• Title/Summary/Keyword: MANAGEMENT PLAN

Search Result 6,968, Processing Time 0.041 seconds

On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program (철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안)

  • Kim, Jae-Chul;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Am;Han, Soon-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF

Moon Jae-in Government's Plan for Benefit Expansion in National Health Insurance (문재인 정부의 건강보험 보장성 강화대책)

  • Park, Eun-Cheol
    • Health Policy and Management
    • /
    • v.27 no.3
    • /
    • pp.191-198
    • /
    • 2017
  • Moon Jae-in Government announced the Government's 5-Year Plan on July 19, 2017, President Moon directly announced the Government's Plan for Benefit Expansion in National Health Insurance on August 7, 2017. The main contents of the announced expansion include benefit coverage for all medically necessary services with control over non-covered service occurrence, a decrease in the cost-sharing upper limit, and monetary support for catastrophic medical costs. Although past governments have been continuously striving for benefit expansion in the last 15 years, this plan has its breakthrough aspect in that all medical services will be covered by the National Health Insurance. In alignment, there are important tasks to solve: attaining a proper fee schedule, reforming the healthcare delivery system, and improving healthcare quality. This plan is a symptom oriented action in that it is limited in reducing patients' out-of-pocket money, unlike the systematic approach of the National Health Insurance. The sustainability of the National Health Insurance is being threatened due to South Korea's low birth rate, rapidly aging society, and low economic growth, in addition to the unification issue of the Korean Peninsula, medical utilization of the elderly, management of non-communicable diseases, and so on. Therefore, the Government needs to plan the National Health Insurance system reformation including actions addressed toward medical consumers.

Rectifying Inspection Plan for KS A 3102 with Gamma-Prior Distribution (Gamma-Prior가 고려된 KS A 3102의 수정검사방식(修正檢査方式))

  • Jeong, Yeong-Bae;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.15 no.2
    • /
    • pp.55-60
    • /
    • 1987
  • A rectifying inspection plan which assumes a gamma - prior distribution on the lot percent defective is considered. This sampling inspection plan is developed for finite lot sizes with matching OC curves and generated from an initial plan selected from KS A 3102 single sampling by attributes. Comparisons are made with each plan by three examples.

  • PDF

The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

A Study on the Visual Resource Management for Soraksan National Parks and Adjacent Area (국립공원 및 인접지역 경관관리 방안에 관한 연구 - 설악산 국립공원을 중심으로 -)

  • 임승빈;신지훈
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.26 no.2
    • /
    • pp.283-292
    • /
    • 1998
  • The purpose of this study is to suggest visual resource management methods for the national parks and adjacent areas, where visual impacts by high rise buildings such as hotel, condominium, etc. become serious problems. In this study Soraksan National Park has been selected as a case study for landscape management planning. The results of this study are as follows: 1) Comprehensive landscape management planning for National Parks and adjacent areas is necessary to solve visual impact problems by high rise buldings such as hotel, condominium, etc. 2) It is suggested to investigate visual resources and conceptual landscape management ideas, to select landscape control points and lines, landscape management areas, and to prepare building height control plan for proper landscape management plan. 3) In case of Soraksan national park, the landscape management plan includes three landscape management areas : Landscape preservation area, General landscape management area, and special landscape management area. 4) In the part of special landscape management area, it is necessary to introduce landscape impact assessment system to more effective landscape management.

  • PDF

A Study on Assessment Indicators for Integrated Management on Korea National Planning and Environmental Planning (국토계획과 환경계획 통합관리 지표 개발 연구)

  • Heo, Han-Kyul;Sung, Hyun-Chan;Lee, Dong-Kun;Heo, Min-Ju;Park, Jin-Han
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.3
    • /
    • pp.27-45
    • /
    • 2018
  • Both the national land plan and the environmental plan reflect the need for sustainable land use and management. However, the linkage between the plans is reduced due to the lack of integrated management. Therefore, this study developed indicators to achieve integrated management. A total of 59 environmental plans were reviewed for the development of indicators, and a total of 74 integrated management indicators were derived through a three-stage process. In this process, the relevance of the integrated management indicators of this study to the UN 's sustainable development goals (SDGs) is presented in order to derive indicators that meet the level of international consultation. In order to facilitate the utilization of the indicators, the final indicators are divided into seven areas: natural ecology, water resource and quality, urban and green space, atmospheric, energy, landscape, resource circulation and waste. Furthermore, the indicators were classified into national, regional, and city level. Accordingly, the final indicator can be adapted to the field of influence of the planned to be established, and the indicator can be selected and applied to the level of the plan. The final indicators can be used to examine the extent to which the national plan reflects the contents of the environmental plan and can be used as an aid to confirm the contents to be included in the plan when establishing a new national plan.

Influence Factors Analysis on the Productivity of Management Manpower (건축현장 관리인력의 생산성 영향요인 조사 연구)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Kim, Sun-Hyung;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.153-157
    • /
    • 2010
  • As the recent economic downturn continues to undermine the profits of construction industry in Korea, it has become ever more pressing to improve productivity of the industry. Since construction site management manpower staffing plan has close bearing on the productivity of construction projects, it is essential to estimate and mobilize adequate number of resources as per conditions and characteristics of each construction site. However, there are no reference approaches in practice to provide baseline for site management manpower staffing plan or estimation of manpower requirement. Therefore, this study aims to examine factors affecting productivity that warrants first and foremost consideration in development of site management manpower staffing plan during the initial phase of building construction project by conducting survey on industry stakehoders with hands-on responsibilities in construction sites and analyzing their responses. Conclusions herein will provide basic inputs for subsequent studies on development of site management manpower staffing plan as per project characteristics.

  • PDF

A Study on the Development of Safety Management Checklist Using Accident Case adjacent to Railway Operation (철도운행선 인접공사 사고분석과 체계적인 체크리스트 개발 등 안전대책 수립에 관한 연구)

  • Ryu, Sang-Hwan;Yum, Byeoung-Soo;Gal, Won-Mo
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.10
    • /
    • pp.63-72
    • /
    • 2018
  • Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.

The development of auto Ballast Water Management Plan For Bulk Carrier. (BULK선용 자동 Ballast Water Management Plan 개발)

  • Hong, Chung-You;Kwon, Young-Sub;Kwon, Sung-Jin;Hwang, Jin-Wook;Park, Je-Woong
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.266-271
    • /
    • 2003
  • Many port states such as New Zealand. the USA. Australia and Canada have strict regulations to prevent ships which arrive in their port from discharging polluted ballast water which contain harmful aquatic organism and pathogens. They are notified that transfer of polluted ballast water can cause serious injury to public health and damage to property and environment. For this reason. they perceived that the ballast exchange in deep sea is the most effective method. together with submitting the ballast management plan which contains the effective exchange method. ballast system and safety consideration. In this study, we make an effort to develop optimum ballast water exchange management and in result of that. it provide more convenient and stable process to prepare ballast water management plan for Bulk Carrier.

  • PDF

A Fundamental Study on Management Plan of Occurrence Data in Accordance with Engineering & Construction of Pipeline in Frozen Soil Region (동토지역 파이프라인 설계/시공에 따른 발생 데이터의 관리방안에 관한 기초연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.20-21
    • /
    • 2014
  • Recently, activation of related construction projects due to the large traditional gas resource development of frozen soil region of Russia are expected. It is necessary to provide a plan that can be utilized and collectively managed the occurrence data in the engineering & construction stage for continued contracts of the pipe construction. Therefore, this research is aimed to provide a management plan of occurrence data for efficient management in engineering & construction stage of pipeline business in frozen soil region. The data of the engineering & construction(related pipe construction projects) can be accumulated each version and multiply managed. Furthermore, I will be expected to be the foundation of the systematic management of the classifying based on metadata and the optimizing operations using big data method.

  • PDF