• 제목/요약/키워드: MANAGEMENT MODEL

검색결과 22,547건 처리시간 0.039초

A Conceptual Framework to Study the Effectiveness of Interface Management in Construction Projects

  • KEERTHANAA, K.;SHANMUGAPRIYA, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권3호
    • /
    • pp.1-21
    • /
    • 2019
  • The management of mega construction projects which incorporate a large number of stakeholders, technologies, data, work culture etc., is cumbersome. The experts in the construction arena advocate that interface management serves as a precise tool in resolving these conflict points due to the intricate nature of the construction projects. Interface management is a current trending management practice in the construction industry which is also a beneficiary to mega/fast track projects in enhancing the project performance. The main objective of this study is to validate a model for assessing the relationships among interface management, IT applications, project performance & project benefits. The mediating effect of interface management in relationship between project performance & interfacial factors was also investigated. The research model was validated using PLS-SEM (Partial Least Square-Structural Equation Modelling) approach. Data were collected from clients, contractors, consultants in large scale projects through questionnaire survey and smart-PLS software was used to analyse the conceptual model. The research model comprises eleven hypothesis and the significance of these hypothesis were tested using T- statistics values. The research implies that people/participants factor is greatly influenced by interface management with the path coefficient of 0.608 and also enhancement of project's schedule performance due to the interface management is strongly appealing (Path coefficient = 0.711). The results also reveal IT application is significantly associated with interface management practice (Path coefficient =0.723) and also the effect of IT application on project performance (schedule, cost, quality & safety) is successfully mediated through interface management practice. The practical application of this validated model was done through case study. The case study aims at measuring the impact of interface management on interfacial factors and role of interface management in improving the project performance in the construction organisations.

다단계 DEA 모형을 활용한 공급망 품질경영 효율성 분석: 국내 방산업체를 대상으로 (An Efficiency Analysis of Supply Chain Quality Management Using the Multi-stage DEA Model: Focused on the Domestic Defense Industry Companies)

  • 전계룡;유한주
    • 품질경영학회지
    • /
    • 제47권1호
    • /
    • pp.163-186
    • /
    • 2019
  • Purpose: The purpose of this study was to present a methodology for assessing the efficiency of supply chain quality management considering characteristics of defense industries to provide academic and policy implications for strengthening quality competitiveness of military supplies. Methods: Using the defense industry's empirical data, conduct an efficiency evaluation by utilizing a multi-stage DEA/Entropy Model for defense industries subject to the quality level survey of military goods manufacturers in 2017. Results: The results of this study are as follows; the first step of the multi-stage DEA model, Quality Management Performance Efficiency Analysis, shows that the CCR model and the BCC model are more efficient than the parent company. the second stage of the multi-stage DEA model showed that the CCR model was slightly more efficient than the parent company and the BCC model was more efficient than the parent.the overall efficiency value of the multistage DEA model, calculated by multipointing the efficiency value of the first stage by the second stage, was more efficient than the parent. Conclusion: The results of this study show that the efficiency of supply chian quality management performance and profitability in the defense industry can be analyzed for the first time using the multistage DEA/Entropy model to identify specific inefficiencies and support objective decision making.

SI 프로젝트관리 프로세스 개발 (Development of Project Management Process for System Integration)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제35권3호
    • /
    • pp.163-172
    • /
    • 2012
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to system integration projects. This system integration project management process model is composed of six top processes of initiation, preparation for contract, planning, implementation management, coordination and control, and termination and transfer. The five processes are re-divided into 25 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. For this model development, it has chosen the items which constituted a process through a questionnaire of experts.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

MODEL FOR DESIGN MANAGEMENT IN COLLABORATIVE ENVIRONMENT USING DESIGN STRUCTURE MATRIX AND DESIGN PARAMETERS' INFORMATION

  • Salman Akram;Jeonghwan Kim;Jongwon Seo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1307-1312
    • /
    • 2009
  • Design is an act based on multidisciplinary information. The involvement of various stakeholders makes it difficult to process, plan, and integrate. Iteration is frequent in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. The simple project management techniques are insufficient to fulfill the requirements of integrated design. This paper entails two things: design structure matrix and design parameters' information based model. The emphasis has been given to optimal sequence and crucial iteration using design structure matrix analysis technique. The design projects have been studied using survey data from industry. The optimal sequence and crucial iterations results have been utilized for proposed model. Model integrates two things: information about produced- required key design parameters and information of design changes during the design process. It will help to get familiar with Design management in order to fulfill contemporary needs.

  • PDF

제품안전경영을 위한 로드맵과 단계별 실행모형 (A Stepwise Approach to Product Safety Management)

  • 노형봉;이정희
    • 품질경영학회지
    • /
    • 제37권3호
    • /
    • pp.83-93
    • /
    • 2009
  • This study proposes a stepwise approach to product safety management(PSM), of which roadmap consists of five phases. ISO 9001 QM model is assumed as the first-phase model and each higher-phase model is built by adding a corresponding module to the lower one. In the phase order, those modules are CCMS, a failure to warn, manufacturing defect and design defect. The progress in PSM of a domestic food company is discussed.

웹 지식 데이터베이스를 활용한 원자력 중장기 연구개발 웹 기반 지식관리 모델 (Web-based Knowledge Management Model for Mid-Term and Long- Term Nuclear R&D Using Web Knowledge DataBase)

  • 정관성;한도희
    • 한국전자거래학회지
    • /
    • 제5권2호
    • /
    • pp.143-150
    • /
    • 2000
  • This paper presents a methodology how to utilize management of research scheduling plan, processing, and results using Web Knowledge Database System, which integrates research knowledge management model under the Research & Development Environment. The content of this paper consists of description on utilization of the Web Knowledge Database System, sharing of the Research Knowledge through design data review, communications, and management of research knowledge flow during the Research & Development Period.

  • PDF

웹 디자인 프로젝트에서 리스크 매니지먼트 요인에 대한 사례 연구 (A Case Study of Risk Management factors in Web Design Project)

  • 박은영
    • 디자인학연구
    • /
    • 제16권4호
    • /
    • pp.69-78
    • /
    • 2003
  • 웹 디자인 프로젝트에서 리스크 매니지먼트는 매우 중요한 프로젝트 매니지먼트 항목 중 하나이다. 리스크 매니지먼트란 웹 디자인 프로젝트 위기사항을 피하기 위하여 시간을 가지고 리스크의 원인을 찾아내어 적절한 대응책을 강구하여 프로젝트의 최종 목표를 성공적으로 수행하는데 있다. 즉 프로젝트 3대 요소인 일정, 비용, 품질을 만족하기 위한 프로세스이다. 본 논문은 첫째, 웹 디자인 프로젝트 매니지먼트의 개념 및 목적, 프로세스와 지식 영역을 살펴보고 둘째, 웹 디자인 프로젝트 기 계획 단계에서 리스크 매니지먼트 계획에 대한 체계적인 리스크 매니지먼트 프로세스와 리스크 관리 모델을 제안하고 있다. 세 째는 제시한 리스크 매니지먼트 모델의 표준화 및 모델 화의 타당성을 실제 사례인 E사 프로젝트를 통해 검증하고 있다.

  • PDF

생존분석을 이용한 디스플레이 FAB의 반송시간 예측모형 (Prediction Model on Delivery Time in Display FAB Using Survival Analysis)

  • 한바울;백준걸
    • 대한산업공학회지
    • /
    • 제40권3호
    • /
    • pp.283-290
    • /
    • 2014
  • In the flat panel display industry, to meet production target quantities and the deadline of production, the scheduler and dispatching systems are major production management systems which control the order of facility production and the distribution of WIP (Work In Process). Especially the delivery time is a key factor of the dispatching system for the time when a lot can be supplied to the facility. In this paper, we use survival analysis methods to identify main factors of the delivery time and to build the delivery time forecasting model. To select important explanatory variables, the cox proportional hazard model is used to. To make a prediction model, the accelerated failure time (AFT) model was used. Performance comparisons were conducted with two other models, which are the technical statistics model based on transfer history and the linear regression model using same explanatory variables with AFT model. As a result, the mean square error (MSE) criteria, the AFT model decreased by 33.8% compared to the statistics prediction model, decreased by 5.3% compared to the linear regression model. This survival analysis approach is applicable to implementing the delivery time estimator in display manufacturing. And it can contribute to improve the productivity and reliability of production management system.

경영과학의 실행을 위한 체계적 접근에 관한 고찰 (A Study on the Systematic Approach for the Management Science Implementation)

  • 김민성
    • 산업경영시스템학회지
    • /
    • 제9권13호
    • /
    • pp.51-61
    • /
    • 1986
  • The management science was concerned about how to use the main point of the management science model and it's technique by the rational primary factors. The problem's definition, estabilished of the model and it's solving. These function are very difficult and important problems, what is more important, are the model of management science's real prosecution to the manager and management scientist. The management science give us a clue to the solution of a business problem. To get needs conclusion and achieving the estabilished object, we must implement a plan, a stratgem, a policy. If we were not implementing the recommended items, we may call the estabilished model and problem solving impractical, ivory-tower theorizing. But, the implementation of management science model is a complicated problem that is involved mutual relations of managers and management scientist, linkage parts member and the resources of organization. And the other problems of implementation are very complicated problems composed of technologic and economic, social and politic, psychological. This paper reports the implementation of a success that possibly studies a fluent and a chief cause to systematic analysis. Then, first of all I will define of implementation and from these, construction of a unity system, I continue with a catch hold of a main point and a fluent for the successful implementation.

  • PDF