Design guide for full-face blasting in highway tunnel (고속도로 터널에 대한 전단면 발파 설계방안 연구)

  • Lee, Sang-Don;Choi, Hae-Moon;Lee, Hyun-Koo;Ryu, Chang-Ha
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.930-937
    • /
    • 2004
  • In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.

  • PDF

Optimized Design of Mine Span Considering the Characteristics of Rockmass in Soft Ground (연약암반에서 암반의 특성을 고려한 광산갱도의 최적 설계)

  • Jang, Myoung Hwan;Ha, Taewook;Jeong, Hee Sun
    • Tunnel and Underground Space
    • /
    • v.28 no.2
    • /
    • pp.125-141
    • /
    • 2018
  • For a long-term mine development plan, the determination and design of mine tunnel size are very important because it is the basis of plans for equipment, transportation and operation. The ${\bigcirc}{\bigcirc}$ mine has had a difficulty in changing the mining plan due to the design of the tunnels with an emphasis on productivity improvement, and much effort was needed to maintain the mine tunnel. In this study, we designed the mine tunnel with optimized tunnel span considering the mechanical properties of rockmass and established the support plan. To do this, the estimation of the mechanical parameters(Swelling pressure, deformation coefficient and earth coefficient), field investigations and various analyses were carried out. As a result, it was necessary to consider the downsizing of the tunnel section in order to maintain the tunnel stability and dimension by using the roof bolt and analyzed that various functional constructions of the support material and method would be required to maintain the current tunnel size.

Blasting Design for Large Shaft in Urban Area Considering Noise and Vibration -Singapore Transmission Cable Tunnel EW2- (소음 및 진동을 고려한 도심지 내 대단면 수직구 발파설계 사례 -싱가포르 Transmission Cable Tunnel EW2 공구-)

  • Kim, Julie;Lee, Hyo;Kim, Dave;Ko, Tae-Young;Lee, Simon
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • With increasing needs in power, Singapore is requiring stronger power transmission. Singapore Transmission Cable Tunnel is underground tunnel for transmission system installation such as 400 kV cable. This Transmission Cable Tunnel is 35 km long in total. The North-South Transmission Cable Tunnel is 18.5 km long and there is a total of three (3) contracts; NS1, NS2 and NS3 in respect of the design and construction. The East-West Transmission Cable Tunnel is 16.5 km long, and also there is a total of three (3) contracts; EW1, EW2 and EW3. Among of them, SK E&C has been awarded and operating contract EW2 and NS2. In scope of works, each contract has 3 to 4 shafts which connect aboveground and underground high volt cable and those shafts are used as TBM launching shafts during construction. Transmission Cable Tunnel is undercrossing middle of Singapore and most of shafts are located in urban area. Thus, optimal blasting design satisfying high blasting efficiency as well as blasting vibration limit of Singapore is highly required. Blasting design for large shaft of Singapore Transmission Cable Tunnel follows blasting vibration limits in Singapore and reflects our blasting engineering skills. With Singapore Transmission Cable Tunnel Contract EW2, it is expected that our excellent blasting engineering and performance skills can be delivered to the world.

Behavior of double deck tunnel due to feature change and variation of ground water table (다목적 복층터널의 기능전환과 지하수위 변화에 따른 거동분석)

  • Park, No-Hyeon;Kim, Ho-Jong;Shin, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.6
    • /
    • pp.581-591
    • /
    • 2016
  • Several attempts to construct multi-purpose tunnel for both road and waterway have been made. The multi-purpose tunnel is mainly used as a road tunnel, however it is transferred to waterway to control flood during rainy season. The planning of the multi-purpose tunnel is recognized as cost-effective way of infrastructure construction. In case of the multi-purpose tunnel constructed beneath groundwater table, seasonal fluctuation of groundwater table and repeated flow in the tunnel may cause long-term deterioration of the tunnel system. In this study, the behavior of multi-purpose tunnel in view of groundwater table or flow in the tunnel is investigated using model test and numerical modeling method. The results have shown that rising of groundwater table caused buoyant force to the tunnel and the fluctuation of rainwater in the tunnel generated loosening of surrounding ground. It is recommended to evaluate the effect of the long-term water pressure variation in the design of a multi-purpose tunnel.

A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

Reliability analysis of tunnels with consideration of the earthquakes extreme events

  • Azadi, Mohammad;Ghasemi, S. Hooman;Mohammadi, Mohammadreza
    • Geomechanics and Engineering
    • /
    • v.22 no.5
    • /
    • pp.433-439
    • /
    • 2020
  • Tunnels are one of the most important constructions in civil engineering. The damage to these structures caused enormous costs. Therefore, the safe and economic design of these structures has long been considered. However, both applied loads on the tunnels as well as the resistance of the structural members are naturally uncertain parameters, hence, the design of these structures requires considering the probabilistic approaches. This study aims to determine the load and resistant factors of lining tunnels concerning the earthquake extreme events limit state function. For this purpose, tunnels that have been designed according to the previous design codes (AASHTO Tunnel LRFD 2017) and using reliability analysis, the optimum reliability of these structures for different loading scenarios is determined. In this paper, the tunnel is considered circular. Finally, the proper load and resistance factors are calculated corresponding to the obtained target reliability. Based on the performed calibration earthquake extreme events limit state function, the result of this study can be recommended to AASHTO Tunnel LRFD 2017.

A Study on Efficient Design Technique of RPUM Steel Pipes (RPUM 강관의 효율적인 설계기법에 관한 연구)

  • Kim, Jung-Su;Park, Tae-Soon
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1354-1363
    • /
    • 2006
  • Until now, NATM(New Austrian Tunneling Method) has been increasingly developed based on concept of making use of ground as support. Also, NATM in its essence is a method of risk based on monitoring behaviour of tunnel. This Monitoring is irreplaceable for the quality construction of tunnel, and safety of tunnel itself. Pre-reinforcement ahead of a tunnel face using long steel pipes in NATM, known as the RPUM(Reinforced Protective Umbrella Method), is the auxiliary method to sustain the stability of a tunnel face and reduce the ground settlements. Since design of RPUM has been dependent on the empirical design, it is necessary to develop the improved design methods. In this study, to understand behaviour of steel pipes, it is monitored displacement of tunnel crown, axial force of rock bolt, displacement and axial stress of steel pipes. Also, in order to clarify the mechanical behaviour and RPUM effects, 3-Dimensional numerical analysis is performed that various cases of different parameter combinations including original length and repeated length of steel pipes, installation width and angle, repeated length of steel. In the results of comparison monitoring with analysis, it is suggested more economical and efficient design technique than empirical design methods.

  • PDF

The review about ultra long subsea tunnel design under high water pressure (고수압 초장대 해저터널에 관한 연구)

  • Jun, Duk-Chan;Kim, Ki-Lim;Hong, Eui-Joon;Kim, Chan-Dong;Lee, Young-Joon;Hong, Cheor-Hwa
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.829-843
    • /
    • 2017
  • Subsea tunnel needs to be built over 50 km long to connect between nations and continents. However there are only 19 tunnels longer than 5 km until recently. And there is no history of constructing and operating tunnel longer than 50 km. In Korea, subsea tunnels with a length of more than 50 km are being planned, such as Korea~Japan, Korea~China, Honam~Jeju subsea tunnels. Because of the geographical conditions of Korea, most of these tunnels are inter-contry tunnels. So technology preemption for the subsea tunnel construction is getting more and more important. Most of these subsea tunnels are ultra-long tunnels under high water pressure conditions. So new technologies are required such as ventilation and disaster prevention of high-speed tunnels, securing of structural stability under high pressure conditions, and pressure reduction in high-speed conditions. These technologies are different from those of ground tunnels. Therefore, this paper describes the ultra-long subsea tunnel design under high water pressure of maximum 16 bars through the Honam (land) - Jeju (island) virtual subsea project. We proposed a reasonable solution to various problems such as securing structural stability in high pressure condition and ventilation disaster prevention system of ultra long-tunnel.

Seismic applicability of a long-span railway concrete upper-deck arch bridge with CFST rigid skeleton rib

  • Shao, Changjiang;Ju, Jiann-wen Woody;Han, Guoqing;Qian, Yongjiu
    • Structural Engineering and Mechanics
    • /
    • v.61 no.5
    • /
    • pp.645-655
    • /
    • 2017
  • To determine the seismic applicability of a long-span railway concrete upper-deck arch bridge with concrete-filled steel-tube (CFST) rigid skeleton ribs, some fundamental principles and seismic approaches for long-span bridges are investigated to update the design methods in the current Code for Seismic Design of Railway Engineering of China. Ductile and mixed isolation design are investigated respectively to compare the structural seismic performances. The flexural moment and plastic rotation demands and capacities are quantified to assess the seismic status of the ductile components. A kind of triple friction pendulum (TFP) system and lead-plug rubber bearing are applied simultaneously to regularize the structural seismic demands. The numerical analysis shows that the current ductile layout with continuous rigid frame approaching spans should be strengthened to satisfy the demands of rare earthquakes. However, the mixed isolation design embodies excellent seismic performances for the continuous girder approaching span of this railway arch bridge.

A Study on the Design/construction Standard of Unlined Tunneling Method (Unlined Tunnel 공법 지보재의 설계 및 시공 기준 고찰)

  • 서영화;김성구;나승훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.121-134
    • /
    • 2002
  • Tunneling is a very dangerous and expansive work. Especially, the concrete lining works need many long hours and much cost. As an alternative, the unlined tunneling methods including NMT have been developed in various country. These methods have advantages in cost, time and quality. In Korea, many considerations have been conducted to apply the unlined tunneling method in comparatively good rock. Since primary reinforcements play the role of the final supporting system in unlined tunnels, the initial stiffness and long term durability of reinforcements are very important for tunnel safety. To establish the reinforcements standard suitable to Korea, we investigated the foreign standards and construction cases, comparing geological and construction conditions of foreign land and Korea. As the result, we have proposed the standard of primary supporting system for unlined tunnel in aspects of material, design, construction and quality control etc.