• 제목/요약/키워드: MR control chart

검색결과 13건 처리시간 0.023초

Strain Analysis of Crust at the Stabilization Stage Using and Applied Statistical Analysis

  • Kim, Hyeong-Sin;Yun, Hyun-Seok;Chae, Byung-Gon;Choi, Jung-Hae;Seo, Yong-Seok
    • 지질공학
    • /
    • 제25권1호
    • /
    • pp.9-20
    • /
    • 2015
  • A strainmeter goes through a period of instability immediately after installation. To determine the stability of strainmeters installed around the Andong fault zone, South Korea, an x-MR control chart analysis and a T2 control chart analysis were conducted. The x-MR control chart analysis used an empirically determined 3σ control limit line to identify abnormal data in recently installed strain gauges. In the T2 control chart analysis, the control limit line was set at a confidence of 95%. A comparison of the early stage of measurement with the terminal stage of measurement for three months after installation indicates that stabilization depends on the location and direction of each strain gauge in x-MR control chart analysis. In the T2 control chart analysis, the number of values exceeding the control limit line decreased as the terminal stage was approached. Based on these results, it is suggested that the 3σ control limit line of an x-MR control chart can be used as a standard for single gauge stability, and that the 95% confidence limit of a T2 control chart analysis could be used as the standard for the stability of multi-gauge strainmeters.

초기공정에서 개별관측치를 이용한 EWM-MR 관리도 (EWM-MR chart for individual measurements in start-up process)

  • 지선수
    • 산업경영시스템학회지
    • /
    • 제21권47호
    • /
    • pp.211-218
    • /
    • 1998
  • In start-up process control applications it may be necessary to limit the sample size to one measurement. A control chart for individual measurements is used whenever it is desirable to examine each individual value from the process immediately. A possible option would be to use an exponential weighted moving(EWM), using modifying statistics with individual measurement, chart for monitoring the process center, and using a moving range (MR) chart for monitoring process variability. In this paper it is shown that there is scheme in using the EWM procedure based on average run length. An expression for the ARL is given in terms of an integral equation, approximated using numerical quadrature. In this case, where it is reasonable to assume normality and negligible autocorrelation in the observations, provide graphs that simplify the design of EWM-MR chart and taking method of exponential smoothing constant(λ) and constant(K) are suggested. The charts suggested above evaluate using the conditional probability.

  • PDF

통계관리도 기법을 적용한 사면붕괴 예측 (Prediction of Slope Failure Using Control Chart Method)

  • 박성용;장동수;정재훈;김영주;김용성
    • 한국지반신소재학회논문집
    • /
    • 제17권2호
    • /
    • pp.9-18
    • /
    • 2018
  • 본 연구에서는 사면 붕괴시 거동특성을 분석하기 위하여 실규모 사면 붕괴 모의실험을 수행하고, 계측된 자료를 역변위와 분석구간(K)의 변화에 따른 x-MR 관리도를 통해 분석하였다. 본 연구 결과, 역변위와 x-MR 관리도 분석에서 사면이 최종 붕괴하기 4분 앞선 시점에서 붕괴 위험징후를 확인하였다. 분석구간에 따른 관리 한계선의 변화를 분석한 결과, x-MR 관리도 작성시 K는 3을 적용하는 것이 효과적이며, 역변위의 x-MR 관리도 기법을 활용함으로써 보다 신속하고 객관적인 판단을 통해 사면 이상거동에 대한 사전예측에 도움이 될 것으로 판단된다. 통계관리도 기법을 적용한 사면붕괴 예측기법은 사면 계측관리기준의 기초자료로 활용이 가능하며, 사면 재해로 인한 인명 및 재산피해 경감에 기여할 수 있을 것으로 판단된다.

터널 시공 중 이상 거동 예측을 위한 계측 변위의 x-MR 관리도 활용 (Application of x-MR control chart on monitoring displacement for prediction of abnormal ground behaviour in tunnelling)

  • 윤현석;송규진;신영완;김창용;추석연;서용석
    • 한국터널지하공간학회 논문집
    • /
    • 제16권5호
    • /
    • pp.445-458
    • /
    • 2014
  • 터널 시공 중 측정된 계측 데이터는 굴진면 전방에 분포하는 지반과 터널 거동을 예측하는데 있어 중요한 요소이다. 그러나 현장에서 측정된 계측 데이터의 변동성을 객관적으로 분석할 수 있는 관리 기준이 명확하게 설정되어 있지 않다. 본 연구에서는 응용 통계 관리기법의 일종인 x-MR 관리도기법을 이용하여 시공 중 붕괴 또는 구조물 균열 등을 발생시키는 현장의 계측 데이터를 분석하고 분석기법의 적용성을 검토하였다. x-MR 관리도를 통해 관리 한계선을 설정하여 분석한 결과, 붕괴 발생 전 약 5~13m 이전에 이상 거동에 대한 예측이 가능하였으며, 시간에 따른 변위의 분석 결과, 최소 1일 전에 예측이 가능하였다. 또한, x-MR 관리도 작성시 이동 범위(k)는 5~10으로 설정하는 것이 이상 거동 예측에 적절한 것으로 판단된다.

관리도 기법을 이용한 터널 변위수렴 특성에 관한 연구 (A Study on Convergency of Tunnel Displacement using Control Chart Method)

  • 임성빈;김성권;서용석;박시현
    • 지질공학
    • /
    • 제17권2호
    • /
    • pp.197-204
    • /
    • 2007
  • 터널은 굴착에 의해 지반의 변형을 일으키며, 지보를 설치하고 시간이 지남에 따라 점차 안정화된다. 터널 굴착이 지반 거동에 미치는 영향은 계측지점과 막장간의 거리가 증가함에 따라 감소한다. 터널의 변위가 수렴하여 안정화되는 시점을 예측할 수 있다면, 안정화 이후 이루어지는 여러 공정들을 앞당김으로써 시간적, 경제적 손실을 줄일 수 있다. 따라서 본 연구에서는 변위 수렴 시점을 예측하기 위하여 관리도 기법을 적용하였다. 퇴적암을 기반으로 하는 터널에 대한 관리도 판정 결과, 막장에서부터의 거리가 최대 100 m 이내에서 변위가 수렴하였다.

짧은 생산 주기를 갖는 누적합 개별치 관리도와 이동범위 관리도 (Short Run Production Cusum IX Chart & MR Chart)

  • 신숙현;나인성;조남호
    • 산업경영시스템학회지
    • /
    • 제24권65호
    • /
    • pp.1-9
    • /
    • 2001
  • Enterprises confronted the Environment of infinite competition should be prepared to abrupt variations of management environment and have the ability to be changed in short term. It has to be studied, the control method of products that correspond to molt-functionalization and reduced product life which is caused by high-quality and varied customers demands. As a process control method, we must be able not only to control varies characteristic in a control at once but also to detected special values quickly for high-quality. In this paper a control method referred above is presented.

  • PDF

Development of a Method for Detecting Unstable Behaviors in Flume Tests using a Univariate Statistical Approach

  • Kim, Seul-Bi;Seo, Yong-Seok;Kim, Hyeong-Sin;Chae, Byung-Gon;Choi, Jung-Hae;Kim, Ji-Soo
    • 지질공학
    • /
    • 제24권2호
    • /
    • pp.191-199
    • /
    • 2014
  • We describe a method for detecting slope instability in flume tests using pore pressure and water content data in conjunction with a statistical control chart analysis. Specifically, we conducted univariate statistical analysis on x-MR control chart data (pore pressure and water content) collected at several points along the flume slope, which we separated into three parts: upper, middle, and lower. To assess our results in the context of landslide forecasting and warning systems, we applied control limit lines at $1{\sigma}$, $2{\sigma}$, and $3{\sigma}$ levels of uncertainty. In doing so, we observed that dispersion time varies depending on the control limit line used. Moreover, the detection of instabilities is highly dependent on the position and type of sensor. Our findings indicate that different characteristics of the data on various factors predict slope failure differently and these characteristics can be identified by univariate statistical analysis. Therefore, we suggest that a univariate statistical approach is an effective method for the early detection of slope instability.

관리도를 이용한 터널 시공현장 계측변위 분석 기법 개발 (A New Method for the Analysis of Measured Displacements during Tunnelling using Control Charts)

  • 임성빈;서용석
    • 지질공학
    • /
    • 제19권3호
    • /
    • pp.261-268
    • /
    • 2009
  • 터널 굴착 중 수행되는 계측은 구성 지반의 거동을 가시화하여 안정성을 평가할 수 있는 중요한 정보를 제공한다. 일반적으로 계측은 터널 굴착면 형성 초기에 집중적으로 수행되며, 시간이 경과할수록 계측횟수를 줄여 나간다. 하지만 이러한 계측 기준 및 관리 지침은 획일적이며 뚜렷한 정량적 기준이 부족한 실정이다. 본 연구에서는 굴착 초기 발생하는 변위의 안정화 시점의 정량적 판단과 안정화 이후의 미세한 변위 변동 특성 분석 및 이상거동 평가를 위해 통계 관리도 기법을 적용하였다. 계측변위에 대한 이동범위(MR) 관리도 및 누적합(CUSUM) 관리도를 작성하여 변위 평가 가능성을 검토하였다.

위험지반 터널 굴진면의 실시간 변위 감시를 위한 계측시스템 개발 (Developments of real-time monitoring system to measure displacements on face of tunnel in weak rock)

  • 윤현석;송규진;김영배;김창용;서용석
    • 한국터널지하공간학회 논문집
    • /
    • 제17권4호
    • /
    • pp.441-455
    • /
    • 2015
  • 본 연구에서는 터널 시공 중 굴진면에서의 붕괴 위험을 판단하여 작업자의 안전을 확보할 수 있는 굴진면 안전감시시스템을 개발하였다. 이 시스템은 실시간으로 측정되는 굴진면 변위를 x-MR 관리도기법으로 실시간 분석함으로써 굴진면의 이상 거동을 감시할 수 있다. 또한 관리 기준을 초과하는 측정치의 개수와 이동 범위 k를 비교하여 굴진면의 이상 거동과 작업 과정에서 발생하는 오류를 구분할 수 있도록 오경보 판단 알고리듬을 개발하였다. 본 연구결과는 위험지반 구간에서의 굴진면의 실시간 거동 감시에 적용되어 작업자의 피해를 최소화 할 수 있을 것으로 판단된다.

터널 굴진면 수평변위를 이용한 굴진면 전방의 단층대 예측 (Prediction of Fault Zone ahead of Tunnel Face Using Longitudinal Displacement Measured on Tunnel Face)

  • 송규진;윤현석;서용석
    • 지질공학
    • /
    • 제26권2호
    • /
    • pp.187-196
    • /
    • 2016
  • 터널 굴진면에서 측정된 수평 변위를 이용하여 터널 굴진면 전방에서의 단층대 예측을 검토하기 위하여 총 28개 단층모델을 대상으로 3차원 유한요소해석을 실시하였다. 그리고 터널 굴착에 의해 발생하는 수평변위를 x-MR (moving range) 관리도 기법을 이용하여 정량적으로 분석하여 굴진면 전방에 분포하는 단층의 존재를 예측하였다. 단층대는 단층점토 및 단층각력, 단층 손상대로 구분하여 모델링하였으며, 단층핵의 폭은 1 m (단층점토 0.5 m, 단층각력 0.5 m), 단층 손상대의 폭은 2 m로 설정하였다. 분석 결과, 굴진면으로부터 약 2~26 m 전방에서 단층의 예측이 가능하였고, 5개의 측정지점에서 대부분 경사 45°인 경우 예측이 가장 빠른 것으로 나타났다. 또한 굴진방향과 단층면 사이의 각도가 작을수록 예측 가능시점이 빠른 것으로 분석되었다.