• Title/Summary/Keyword: Macro Project

Search Result 68, Processing Time 0.023 seconds

Study on the Layout of Water Diversion Projects Influenced by China's Macro Developing Strategies

  • Peng, Xiang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.59-66
    • /
    • 2008
  • A country's macro developing strategies will greatly impose upon its water resources allocation. Based upon the relationship between national macro developing strategies and water diversion projects layout, the paper discusses the vital influence of water diversion projects caused by China's food security and sustainable development strategy implemented in recent years, and points out that it is an inevitable choice of constructing inter-basin water diversion projects in north China in view of local water resources can't meet the demand of socio-economic development and eco-environment protection, and then recommends China's water diversion projects layout in the current and future, which attaching most importance to the South-to-North Water Diversion Project.

  • PDF

Estimation of Economic Effects on Overseas Oil and Gas E&P by Macroeconomic Model of Korea (거시경제모형을 이용한 해외석유가스개발사업의 경제적 효과 추정 연구)

  • Kim, Ji-Whan;Chung, Woo Jin;Kim, Yoon Kyung
    • Environmental and Resource Economics Review
    • /
    • v.23 no.1
    • /
    • pp.133-156
    • /
    • 2014
  • In general, quantity results of empirical analysis using model shows how much big performance policy has. Therefore this is useful to evaluate a policy. This paper composed macro economic model based on Bank of Korea's quarterly model and annual model, that estimates performance of overseas oil and gas development project to Korean economy in aspect of quantity. In this model, we estimated each effect in real GDP, current account, unemployment rate, CPI and exchange rate carried by recovered amount from overseas oil and gas development project. The recovered amount was evaluated in currency coming from oil and gas acquired from overseas oil and gas development project. Macro economic model of this paper benchmarked macro model composed by Bank of Korea(1997, 2004, 2012). We reviewed model robustness using statistical suitability of each equation and historical simulation for from 1994 to 2011. The recovered amount of overseas oil and gas development project has positive effect in every macro economic index except CPI and exchange rate. Economic effect to macro economic index become bigger with time because the recovered amount of overseas oil and gas development project are increasing until now. Although empirical results of economic effects in every year from the recovered amount of overseas oil and gas development project are different, as of 2011, empirical results showed that the recovered amount of overseas oil and gas development project increase 2.226% and 0.401% in current account and real GDP respectively. And it also decrease 0.489%p in unemployment rate. Exchange rate to US dollars also decrease in amount of 0.379%.

A Study on the Development of Eco-friendly Environmental Indicators for Saemangeum Project (새만금사업의 친환경개발지표 설정 연구)

  • Ryu, Jae-Hong;Lee, Sang-Hoon;Koo, Ja-Kon
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.4
    • /
    • pp.279-288
    • /
    • 2006
  • Saemangeum reclamation project was started in 1991 with the purpose of eco-friendly reclamation, but without clear definition of eco-friendliness. This study was carried out to find out the environmental indicators to define and evaluate the eco-friendliness of Saemangeum project. The methodology to identify the indicators included the analysis of similar reclamation projects, professional discussions, and Delphi survey. The eco-friendly indicators are theoretically based on the five elements of eco-friendliness; 1) resource consumption, 2) energy consumption, 3) pollution emission, 4) bio-diversity, 5) social amenity. The 69 indicators were explained in detail for the convenient use of the indicators by the potential users. The 69 indicators were classified into three categories such as pre-evaluation, process evaluation, and post-evaluation. In terms of spatial consideration, the 69 indicators were classified into two categories such as direct influence area and indirect influence area. Also the 69 indicators were classified into 7 categories: 1) sea, 2) lake, 3) agricultural land use, 4) industrial land use, 5) residential land use, 6) tourism land use, and 7) environmental land use. Twenty core indicators were selected from the 69 indicators by surveying the importance of each indicator. The core indicators are recommended in case of time and budget strain. When there are few quantitative data accumulated for the reclamation project, 5 macro indicators are recommended to be used. Macro indicators are qualitative in nature, and may be used in order to evaluate the overall eco-friendliness of a reclamation project.

Effect of Resident Participation Intention on Project Performance in Rural Development Consulting (농어촌개발 컨설팅에서 주민참여의도가 사업성과에 미치는 영향)

  • Kim, Eunjeong;You, Yen Yoo
    • Journal of Digital Convergence
    • /
    • v.20 no.4
    • /
    • pp.261-268
    • /
    • 2022
  • This study is about the effect of the intention of residents to participate in the regional capacity building project on the project performance. For the method, 238 samples were collected from villagers in Jeollanam-do, and the hypothesis was verified through SPSS22.0 and PROCESS macro 3.5 Model 4. The results showed, first, that there was a difference in performance according to the level of awareness of participation intention. Second, participation intention showed a positive (+) effect on performance. Third, the mediating effect of the regional capacity building project was confirmed. The limitation of the study was that it was limited to the Jeonnam region. Quantitative measurement was not performed in parallel with the performance. In the future, an activation plan through actual citizen participation and performance verification should be prepared.

Policy Suggestions for Fostering Teacher ICT Competencies in Developing Countries: An ODA Project Case in Peru

  • SO, Hyo-Jeong;SEO, Jongwon
    • Educational Technology International
    • /
    • v.21 no.2
    • /
    • pp.217-247
    • /
    • 2020
  • Many developing countries consider ICT as a key enabler to improve their educational systems and teachers are viewed as change agents. This paper aims to present policy suggestions concerning how to foster teachers' ICT competencies in developing countries based on the outcomes of an ODA project case in Peru. This study was conducted through three stages: Literature survey, site visit, and policy suggestions. To draw relevant policy suggestions, we employed the framework of the 'macro-meso-micro' level of teacher professional development. The following policy suggestions are discussed: (a) macro level: to develop the national framework of teacher ICT competencies and competency-based teacher training, (b) meso-level: to promote teacher communities of practices and school-based research programs, and (c) micro-level: to redesign teacher professional development programs to help teachers better understand the complex relationships between content, pedagogy, and technology, beyond learning about basic ICT literacy skills. This study contributes to the understanding of how ODA projects can approach the issue of teacher ICT capacity building at multiple levels.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

A Six Sigma Project for Reducing the Color Variation of the Monitor Materials (모니터 소재의 색상편차 개선을 위한 6시그마 프로젝트)

  • 홍성훈;반재석
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.3
    • /
    • pp.166-176
    • /
    • 2001
  • This paper considers a six sigma project for reducing the color variation of the monitor materials in a chemical plant. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variable evaluation table; a melting pressure, a coloring agent, and a DP color variation. DOE is utilized for finding the optimal process conditions of the three key process input variables. The sigma level of defects rate becomes a 4.58 from a 2.0 at the beginning of the project.

  • PDF

Reducing the Rate of Defective to Improve a Welding Condition -Based on Six Sigma Process- (용접조건 개선으로 불량률 감소 -6시그마 프로세스를 중심으로-)

  • 박진영
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.123-131
    • /
    • 2003
  • This paper considers a six sigma project for reducing the defects rate of the welding process in manufacturing firms. The project follows a disciplined process of five macro phases. define, measure, analyze, improve and control(DMAIC). The need of customers is used to identify critical to quality(CTQ) of project. And a process map is used to identify process input factors of CTQ. Four key process input factors are selected by using an input factor evaluation of teams; an interval of welding, an abrasion, an electric current and a moving freely. DOE is utilized for finding the optimal process conditions of the three key process input factors. Another one key input factor improved to welding machine. The six sigma level of defects rate becomes a 2.01 from a 1.61 at the beginning of the project.

A Case Study of a Six Sigma Project for Improving Gate Painting Quality (게이트 도장 품질 개선을 위한 6시그마 프로젝트 사례 연구)

  • Hong, Sung-Hoon;Choi, Ik-Jun
    • Journal of Korean Society for Quality Management
    • /
    • v.34 no.1
    • /
    • pp.1-12
    • /
    • 2006
  • This paper presents a six sigma project for improving gate painting quality in a medium-sized automotive part company. The project follows a disciplined process of five macro phases: Define, Measure, Analyze, Improve, and Control. A CTQ(critical to quality) is determined based on COPQ(cost of poor quality) analysis, and a process map is utilized for identifying process input variables. Three KPIV s(key process input variable) are selected; Painting Temperature, Painting Quantity, and Painting Viscosity, and DOE(design of experiments) is utilized for finding the optimal process conditions for three KPIVs. MINITAB software is used for data analyses and DOE. The sigma level of defects rate has improved from 2.93 to 3.66.

A six sigma Project for Reducing the Cost Copper Materials of the Cable Manufacturing Process (전선 제조공정의 동(銅) 재료비 개선을 위한 6시그마 프로젝트)

  • Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.121-130
    • /
    • 2009
  • This paper considers a six sigma project for reducing the cost copper of the cable materials in a electric wire company. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variables are selected by using an input variable evaluation table: large cable, plating, and a twisted pair. DOE is utilized for finding the optimal process conditions of the three key process input variables. The implementing result of this six sigma project is enable for reducing of the 2.8% copper materials.