1 |
Gu, S. J. and Choi, B. K. (2008), Simulation Model of In-Line Stocker System in TFT-LCD Line, Journal of the Korean Institute of Industrial Engineers, 1-7.
|
2 |
Hosmer Jr, D. W., Lemeshow, S., and May, S. (2011), Applied survival analysis : regression modeling of time to event data, Wiley.com, 618.
|
3 |
Jang, Y. J. and Choi, G. H. (2006), Introduction to automated material handling systems in LCD panel production lines, In Automation Science and Engineering, CASE IEEE International Conference on (223-229), IEEE.
|
4 |
Jenkins, S. P. (2005), Survival analysis, Unpublished manuscript, Institute for Social and Economic Research, University of Essex, Colchester, UK.
|
5 |
Son, H. S. and Choi, B. G. (2008), Capacity-Filtering Algorithm based Release Planning Method for TFT-LCD Fab, Journal of the Korean Institute of Industrial Engineers, 817-824.
|
6 |
Wei, L. J. (1992), The accelerated failure time model : a useful alternative to the Cox regression model in survival analysis, Statistics in medicine, 11(14/15), 1871-1879.
DOI
ScienceOn
|
7 |
Bradburn, M. J., Clark, T. G., Love, S. B., and Altman, D. G. (2003), Survival analysis Part III : multivariate data analysis-choosing a model and assessing its adequacy and fit, British Journal of Cancer, 89(4), 605.
DOI
|
8 |
Shiue, Y. R. (2009), Data-mining-based dynamic dispatching rule selection mechanism for shop floor control systems using a support vector machine approach, International Journal of Production Research, 47(13), 3669-3690.
DOI
|
9 |
Smith, R. M. and Bain, L. J. (1975), An exponential power life-testing distribution, Communications in Statistics-Theory and Methods, 4(5), 469-481.
|
10 |
Akaike, H. (1974), A new look at the statistical model identification, Automatic Control, IEEE Transactions on, 19(6), 716-723.
DOI
|
11 |
Chen, T. (2009), A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant, International Journal of Systems Science, 40(8), 889-902.
DOI
|
12 |
DeJong, C. D. and Wu, S. P. (2002), Material handling: simulating the transport and scheduling of priority lots in semiconductor factories, In Proceedings of the 34th conference on Winter simulation : exploring new frontiers (1387-1391). Winter Simulation Conference.
|
13 |
Chung, B. H. and Kim, S. I. (2008), Simulation Model for the Performance Analysis of In-Line Stocker System in TFT-LCD Fabrication Line, Journal of the Korean Institute of Industrial Engineers, 1-10
|
14 |
Cox, D. R. (1972), Regression models and life-tables, Journal of the Royal Statistical Society, Series B (Methodological), 187-220.
|
15 |
Chung, B. Y., Heo, Y. H., Park, M. H., and Jang, S. C. (2010), Classification of the Standby time of Equipment to improve the productivity in TFT-LCD Fab, Journal of the Korean Institute of Industrial Engineers, 1-6.
|
16 |
Fox, J. (2002), Cox proportional-hazards regression for survival data. Appendix to An R and S-PLUS Companion to Applied Regression. Available at : http://cran.r-project.org/doc/contrib/Fox-Companion/appendix-cox-regression.pdf.
|
17 |
Kong, S. H. (2007), Two-step simulation method for automatic material handling system of semiconductor fab, Robotics and Computer- Integrated Manufacturing, 23(4), 409-420.
DOI
ScienceOn
|
18 |
Lee, S. H., Moon, B. S., and Park, B. J. (2009), The Bus Delay Time Prediction Using Markov Chain, The Journal of The Korea Institute of Intelligent Transport Systems, 8(3), 1-10.
과학기술학회마을
|
19 |
Liao, D. Y. and Wang, C. N. (2004), Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations, Semiconductor Manufacturing, IEEE Transactions on, 17(3), 324-332.
DOI
|
20 |
Lin, J. S. and Wei, L. J. (1992), Linear regression analysis for multivariate failure time observations, Journal of the American Statistical Association, 87(420), 1091-1097.
DOI
|
21 |
McCulloch, C. E. (2003), Generalized linear mixed models. In NSFCBMS Regional Conference Series in Probability and Statistics (1-84), Institute of Mathematical Statistics and the American Statistical Association.
|
22 |
Qi, J. (2009), Comparison of proportional hazards and accelerated failure time models, Doctoral dissertation, University of Saskatchewan.
|
23 |
Shabtay, D. (2010), Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs, International Journal of Production Economics, 123(1), 235-242.
DOI
|