In recent years, customers and power supplies are interested in power quality. Demands of customers are change from standard quality of distribution power system to various high quality of distribution power system. so, it is necessary to apply power quality compensator. in our project, we develop the UPQC(Unfied Power Quality Compensator of 45kVA which compensates power factor and voltage sag, interruption. it is very frequently occurred power quality problems. As a series and shunt compensator, UPQC consists of two inverters with common dc link capacitor bank. It compensates the current quality in the shunt part and the voltage quality in the series part. In this paper, we present simulation and test result of developed UPQC system. Test for UPQC are performed at voltage sag, flickers and non-linear load conditions. For voltage sag and ficker generation, we use RTDS(Real Time Digital Simulator) and power amplifier system.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.9
/
pp.541-550
/
2019
An emergency generator is key equipment for fire-fighting to supply power to fire-fighting facilities, which protect property and people in cases of fire accidents. A rated load test for emergency generators must be carried out by connecting an emergency load to the generator in accordance with related regulations. However, a no-load test has been performed for emergency generators in general since serious problems can occur when the main power is cut off, including the damage of customer devices and shut down of critical loads. Therefore, this paper proposes a load test method for an emergency generator using energy storage system (ESS) without the interruption of main power. The emergency power system was also modeled based on PSCAD/EMTDC software, and a 200-kW scale ESS load test device was implemented. The simulation and test results show that the load test method is useful and practical for an emergency power supply system.
The Transactions of the Korean Institute of Power Electronics
/
v.18
no.3
/
pp.240-246
/
2013
An Uninterruptible Power Supply(UPS) is a system designed to deliver energy during accidents that the AC mains is out of its acceptable limits, without interruption of power flow through the load. Battery Discharger is the device to supply high quality power to the Inverter, when accidents occur, such as Power Failure. The Battery Discharger should have a fast response characteristics. The LLC resonant converter for UPS battery discharger is proposed. The proposed Battery Discharger offers substantial improvements in efficiency, size and cost. The proposed Battery Discharger of UPS approach is a good solution for high power applications above KW. To verify the validity of proposed Battery Discharger, simulations and experiments are carried out.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.4
/
pp.490-494
/
2014
In this paper, a design of high-speed power-off circuit and analysis. The incidence of high-dose transient radiation into the silicon-based semiconductor element induces the photocurrent due to the creation of electron-hole pairs, which causes the upset phenomenon of active elements or triggers the parasitic thyristor in the element, resulting in latch-up. High speed power-off circuit was designed to prevent burn-out of electronic device caused by Latch-up. The proposed high speed power-off circuit was configured with the darlington transistor and photocoupler so that the power was interrupted and recovered without the need for an additional circuit, in order to improve the existing problem of SCR off when using the thyristor. The discharge speed of the high speed power interruption circuit was measured to be 19 ${\mu}s$ with 10 ${\mu}F$ and 500 ${\Omega}$ load, which was 98% shorter than before (12.8 ms).
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.1
/
pp.96-101
/
2010
Superconducting Magnetic Energy Storage (SMES) system is one of the key technologies to overcome the voltage sag, swell, interruption and frequency fluctuation by fast response speed of current charge and discharge. In order to evaluate the characteristics of over mega joule class grid connected High Temperature Superconducting (HTS) SMES system, the authors proposed an algorithm by which the SMES coil could be connected to the Real Time Digital Simulator (RTDS). Using the proposed algorithm, users can perform the simulation of voltage sag and frequency stabilization with a real SMES coil in real time and easily change the capacity of SMES system as much as they need. To demonstrate the algorithm, real charge and discharge circuit and active load were manufactured and experimented. The results show that the current from real system was well amplified and applied to the current source of simulation circuit in real time.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.9
/
pp.51-58
/
2015
Intelligent distribution automation system includes operating a switchgear of distribution system remotely when switchgear are not available to operate quickly. This system makes it possible to reduce the interrupt time. It also aims to improve the reliability of customers. Currently, Intelligent distribution automation improves the reliability by replacing manual switchgear, which is installed as sectional switchgear. However the prioritization of the replacement for the switchgear is required for its intellectualization. Many studies have been conducted related with prioritization of switchgear replacement. But it is difficult to interpret and apply to the power distribution system. That is because most of the studies just considers customer numbers for prioritizing the replacement. In this paper presents an algorithm to determine the intelligent swichgear replacement priority considering customer number, load quantity and interruption cost. Further, this algorithm is verified by using system reliability index.
Kim, A-Rong;Kim, Dae-Won;Kim, Gyeong-Hun;Kim, Jin-Geun;Park, Min-Won;Yu, In-Keun;Sim, Ki-Deok;Kim, Seock-Ho;Seong, Ki-Chul
Proceedings of the KIEE Conference
/
2009.07a
/
pp.601_602
/
2009
Superconducting Magnetic Energy Storage (SMES) system is one of the key technologies to overcome the voltage sag, swell, interruption and frequency fluctuation by fast response speed of current charge and discharge. In order to evaluate the characteristics of over mega joule class grid connected High Temperature Superconducting (HTS) SMES system, the authors proposed an algorithm by which the SMES coil could be connected to the Real Time Digital Simulator (RTDS). Using the proposed algorithm, users can perform the simulation of voltage sag and frequency stabilization with a real SMES coil in real time and easily change the capacity of SMES system as much as they need. To demonstrate the algorithm, real charge and discharge circuit and active load were manufactured and experimented. The results show that the current from real system was well amplified and applied to the current source of simulation circuit in real time.
This paper presents a study on the application of Asynchronous Team(A-Team) theory for QVC(Reactive power control) and security assessment in a power system. Reactive power control problem is the one of optimally establishing voltage level given reactive power sources, which is very important problem to supply the demand without interruption and needs methods to alleviate a bus voltage limit violation more quickly. It can be formulated as a mixed-integer linear programming(MILP) problem without deteriorating of solution accuracy to a certain extent. The security assessment is to estimate the relative robustness of the system and deterministic approach based on AC load flow calculations is adopted to assess it, especially voltage security. A distance measure, as a measurement for voltage security, is introduced. In order to analyze the above two problem, reactive power control and static security assessment, In an integrated fashion, a new organizational structure, called an A-team, is adopted. An A-team is well-suited to the development of computer-based, multi-agent systems for operation of large-scaled power systems. In order to verify the usefulness of the suggested scheme herein, modified IEEE 30 bus system is employed as a sample system. The results of a case study are also presented.
International Journal of Fuzzy Logic and Intelligent Systems
/
v.12
no.1
/
pp.42-46
/
2012
With the development of industry, more large-scale non-linear loads are added to existing power systems and they cause the serious power quality (PQ) problems to the nearby sensitive installations more and more. To protect the important loads and mitigate the impact of PQ disturbances on them, various compensating devices are installed. One of the most important control skills used in the compensating equipment at the load side is how fast they can recognize or detect the discontinuous abnormal PQ events from the normal voltage signal. This paper deals with two estimation methods for the fast detection and tracking of general PQ disturbances: Teager Energy Operator (TEO), which is a non-linear operator and used for a short time energy calculation, and Kalman Filter (KF), which is one of the most universally used estimation techniques. And it is also shown how to apply the TEO and the KF to detect the PQ disturbances such as voltage sag, swell, interruption, harmonics and voltage fluctuation.
Proceedings of the Korean Geotechical Society Conference
/
2004.03b
/
pp.561-564
/
2004
Steel sheet pile can be alternative material for bridge abutment for. The steel sheet pile bridge abutment is new and replacement bridge abutment due to its aesthetically attractive and cost effective. Use of embedded steel sheet piling brings savings in dead load, provides a compliant retaining wall, and permits speedier construction. In addition, for replacement bridge projects, traffic interruption can be minimized. It is hoped that this study will encourage designers and constructors to consider a steel substructure option more frequently during the conceptual and preliminary design phases of projects and thereby to take advantage of the potential to construction more efficiently. In this paper, an analysis of stress and strain for steel sheet pile bridge abutment was conducted. From the analysis results, the stress and strain characteristics of steel sheet pile bridge abutment with variations of steel sheet pile parameters is suggested.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.