• Title/Summary/Keyword: Machine Scheduling

Search Result 381, Processing Time 0.027 seconds

High speed machining using a NURBS interpolator (NURBS 보간을 이용한 고속 가공)

  • 이동윤;김현철;양민양;최인휴
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2004.04a
    • /
    • pp.323-328
    • /
    • 2004
  • Finish machining of a curved surface is often carried out by an NC system with curved interpolation in a high speed machining strategies. This study aims to develop the NURBS interpolator for the PC-NC based machine tools. In the case of a finish cut using a ball-end mill in high speed machining, low machinability at the bottom of a tool produces a harmful effect on surface roughness. The developed interpolator considers the relation between inclined angle, surface roughness, and feed rate, and adjusts real-time feed rate in order to generate surfaces which have isotropic surface roughness. The proposed interpolator is fully implemented and an experimental results are shown.

  • PDF

Single Machine Dcheduling with Maximum Allowable Tardiness in ET Model (최대 지연시간을 고려한 ET 모델에서의 단일 기계 일정계획)

  • 조성아;조충호;이동훈;김채복
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.23 no.1
    • /
    • pp.29-41
    • /
    • 1998
  • This paper addresses the problem of scheduling a set of jobs with a common due data on a single machine. The objective is to minimize the sum of the earliness and tardiness of jobs subject to $T_{max}{\le}{\Delta}\;for{\Delta}{\ge}0$. Properties for the $MAD/T_{max}$ problem are found and the problem is shown to be NP-complete in the ordinary sense. According to the range of Δ, the problem can be solved in polynomial time. Also, some special cases where an optimal schedule is found in polynomial time are discussed.

  • PDF

The Worker Scheduling Scheme for Maximum Work Efficiency with Workloads Balancing Consideration (작업효율을 만족하고 작업량 평준화를 고려한 작업자할당 방법에 관한 연구)

  • ;;Lee, Hong, Chul;Kim, Sung-Shick
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.4
    • /
    • pp.115-131
    • /
    • 1997
  • The problem addressed in this paper is to minimize the deviations of workloads assigned to worker and to maximize the total utilizations(degree of skill) between workers and machines simultaneously. Each worker can handle the set of machines with the different degree of skill and each machine has the workloads needed to be processed. Also, each worker has to be assigned to at least one machine with the minimum workload deviation. This problem can be formulated as a preemptive goal programming with generalized assignment constraints. The proposed algorithm consists of two phases. First, a capacitated circulation network is constructed to assign the workers to machines with the maximum total utilizations while considering workloads balance. Then, a refinement process is applied to the split machines to satisfy the feasibility condition. The real industrial application in a plastic extrusion manufacturer is included along with several computational experiments.

  • PDF

Honey Bee Based Load Balancing in Cloud Computing

  • Hashem, Walaa;Nashaat, Heba;Rizk, Rawya
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.12
    • /
    • pp.5694-5711
    • /
    • 2017
  • The technology of cloud computing is growing very quickly, thus it is required to manage the process of resource allocation. In this paper, load balancing algorithm based on honey bee behavior (LBA_HB) is proposed. Its main goal is distribute workload of multiple network links in the way that avoid underutilization and over utilization of the resources. This can be achieved by allocating the incoming task to a virtual machine (VM) which meets two conditions; number of tasks currently processing by this VM is less than number of tasks currently processing by other VMs and the deviation of this VM processing time from average processing time of all VMs is less than a threshold value. The proposed algorithm is compared with different scheduling algorithms; honey bee, ant colony, modified throttled and round robin algorithms. The results of experiments show the efficiency of the proposed algorithm in terms of execution time, response time, makespan, standard deviation of load, and degree of imbalance.

Design of a knowledge-based controller for job scheduling in assembly (조립 작업에서의 생산계획 수립을 위한 지식베이스형 제어기의 설계)

  • 김성수;서기성;우광방
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.514-518
    • /
    • 1990
  • This paper describes an experimental Knowledge-Based Control System, named KBCS, for manufacturing and assembly. The KBCS of five parts and function : data-base, knowledge acquisition, optimization, and graphic monitoring. The KBCS is utilized for a FMS which is of five machine centers and automatic assembly lines. Each machine can perform almost all manufacturing functions which some difference in efficiency. Buffers store temporarily the incoming components and the outing components. Parts arrive at assembly lines after many steps of manufacturing, and the transfer path and time are determined by procedural knowledge of control systems. Nine different incoming components are set up. The total control system is expected to perform four algorithms, timing algorithm ,sequencing algorithm, penalty algorithm, and cart algorithm. The construction of controller require basic components of manufacturing systems in which knowledges are formulated on the base of the results and the repeated simulation of KBCS with graphic monitoring system. Simulation results by KBCS are compared with those by the other rules of manufacturing.

  • PDF

Study on Optimized Machining of Duralumin using AFC (AFC를 이용한 두랄루민의 최적화 가공에 관한 연구)

  • Kang, Min-Seog
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.19 no.1
    • /
    • pp.49-55
    • /
    • 2020
  • Studies on the optimizations of machining processes use two different methods. The first is feed control in real-time by spindle load in a machine tool. The second is feed scheduling in NC code control by material removal rate using a CAD/CAM system. Each approach possesses its respective merits and issues compared to the other. That is, each method can be complementary to the other. The purpose of the study is to improve the productivity of the bulkhead, an aircraft Duralumin structure. In this paper, acceleration or deceleration of cutting tool by spindle load data is achieved using adaptive feed control macro programming in a machine tool.

A Study on Loading in Flexible Manufacturing System (유연생산시스템에서 작업할당에 관한 연구)

  • 임재우;노인규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.127-137
    • /
    • 1999
  • This study is concerned with the loading problems in flexible manufacturing system(FMS). The loading problem in FMS is a complex one, when the number of machine and job is increased. It may be time-consuming and even impossible to achieve an optimal solution about this problem mathematically. Thus, a heuristic method is recommended in order to gain near-optimal solutions in a practically acceptable time. A new loading algorithm is developed with a multi-criterion objective of considering the workload unbalance, and maximizing the machine utilization, throughput for critical resources such as the number of tool slots and the number of working hours in a scheduling period and so on. The results of SAS analysis indicated that true average throughput of proposed heuristic loading statistically exceeds that of Shanker and Srinivasulus loading algorithm at the significance level of 0.1.

  • PDF

Unrelated Parallel Processing Problems with Weighted Jobs and Setup Times in Single Stage (가중치와 준비시간을 포함한 병렬처리의 일정계획에 관한연구)

  • Goo, Jei-Hyun;Jung, Jong-Yun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.4
    • /
    • pp.125-135
    • /
    • 1993
  • An Unrelated Parallel Processing with Weighted jobs and Setup times scheduling prolem is studied. We consider a parallel processing in which a group of processors(machines) perform a single operation on jobs of a number of different job types. The processing time of each job depends on both the job and the machine, and each job has a weight. In addition each machine requires significant setup time between processing jobs of different job types. The performance measure is to minimize total weighted flow time in order to meet the job importance and to minimize in-process inventory. We present a 0-1 Mixed Integer Programming model as an optimizing algorithm. We also present a simple heuristic algorithm. Computational results for the optimal and the heuristic algorithm are reported and the results show that the simple heuristic is quite effective and efficient.

  • PDF

A Method of scheduling for the efficient resource allocation in the M2M communication (M2M 통신에서의 효율적인 자원할당을 위한 스케줄링 방안)

  • Lee, Sun-Sic;Song, Min-Seop;Jang, Jong-Wook
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2013.05a
    • /
    • pp.743-746
    • /
    • 2013
  • 사물지능통신(Machine to Machine, M2M) 기술이 부각됨에 따라, 기존의 통신에 비해 사용되는 단말의 수가 점점 증가하고 있다. 따라서 다수의 단말로부터 전송하는 데이터가 이동통신 네트워크를 이용함에 있어 트래픽이 한계상황에 도달하여 원활하지 못한 통신망 운용을 초래할 수 있다. 본 연구는 M2M 통신 시 사용하게 될 이동통신망에 대한 효율적인 자원할당에 대한 스케줄링 방안을 제시한다. 이러한 스케줄링 방안은 트래픽이 급증하게 된 네트워크 망에서 우선적으로 처리해야 될 M2M 통신의 순위를 결정짓는데 사용 될 것이며 M2M 기술이 더욱 발전하게 되어 점차 소형화 되는 사물들이 많아짐에 따라 폭증하게 될 이동통신망의 데이터 트래픽에서 여러 가지 상황을 해결하는데 도움이 될 것이다.

Managing Deadline-constrained Bag-of-Tasks Jobs on Hybrid Clouds with Closest Deadline First Scheduling

  • Wang, Bo;Song, Ying;Sun, Yuzhong;Liu, Jun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.7
    • /
    • pp.2952-2971
    • /
    • 2016
  • Outsourcing jobs to a public cloud is a cost-effective way to address the problem of satisfying the peak resource demand when the local cloud has insufficient resources. In this paper, we studied the management of deadline-constrained bag-of-tasks jobs on hybrid clouds. We presented a binary nonlinear programming (BNP) problem to model the hybrid cloud management which minimizes rent cost from the public cloud while completes the jobs within their respective deadlines. To solve this BNP problem in polynomial time, we proposed a heuristic algorithm. The main idea is assigning the task closest to its deadline to current core until the core cannot finish any task within its deadline. When there is no available core, the algorithm adds an available physical machine (PM) with most capacity or rents a new virtual machine (VM) with highest cost-performance ratio. As there may be a workload imbalance between/among cores on a PM/VM after task assigning, we propose a task reassigning algorithm to balance them. Extensive experimental results show that our heuristic algorithm saves 16.2%-76% rent cost and improves 47.3%-182.8% resource utilizations satisfying deadline constraints, compared with first fit decreasing algorithm, and that our task reassigning algorithm improves the makespan of tasks up to 47.6%.