In the past annual recycling obligation rate calculation of Extended Producer Responsibility (EPR) system, it was difficult to operate the system efficiently, because responsible producers passively participated in the scheme only bent on achieving annual obligation without long-term plan. Thus, a new scheme of long-term recycling obligation rate began to be established every five year from 2008 in order to give the basis for the notice of annual specific operation standard and recycling obligation, thereby helping responsible producers to make a preparation with a plan and giving expectation of active operation of the scheme. However, in the operation of long-term recycling target program, while the development of prediction models and the evaluation for existing items has been conducted in various ways, applications for a new target items and the evaluation are quite insufficient. Therefore, in this study, problems in implementing long-term recycling goal of new target items will be examined, and more objective and rational long-term recycling rate calculation and the operation standard will be proposed. Thus, the long-term recycling target will play a role as a pacemaker to steadily improve the recycling performance of target items, and responsible producers will be expected to increase the achievement with the realistic capacity.
The uncertainty of long term electricity plan consists of the uncertainty of demand forecast and additional generating capacity. Demand forecast is clearly improved the accuracy than the past through improving forecasting methods. However, the uncertainty of additional generating capacity is increased due to the change of market environment. In an operation by a sole utility, additional generating capacity would be possible by the regulation of government. Currently the generation companies have spined off from KEPCO and some IPPs participate the electricity market. It increases the uncertainty due to weakened regulation. Also the environment movement by NGOs and occurrence of civil affairs cause the increase of uncertainty. This research would analyze the current situation on the uncertainty of additional generating capacity and construction delays. Furthermore this research would present the plan to reflecting it in long term electricity plan.
In this study, the goals and the short and long term plan to attain the goals were set up through the analysis of non-government environmental protection organizations actual conditions which were grasped through interview and questionnaire. The goals and the plan were modified and elaborated through 3 times environment experts conferences and a public hearing. The goals were as follows: a) Laying down the guidelines on the organizations. b) Establishing a view of environment. c) Paying a public attention to importance of environment. d) Activations the practice in environmental protection movement. e) Harmonizing the relations between the organizations themselves. government and the organizations, industries and the organizations. f) Establishing the government support system to the organizations in leagal. administrative and financial aspects. g) Enhancing the potentialities on research and development in environmental protection technology. In the short and long term plan, the specific activities to be driven up to the year 2000 were presented by stages.
Annual radiation dose limit to radiation worker was substantially lowered in Korea by the adoption of 1990 recommendations of the International Commission on Radiation Protection (ICRP 60) in its legislation. On the other hand, radiation management environment in nuclear power plants is getting more worse because of the accumulation of radiation sources inside the system and the frequent need for maintenance according as the operation years of nuclear power plants increase. Therefore, Korea Hydro & Nuclear power Co., Ltd. (KHNP) has established a long-term 10 years plan from 2001 to 2010 for the reduction of radiation dose to workers. The plan is aimed for the reduction of annual dose per unit averaged over 5 years from 0.9 man-Sv in 2001 to 0.75 man-Sv in 2010 by radiation source reduction, equipment/tool improvement or new equipment development for easy maintenance, and the improvement of administration and system.
공동주택은 준공 후 일정기간이 경과하면서 사용된 자재의 내구연한에 따라 노후화 현상이 나타난다. 구성자재의 내구연한에 의해 일부부위는 짧은 시간내에 수선을 하여야 하며 어떤 부위는 장시간이 경과한 후에 수선을 하기도 한다. 이와 같이 건물에 나타나는 다양한 노후화 현상에 대해 체계적일 유지관리를 하려면 준공후 경과년수에 따른 장기적인 계획수선을 필요로 한다. 장기수선계획작성에는 건물의 공종에 따른 수선시기를 예측하여 이를 기초로 작성해야 한다. 공동주택에서 장기수선계획이 계획에 지나지 않으며 실질적인 수선에 적용되지 못하는 주요인은 앞으로 수선이 예측되는 건물의 각 부위에 대한 수선시기를 예측하지 못하기 때문이다. 이에 본 연구는 전국에 산재한 공동주택을 장수명화하기 위해 장기수선계획을 활용하여 .해당단지의 부위별 재료의 특성을 반영한 수선주기 및 수선시기를 예측하고, 공동주택 관리자가 주기적 점검, 진단, 교체 등의 사항을 유지관리 캘린더에 의해 단지별로 자동관리할 수 있는 웹기반 유지관리 시스템을 제안하다.
본 연구는 "도서관연구소"의 중장기 발전방안을 제시하는데 목적이 있다. 이를 위하여 주요 외국의 도서관연구 및 관련기구를 분석하여 시사점을 도출하였으며, 또한 도서관연구소를 SWOT 분석하고, 문헌정보학 분야의 교수를 상대로 도서관연구소의 바람직한 역할과 위상에 대한 인식도를 조사하였다. 이를 바탕으로 도서관연구소의 비전과 목표, 전략적 추진과제, 바람직한 위상과 조직체계, 중장기 성장 발전 모형, 내적 운영협력 및 대외 연구협력 체계 등을 제안하였다.
Studied was a strategy of technology development for railway system in terms of railway network. First, The successful launch of the Korean HST system has not only decreased logistics burden but also significantly transformed the Korean trunk-line railway network, revolutionizing the logistics and technology sectors and reinvigorating the Korean railway industry in one century. Korean railway industry sector is now investing to develop many different types of railway system(G7, Post G7, tilting train...) so that these kinds of various railway system development should be integrated with the National Inter-modal Transportation Network Plan. To secure sufficient capacity that is required by the National Railroad Plan, the railway industry needs to establish mid- and long-term train purchase and operation strategies in compliance with railway construction and operation policies. During a railway construction planning, train operators, based on their train operation strategies, should come up with measures to closely cooperate with project operators from the planning stage through to the opening of a railway system. To be more precise, train operators should establish long-term train procurement plans reflecting both long-term national railroad network plans and plans for each railway line in order to suggest appropriate roles and schedules for each line. Also, based on the long-term railway plan, directions should be decided concerning the research and development of trains in advance.
The purpose of this study is to analyze the long-term plans of the central and local governments in order to plan policy and implementing programs. Through this, the governments is find out to reduce administrative burden. Based on the national health plan, evidence and related laws were collected and analyzed. As a quantitative methodology analyzed the contents of related laws in the overall plan. The qualitative methodologies analyzed and categorized the planning status of cities and provinces in the plan and were collated. There are a total of 39 plans for long-term plans by laws. The role of the central and local governments in the public health sector, there are a total of four plans (10.3%) that need to establish long-term and annual plans for the central and local (cities, provinces) government. A total of seven plans (17.9%) were required to establish a plan by the only local government. In terms of the public health sector on the local governments, 20 plans (51.3%) by cities and 12 plans (30.8%) by provinces were established by law. And in the health sector should be established 9 plans (40.9%) by cities and 7 plans (31.8%) by provinces. The plan needs to be reformed and merged between plans so that governments can focus on the program through planning central government policies, reducing local government administration.
본 논문에서는 전력수급기본계획에 열병합발전설비의 최적용량을 반영할 수 있는 방법론을 개발하였으며 이에 따른 효과를 분석하였다. 이를 위해 열병합발전의 계획발전원가를 새로이 산정하여 심사곡선법(Screening Curve Method : SCM)을 이용한 정태적 최적 전원을 구성하였다. 이때, 열병합발전은 전기와 열을 생산하는 것이 가장 중요한 특징이므로 이를 고려할 수 있도록 열병합발전의 전기용량과 열용량을 모두 고려할 수 있는 계획발전원가를 도출하였다. 또한, 심사곡선법을 적용시키기 위한 부하지속곡선의 경우도 열병합발전의 특징을 고려하여 전기 및 열 부하지속곡선을 구성하여 적용하였다. 이때, 현재 수립된 전력 수급기본계획을 최대한 수정하지 않는 범위 내에서 열병합발전설비를 반영하도록 하였다. 열병합발전 건설계획을 반영한 계획안의 타당성을 증명하기 위해서 열병합발전 건설계획을 반영한 계획안과 전력수급기본계획을 비교 하였다. 즉, 발전량 기대치를 산출하여 발전원별 연료소비량 및 환경에 미치는 영향을 도출함으로써 열병합발전의 반영에 대한 효율성을 입증하였다.
Journal of Information Technology Applications and Management
/
제30권4호
/
pp.1-9
/
2023
The purpose of this study was to make a mid- and long-term development plan on the business incubator center after interviewing five startups that currently being occupied in or already left the center and reviewing benchmark on business incubator centers in developed countries such as USA, Sweden, and Israel. For the interview, the three startups currently being occupied in the center and the two companies already left the center were participated. The main strengths of the center from all of these five companies were easy accessibility to the equipment and space and at the same time trustworthy from the outside vendors and/or government, etc. USA is a leading country who has long history for the startups but mostly the private companies/organizations/individuals have supported the startups in terms of funding or consulting. Also, there are countless local governments nationwide who provide funding, education, and/or space for the small businesses. Mainly based on the interview and the benchmarking, the mid- and long-term development plan for the business incubator center was made. All six themes such as consortium for investment or a local network plan were derived for the development plan which was described in this study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.