• Title/Summary/Keyword: MEP design

Search Result 44, Processing Time 0.029 seconds

Identification of target subjects and their constraints for automated MEP routing in an AEC project

  • Park, SeongHun;Shin, MinSo;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.776-783
    • /
    • 2022
  • Since Mechanical, Electrical, and Plumbing(MEP) routing is a repetitive and experience-centered process that requires considerable time and human resources, if automated, design errors can be prevented and the previously required time and human resources can be reduced. Although research on automatic routing has been conducted in many industries, the MEP routing in AEC projects has yet to be identified due to the complexity of system configuration, distributed expertise, and various constraints. Therefore, the purpose of this study is to identify the target subjects for MEP routing automation and the constraints of each subject. The MEP design checklist provided by a CM company and existing literature review were conducted, and target subjects and constraints were identified through process observation and in-depth expert interviews for five days by visiting a MEP design company. The target subjects were largely divided into six categories: air conditioning plumbing, air conditioning duct, restroom sanitary plumbing, heating plumbing, and diagram. The findings from interviews show that work reduction and error reduction has the greatest effect on air conditioning plumbing while the level of difficulty is the highest in air conditioning duct and restroom sanitary plumbing. Major constraints for each subject include preventing cold drafts on air conditioning pipes, deviation in ventilation volume in air conditioning ducts, routing order on restroom sanitary plumbing, and separation distance from the wall on heating plumbing. In this way, subjects and constraints identified in this study can be used for MEP automatic routing.

  • PDF

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF

System Architecture for Effective Point Cloud-based Reverse Engineering of Architectural MEP Pipe Object (효과적인 포인트 클라우드 기반 건축 MEP 파이프 객체 역설계 처리를 위한 시스템 아키텍처)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.9
    • /
    • pp.5870-5876
    • /
    • 2014
  • The aim of this study was to suggest the System Architecture for Effective Architectural MEP Pipe Reverse Design(PRD) based on the Point Cloud and derive the consideration. To do this, the requirement and use-cases related to the MEP pipe reverse design work were defined and the architecture for the reverse design automation was proposed. To identify a consideration for finding the architecture issues, a prototype was developed using the architecture and evaluated.

Study on 3D Image Scan-based MEP Facility Management Technology (3차원 이미지 스캔 기반 MEP 시설물 관리 기술 연구)

  • Kang, Tae Wook
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.18-26
    • /
    • 2016
  • Recently, for the purpose of maintenance of facilities and energy, there have been growing cases of the 3D image scan-based reverse design technology mostly in the manufacturing field. In the MEP field, because of differences between design and physical model, the reverse technology has been utilized in factory facilities such as a semiconductor factory. Because 3D point clouds from scanning include accurate 3D object information, the efficiency of management works related to the complex MEP facilities can be enhanced. In this study, the reverse technology was surveyed, and the MEP facility management based on 3D image scanning was analyzed. Based on the results, a method of 3D image scan-based MEP facility management was proposed.

Design and Verification of Mission Equipment Package System for Korean Utility Helicopter (한국형 기동헬기 임무탑재장비체계 설계 및 입증)

  • Kim, Sung-Woo;Lee, Byoung-Hwa;Yu, Yeon-Woon;Lee, Jong-Hoon;Yim, Jong-Bong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.388-396
    • /
    • 2011
  • Mission Equipment Package(MEP) system is a collection of avionic components that are integrated to perform the mission of the Korean Utility Helicopter(KUH). MEP system development is classified mission-critical embedded system but KUH MEP system developed including flight-critical data implementation. It is important to establish the good development and verification process for the successful system development. This paper describe the development and verification process in each phase for the KUH MEP system. MEP system design is verified through the qualification test, system failure test and compatibility test in System Integration Laboratory(SIL).

Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication (복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출)

  • Lee, Dongmin;Jang, Sejun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

An Automated Process to Produce Shop Drawings for MEP Works in BIM Environment (BIM기반 MEP공사 시공용 도면 작성 자동화 프로세스 제안)

  • Choi, Chang-Hyun;Kwon, Dae-Yong;Cho, Sang-Ho;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.22-31
    • /
    • 2020
  • Shop drawing tasks conducted after finishing coordinated or engineering design have great influences on the quality and cost of a project. However, despite the development of commercial BIM applications, shop drawings have mainly produced manually in certain engineering fields. Incorrect shop drawings with human errors have occurred various problems such as cost overrun, time delay and reworks. An automated shop drawing publishing from BIM is expected to resolve these problems. Despite attempts for automate shop drawing production, the field of mechanical, electrical and plumbing (MEP) is yet regarded challenging due to complexity of components and connection. In this research, we develop a process for automated producing 3D MEP shop drawings in BIM environment as following steps: to analyze conventional MEP shop drawing process, to identify detailed process that can be automated, to classify existing MEP objects and assign codes usable in BIM, and to develop an application. The validation of automated process is conducted against 10 clean room projects in which MEP is more complex and its cost is higher than other projects in terms of productivity and workers' satisfaction. Results show that the number of manpower for shop drawing is reduced by 30%, and the working time is shortened by 31%. Personal opinions of involved practitioners is interpreted as positive as the average rate of agrement on practicability, easy-to-use and necessary retouch tasks is around 66%.

Understanding The MEP Design Level Through BIM (BIM을 통한 건축기계설비 설계 수준의 이해)

  • Hong, Seng-Soo;Hong, Won-Hyuk;Lee, Hyuk-Jin
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.247-251
    • /
    • 2011
  • 국내에도 BIM이 도입되어 다수의 프로젝트가 수행되고 있으며 정부에서는 정책적으로 BIM 확산을 도모하고 있다. 하지만 기술적 한계와 이해의 부족으로 인한 여러 가지 부작용이 발생하고 있으며 특히 현재 도입이 가장 활성화 되어 있는 설계 엔지니어링 업무 영역에서 보완이 필요한 부분도 가장 많이 발생하고 있는 실정이다. 이에 본 연구에서는 기존의 설계사례의 분석을 통해 협업 관점에서 MEP 작업요소의 주요 이슈를 도출하고 건축기계설비의 관점을 좀 더 정확하게 이해할 수 있도록 타 공종 기준의 MEP 작업요소 이해를 위한 기준을 제시하였으며 이러한 내용이 앞으로의 국내의 BIM 프로젝트의 수행과 지침의 작성에 활용될 수 있는 기초자료로 활용되기를 기대한다.

  • PDF

Development of Model Requirements Checklist for Utilizing BIM in Construction Phase - Focused on the MEP - (시공단계 BIM 활용을 위한 모델 요구조건 체크리스트 개발 - MEP를 중심으로 -)

  • Kim, Woojin;Park, Jinho;Cha, Yongwoon;Hyun, Changtaek;Han, Sangwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.22-31
    • /
    • 2019
  • The application of BIM that can manage and integrate information generated during the entire life cycle of buildings in domestic and overseas construction projects is becoming active. When BIM is utilized in the construction phase, it can shorten the construction period, reduce the occurrence of reworks and improve collaboration capability. However, there are limitations in applying BIM to the construction phase due to the insufficient definition level of domestic BIM guidelines and inadequate design standards. In this regard, this study developed BIM model requirements checklist for the application of BIM in the construction phase. To develop the checklists, 21 domestic and overseas BIM guidelines, three public construction projects and four private construction projects to which construction BIM was applied, were analyzed. Based on the guidelines and cases, a total of 62 construction BIM model requirements (31 model objects and 31 attribute rules) and proposed construction BIM model requirement checklists by dividing the 61 requirements according to the requirement and purpose for utilization were identified. It is expected that the practical applications of the checklists proposed in this study will improve the level of BIM model in construction phase. In addition, this study has its significance as a basic research that can be used in the development of standardized guidelines for BIM model in construction phase from academic aspects.

Designing High Performance MEP Systems for Supertall Buildings: A Review of Challenges and Opportunities

  • Burton, Craig
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.4
    • /
    • pp.301-306
    • /
    • 2017
  • The design and construction of supertall buildings has grown dramatically in recent years. This area of practice has traditionally fallen within the purview of a very small group of architects and engineers, but this is rapidly changing, as unprecedented growth and densification has spread to markets not traditionally known for high rise construction. The design community has been increasingly committed to the adoption of green and sustainable design, and the integration of smarter, cleaner technologies across the building spectrum. This paper examines current supertall design trends, and suggests that recently completed and planned projects are trending towards more sustainable solutions, and that a unique set of best practices are emerging specific to Supertalls.