• 제목/요약/키워드: Loading/Unloading time

검색결과 143건 처리시간 0.029초

Towards attaining efficient management of berth maintenance in Saudi Arabian Industrial Ports

  • Mohammed E. Shaawat;Abdullah Binomar;Abdulaziz S. Almohassen;Khalid Saqer. Alotaibi;Mahmoud Sodangi;Ahmad Aftab
    • Structural Monitoring and Maintenance
    • /
    • 제10권1호
    • /
    • pp.25-42
    • /
    • 2023
  • Despite the significance of ports as critical economic infrastructure, the berth facilities usually deteriorate due to heavy loading, unloading, aging, environmental weather conditions, marine growths, and lack of efficient maintenance management. Marine berths require proactive maintenance management to limit deterioration and defects as no berth facility is maintenance-free. Thus, delay in carrying out maintenance work for the marine berths can be devastating to the operational process involving ship entry, loading, and unloading operations. The aim of this research is to coordinate both operations work, and maintenance works that take place inside the berth of a local industrial port in Saudi Arabia, by developing a novel framework that integrates both works without affecting the efficiency and functionality of the berth. The study focused on defining the operational process of the port and identifying the elements with direct and indirect effects. In addition to determining the priority for the entry of ships inside the berth, it also identified the factors involved in designing a framework that included maintenance work as a component of the monthly berth occupancy schedule. By applying a mathematical model, a framework was established, which includes all the important elements of the process. As a result of the mathematical method formulation process, a database was designed that organizes and coordinates the operations of all berths within the port. This creates time to carry out the required maintenance work monthly as well as ease of coordination with the contractors responsible for the implementation of those works.

철송 크레인 일정계획문제에 관한 연구 (A Study on Rail Crane Scheduling Problem at Rail Terminal)

  • 김광태;김경민;김동희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.269-276
    • /
    • 2011
  • This paper considers the rail crane scheduling problem with minimizing the sum of the range of order completion time and make-span of rail crane simultaneously. The range of order completion time implies the difference between the maximum of completion time and minimum of start time. Make-span refers to the time when all the tasks are completed. At a rail terminal, logistics companies wish to concentrate on their task of loading and unloading container on/from rail freight train at a time in order to increase the efficiency of their equipment such as reach stacker. In other words, they want to reduce the range of their order completion time. As a part of efforts to meet the needs, the crane schedule is rearranged based on worker's experience. We formulate the problem as a mixed integer program. To validate the effectiveness of the model, computational experiments were conducted using a set of data randomly generated.

  • PDF

Study on the Short Term Exposure Level (STEL) of the Benzene for the Tank Lorry Truck Drivers during Loading Process

  • Park Doo Yong
    • International Journal of Safety
    • /
    • 제3권1호
    • /
    • pp.27-31
    • /
    • 2004
  • Some of the petroleum products contain benzene which is well known as a confirmed human carcinogen. For example, gasoline products contain benzene ranging up to several percents by weight. High exposures to the benzene and other organic solvents would be likely to occur during intermittent tasks and or processes rather than continuous jobs such as sampling, repair, inspection, and loading/unloading jobs. The work time for these jobs is various. However, most of work time is very short and the representative time interval is 15 minutes. Thus, it is preferable to do exposure assessment for 15 minute time weighted average which is known as a short time exposure level(STEL) by ACGIH rather than for 8-hours TWA. It is particularly significant to the exposure monitoring for benzene since it has been known that the exposure rate plays an important role to provoke the leukemia. Due to the large variations, a number of processes/tasks, the traditional sampling technique for organic solvents with the use of the charcoal and sampling pumps is not appropriate. Limited number of samples can be obtained due to the shortage of sampling pumps. Passive samplers can eliminate these limitations. However, low sampling rates resulted in collection of small amount of the target analysts in the passive samplers. This is originated the nature of passive samplers. Field applications were made with use of passive samplers to compare with the charcoal tube methods for 15 minutes. Gasoline loading processes to the tank lorry trucks at the loading stations in the petroleum products storage area. Good agreements between the results of passive samplers and those of the charcoal tubes were achieved. However, it was found that special cautions were necessary during the analysis at very low concentration levels.

작업시간창이 주어진 크로스토킹 터미널에서 미 선적 물량 최소화를 위한 입출고 트럭 일정계획 (Inbound and Outbound Truck Scheduling to Minimize the Number of Items Unable to Ship in Cross Docking Terminals with a Time Window)

  • 주철민;김병수
    • 대한산업공학회지
    • /
    • 제37권4호
    • /
    • pp.342-349
    • /
    • 2011
  • This paper considers the inbound and outbound truck scheduling problem in a cross docking terminal. The unloading process from inbound trucks and loading process to outbound trucks are assumed to be performed within a time window. If some items are not able to be loaded to their scheduled outbound trucks within the time window, they are stored in the terminal and shipped using the truck visiting the next time window. The objective of this paper is to schedule inbound and outbound trucks to minimize the number of items unable to ship within the time window. A mathematical model for an optimal solution is derived, and a rule-based local search heuristic algorithm and genetic algorithm (GA) are proposed. The performance of the algorithms are evaluated using randomly generated several examples.

모멘트-곡률 관계에 기초한 반복하중을 받는 철근콘크리트 보의 비선형 해석 (Nonlinear Analysis of RC Beams under Cyclic Loading Based on Moment-Curvature Relationship.)

  • 곽효경;김선필
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2000년도 가을 학술발표회논문집
    • /
    • pp.190-197
    • /
    • 2000
  • A moment-curvature relationship to simulate the behavior of reinforced concrete beam under cyclic loading is introduced. Unlike previous moment-curvature models and the layered section approach, the proposed model takes into consideration the bond-slip effect by using monotonic moment-curvature relationship constructed on the basis of the bond-slip relation and corresponding equilibrium equation at each nodal point. In addition, the use of curved unloading and reloading branches inferred from the stress-strain relation of steel gives more exact numerical result. The advantages of the proposed model, comparing to layered section approach, may be on the reduction in calculation time and memory space in case of its application to large structures. The modification of the moment-curvature relation to reflect the fixed-end rotation and pinching effect is also introduced. Finally, correlation studies between analytical results and experimental studies are conducted to establish the validity of the proposed model.

  • PDF

반복하중을 받는 RC기둥의 비선형 해석을 위한 모멘트-곡률 관계의 개발 (Nonlinear Analysis of RC Columns under Cyclic Loading Based on Moment-Curvature Relationship)

  • 곽효경;김선필
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.3-11
    • /
    • 2002
  • A moment-curvature relationship to simulate the behavior of reinforced concrete (RC) columns under cyclic loading is introduced. Unlike previous moment-curvature models and the layered section approach, the unposed model takes into account the bond-slip effect by using a monotonic moment-curvature relationship constructed on the basis of the bond-slip relation and corresponding equilibrium equation at each nodal point. In addition, the use of curved unloading and reloading branches inferred from the stress-strain relation of steel gives more exact numerical result. The pinching enact caused by axial force is considered with an assumption that the absorbing energy corresponding to any deformation level maintains constant regardless of the magnitude of applied axial force. The advantages of the proposed model, comparing tn layered section approach, may be on the reduction in calculation time and memory space in case of its application to large structures.. Finally, correlation studies between analytical results and experimental studies are conducted to establish the validity of the proposed mood.

  • PDF

컨테이너 터미널의 효율적인 실시간 작업 재할당 연구 (Real-time Job Reallocation Problem in Container Terminals)

  • 박나현;신재영
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2012년도 추계학술대회
    • /
    • pp.82-83
    • /
    • 2012
  • 고객 서비스를 향상시키는데 있어서 컨테이너 터미널의 운영 효율성은 중요하다. 그러므로 하역 속도를 높이고 정박시간을 줄이기 위해 사전에 효율적인 선적 계획을 세우고 실행한다. 그러나 항만 환경은 바뀔 수 있고 사전 계획만으로는 항만을 운영하는 것에는 한계점이 있으므로 실시간 계획이 필요하다. 본 연구에서는 돌발 상황에서 총 작업 시간을 최소화하기 위해 크레인의 작업을 재할당하는 문제를 정의하고 해결책을 제시한다.

  • PDF

모델기반의 전자부품 FAB설비 생산기준정보 추정 (Model-based Estimation of Production Parameters of Electronics FAB Equipment)

  • 강동훈;김민규;최병규;박범철
    • 대한산업공학회지
    • /
    • 제33권2호
    • /
    • pp.166-173
    • /
    • 2007
  • In this paper, we propose a model-based approach to estimating production parameters of semiconductor FAB equipment. For FAB scheduling, for example, we need to know equipment's production parameters such as flow time, tact time, setup time, and down time. However, these data are not available, and they have to be estimated from material move data such as loading times and unloading times that are automatically collected in modern automated semiconductor FAB. The proposed estimation method may be regarded as a Bayes estimation method because we use additional information about the production parameters. Namely, it is assumed that the technical ranges of production parameters are known. The proposed estimation method has been applied to a LCD FAB, and found to be valid and useful.

다중 무인운반차량 시스템에서의 동적 라우팅과 스케줄링 (Dynamic Routing and Scheduling of Multiple AGV System)

  • 전동훈
    • 한국시뮬레이션학회논문지
    • /
    • 제8권3호
    • /
    • pp.67-76
    • /
    • 1999
  • The study of the optimization of operating policy of AGV system, which is used in many factory automation environments has been proceeded by many researchers. The major operating policy of AGV system consists of routing and scheduling policy. AGV routing is composed with collision avoidance and minimal cost path find algorithm. To allocate jobs to the AGV system, AGV scheduling has to include AGV selection rules, parking rules, and recharging rules. Also in these rules, the key time parameters such as processing time of the device, loading/unloading time and charging time should be considered. In this research, we compare and analyze several operating policies of multiple loop-multiple AGV system by making a computer model and simulating it to present an appropriate operating policy.

  • PDF

다중 AGV의 이동시간과 작업시간을 고려한 고정 경로에서 충돌 회피 알고리즘 (Collision Avoidance Algorithms of Multiple AGV Running on the Fixed Runway Considering Running and Working Time)

  • 류강수
    • 한국멀티미디어학회논문지
    • /
    • 제21권11호
    • /
    • pp.1327-1332
    • /
    • 2018
  • An AGV(Automated Guided Vehicle) where is running on production automated system is related efficiency of production system similarly. On previous study proposed a path collision avoidance algorithms using shortest path of AGV. Running time about loading and unloading with shortest path of AGV is important factor to decide the production system efficiency. In this paper, we propose a method of shortest path and shortest time. Also propose the decision making method of collision avoidance position for setup a shortest runway for next command. To do verify the proposed method consist a simulation for AGV. Finally, we compare and analyse the proposed system between the existing system and show that our system can effectively the performance.