some excavation remains, floor type in the $15-16^{th}$ century also verified. There are some points of similarities on installing typical location of On-dol, Ma-ru and Bu-eok in these excavation remains with later period housing type such as Ut-Bang-Gguk-Oem-Jib and Ddeul-Jib.
한국지반공학회 1991년도 추계학술발표회 논문집 지반공학에서의 컴퓨터 활용 COMPUTER UTILIZATION IN GEOTECHNICAL ENGINEERING
/
pp.123-132
/
1991
The GEOKST program was used to solve the tunnel example problem. The package can solve such geotechnical problem as excavation, embankment, foundations, etc., in which the soil can be modeled by various elastoplastic geomaterial models. The main objective was to consider the effects of excavation depth to the face of the tunnel on the stability of the ground and support system. Depended on the strength of the ground materials, the limit excavation depth without any support system could be established by analyzing three-dimensional excavation problem. In this given example problem, the strengths of the ground materials were enough for the stability of the tunnel without any support system up to fairly deep excavation and the maximum tunnel section displacement was stabilized as the excavation proceed. The asymptotic value was approximately the same as that of the plane strain analysis. Thus, assuming the plain strain condition and simulation the actual excavation procedure, the maximum tunnel section displacement was caculated after final step. The maximum calculated displacement occured at the top section of the tunnel geometry and was about 8mm.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.