• 제목/요약/키워드: Long-term safety assessment

검색결과 169건 처리시간 0.026초

Preliminary Selection of Safety-Relevant Radionuclides for Long-Term Safety Assessment of Deep Geological Disposal of Spent Nuclear Fuel in South Korea

  • Kyu Jung Choi;Shin Sung Oh;Ser Gi Hong
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • 제21권4호
    • /
    • pp.451-463
    • /
    • 2023
  • With South Korea increasingly focusing on nuclear energy, the management of spent nuclear fuel has attracted considerable attention in South Korea. This study established a novel procedure for selecting safety-relevant radionuclides for long-term safety assessments of a deep geological repository in South Korea. Statistical evaluations were performed to identify the design basis reference spent nuclear fuels and evaluate the source term for up to one million years. Safety-relevant radionuclides were determined based on the half-life criteria, the projected activities for the design basis reference spent nuclear fuel, and the annual limit of ingestion set by the Nuclear Safety and Security Commission Notification No. 2019-10 without considering their chemical and hydrogeological properties. The proposed process was used to select 56 radionuclides, comprising 27 fission and activation products and 29 actinide nuclides. This study explains first the determination of the design basis reference spent nuclear fuels, followed by a comprehensive discussion on the selection criteria and methodology for safety-relevant radionuclides.

THE DEVELOPMENT OF A SAFETY ASSESSMENT APPROACH AND ITS IMPLICATION ON THE ADVANCED NUCLEAR FUEL CYCLE

  • Hwang, Yong-Soo;Kang, Chul-Hyung
    • Nuclear Engineering and Technology
    • /
    • 제42권1호
    • /
    • pp.37-46
    • /
    • 2010
  • The development of advanced nuclear fuel cycle(ANFC) technology is essential to meet the national mission for energy independence via a nuclear option in Korea. The action target is to develop environmentally friendly, cost-effective measures to reduce the burden of long term disposal. The proper scenarios regarding potential radionuclide release from a repository have been developed in this study based on the advanced korean Reference Disposal System(A-KRS). To predict safety for the various scenarios, a new assessment code based on the GoldSim software has also been developed. Deterministic analysis indicates an environmental benefit from the ANFC as long as the solid waster from the ANFC act as a proper barrier.

Long-term structural analysis and stability assessment of three-pinned CFST arches accounting for geometric nonlinearity

  • Luo, Kai;Pi, Yong-Lin;Gao, Wei;Bradford, Mark A.
    • Steel and Composite Structures
    • /
    • 제20권2호
    • /
    • pp.379-397
    • /
    • 2016
  • Due to creep and shrinkage of the concrete core, concrete-filled steel tubular (CFST) arches continue to deform in the long-term under sustained loads. This paper presents analytical investigations of the effects of geometric nonlinearity on the long-term in-plane structural performance and stability of three-pinned CFST circular arches under a sustained uniform radial load. Non-linear long-term analysis is conducted and compared with its linear counterpart. It is found that the linear analysis predicts long-term increases of deformations of the CFST arches, but does not predict any long-term changes of the internal actions. However, non-linear analysis predicts not only more significant long-term increases of deformations, but also significant long-term increases of internal actions under the same sustained load. As a result, a three-pinned CFST arch satisfying the serviceability limit state predicted by the linear analysis may violate the serviceability requirement when its geometric nonlinearity is considered. It is also shown that the geometric nonlinearity greatly reduces the long-term in-plane stability of three-pinned CFST arches under the sustained load. A three-pinned CFST arch satisfying the stability limit state predicted by linear analysis in the long-term may lose its stability because of its geometric nonlinearity. Hence, non-linear analysis is needed for correctly predicting the long-term structural behaviour and stability of three-pinned CFST arches under the sustained load. The non-linear long-term behaviour and stability of three-pinned CFST arches are compared with those of two-pinned counterparts. The linear and non-linear analyses for the long-term behaviour and stability are validated by the finite element method.

TECHNICAL EVALUATION OF THE CONTINUED OPERATION OF NPP

  • Kim, Tae-Ryong;Jin, Tae-Eun
    • Nuclear Engineering and Technology
    • /
    • 제40권4호
    • /
    • pp.277-284
    • /
    • 2008
  • Recently, the long-term operation of a nuclear power plant beyond its licensed term has become a worldwide trend as long as the safety of the plant is maintained in the extended period. Kori Unit 1, the oldest PWR in Korea, is the foremost example of this type of long-term operation in Korea. Comprehensive technical evaluation of the long-term operation of this plant was completed to confirm the overall safety of the plant. The technical evaluation included a review of PSR results, an assessment on aging management programs and time limited aging analyses, and a statement of radiological impact on the environment. Based on all of the results of the technical evaluation activities, Kori Unit 1 was approved to operate for an additional 10 years beyond its original design life of 30 years.

SIGNIFICANCE OF ACTINIDE CHEMISTRY FOR THE LONG-TERM SAFETY OF WASTE DISPOSAL

  • Kim, Jae-Il
    • Nuclear Engineering and Technology
    • /
    • 제38권6호
    • /
    • pp.459-482
    • /
    • 2006
  • A geochemical approach to the long-term safety of waste disposal is discussed in connection with the significance of actinides, which shall deliver the major radioactivity inventory subsequent to the relatively short-term decay of fission products. Every power reactor generates transuranic (TRU) elements: plutonium and minor actinides (Np, Am, Cm), which consist chiefly of long-lived nuclides emitting alpha radiation. The amount of TRU actinides generated in a fuel life period is found to be relatively small (about 1 wt% or less in spent fuel) but their radioactivity persists many hundred thousands years. Geological confinement of waste containing TRU actinides demands, as a result, fundamental knowledge on the geochemical behavior of actinides in the repository environment for a long period of time. Appraisal of the scientific progress in this subject area is the main objective of the present paper. Following the introductory discussion on natural radioactivities, the nuclear fuel cycle is briefly brought up with reference to actinide generation and waste disposal. As the long-term disposal safety concerns inevitably with actinides, the significance of the aquatic actinide chemistry is summarized in two parts: the fundamental properties relevant to their aquatic behavior and the geochemical reactions in nanoscopic scale. The constrained space of writing allows discussion on some examples only, for which topics of the primary concern are selected, e.g. apparent solubility and colloid generation, colloid-facilitated migration, notable speciation of such processes, etc. Discussion is summed up to end with how to make a geochemical approach available for the long-term disposal safety of nuclear waste or for the performance assessment (PA) as known generally.

An Efficient Chloride Ingress Model for Long-Term Lifetime Assessment of Reinforced Concrete Structures Under Realistic Climate and Exposure Conditions

  • Nguyen, Phu Tho;Bastidas-Arteaga, Emilio;Amiri, Ouali;Soueidy, Charbel-Pierre El
    • International Journal of Concrete Structures and Materials
    • /
    • 제11권2호
    • /
    • pp.199-213
    • /
    • 2017
  • Chloride penetration is among the main causes of corrosion initiation in reinforced concrete (RC) structures producing premature degradations. Weather and exposure conditions directly affect chloride ingress mechanisms and therefore the operational service life and safety of RC structures. Consequently, comprehensive chloride ingress models are useful tools to estimate corrosion initiation risks and minimize maintenance costs for RC structures placed under chloride-contaminated environments. This paper first presents a coupled thermo-hydro-chemical model for predicting chloride penetration into concrete that accounts for realistic weather conditions. This complete numerical model takes into account multiple factors affecting chloride ingress such as diffusion, convection, chloride binding, ionic interaction, and concrete aging. Since the complete model could be computationally expensive for long-term assessment, this study also proposes model simplifications in order to reduce the computational cost. Long-term chloride assessments of complete and reduced models are compared for three locations in France (Brest, Strasbourg and Nice) characterized by different weather and exposure conditions (tidal zone, de-icing salts and salt spray). The comparative study indicates that the reduced model is computationally efficient and accurate for long-term chloride ingress modeling in comparison to the complete one. Given that long-term assessment requires larger climate databases, this research also studies how climate models may affect chloride ingress assessment. The results indicate that the selection of climate models as well as the considered training periods introduce significant errors for mid- and long- term chloride ingress assessment.

Uncertainty in Scenarios and Its Impact on Post Closure Long Term Safety Assessment in a Potential HLW Repository

  • Y.S. Hwang;Kim, S-K;Kang, C-H
    • Nuclear Engineering and Technology
    • /
    • 제35권2호
    • /
    • pp.108-120
    • /
    • 2003
  • In assessing the long term post closure radiological safety assessment of a potential HLW repository in Korea, three categories of uncertainties exist. The first one is the scenario uncertainty where series of different natural events are translated into written statements. The second one is the modeling uncertatinty where different mathematical models are applied for an identical scenario. The last one is the data uncertainty which can be expressed in terms of probabilistic density functions. In this analysis, three different scenarios are seleceted; a small well scenario, a radiolysis scenario, and a naturally discharged scenario. The MASCOT-K and the AMBER, probabilistic safety assessment codes based on connection of sub-modules and a compartment theory respectively, are applied to assess annual individual doses for a generic biosphere. Results illustrate that for a given scenario, predictions from two different codes fairly match well each other But the discrepancies for the different scenarios are significant. However, total doses are still well below the guideline of 2 mRem/yr. Detailed analyses with model and data uncertainties are underway to further assure the safety of a Korean reference dispsoal concept.

A Study on the Development of Quantitative Assessment Criteria of Level Safety and Health, Environment (안전보건환경 수준의 정량적 평가기법 구축에 관한연구)

  • Lim, Jae Chang;Jeong, Hyun Wook;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • 제16권3호
    • /
    • pp.1-7
    • /
    • 2014
  • In this study, based on the international standard the quantitative assessment model for the level of safety, health and environment was developed. As a result of applying this model, the company(workplace) which has established improvement plan based on quantitative assessment of short-term and long-term requirements, and implemented it was acquired more higher level of safety, health and environment by more than the existing ones.

An Alternative Risk Assessment Model in EMS (환경경영시스템에서의 위험평가 모델)

  • 김종걸;김창수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 대한안전경영과학회 2004년도 춘계학술대회
    • /
    • pp.271-276
    • /
    • 2004
  • The risk assessment model is an important subsystem for effective establishment and operation of EMS (environment management system). In case of poor risk assessment long-term and large-scale failure expense might be brought. Managing policy, target and other indices based on risk assessment can guarantee successful EMS. In this paper, we aim at comparative analysis of various risk methods and propose an alternative risk assessment model for EMS.

  • PDF