• Title/Summary/Keyword: Load current control

Search Result 1,281, Processing Time 0.037 seconds

Analysis of the Outdoor Design Conditions for Greenhouse Heating and Cooling Systems in Korea (온실의 냉난방시스템 설계용 외부기상조건 분석)

  • Nam, Sang-Woon;Shin, Hyun-Ho
    • Journal of Bio-Environment Control
    • /
    • v.25 no.4
    • /
    • pp.308-319
    • /
    • 2016
  • In order to set the outdoor weather conditions to be applied to the design standard of the greenhouse heating and cooling system, outdoor air temperature and heating degree-hour for heating design, dry bulb temperature, wet bulb temperature and solar irradiance for cooling design were analyzed and presented. For every region in Korea, we used thirty years from 1981 to 2010 hourly weather data for analysis, which is the current standard of climatological normal provided by KMA. Since the use of standard weather data is limited, design weather conditions were obtained using the entire weather data for 30 years, and the average value of the entire data period was presented as a design standard. The design weather data with exceedance probability of 1, 2.5, and 5% were analyzed by the TAC method, and we presented the distribution map with exceedance probability of 1% for heating and 2.5% for cooling which are recommended by design standards. The changes of maximum heating load, seasonal heating load and maximum cooling load were examined by regions, exceedance probabilities, and setpoint temperatures. The proposed outdoor design conditions can be used not only directly for the greenhouse heating and cooling design, but also for the reinforcement of heating and cooling facilities and the establishment of energy saving measures. Recently, due to the climate change, sweltering heat in summer and abnormal temperature in winter are occurring frequently, so we need to analyze weather data periodically and revise the design standard at least every 10 years cycle.

Analysis of Packet Transmission Delay in the DC Power-Line Fault Management System using IEEE 802.15.4 (IEEE 802.15.4를 적용한 직류배전선로 장애관리시스템에서 패킷전송 지연시간 분석)

  • Song, Han-Chun;Hwang, Sung-Ho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.1
    • /
    • pp.259-264
    • /
    • 2014
  • IEEE 802.15.4 has been emerging as the popular choice for various monitoring and control applications. In this paper, a fault management system for DC power-lines has been designed using IEEE 802.15.4, in order to monitor DC power-lines in real time, and to rapidly detect faults and shut off the line where such faults occur. Numbers were allocated for each node and unslotted CSMA-CA method of IEEE 802.15.4 was used, the performance of which was analyzed by a simulation. For such purpose, a total of 60 bits of the control data consisting of 16 bits of the current, 16 bits of the amplitude, 28 bits of the terminal state data were sent out, and the packet transfer rate and the transmission delay time of the fault management system for DC power-lines were measured and analyzed. When the traffic load was 330 packets per second or lower, the average delay time was shown to be shorter than 0.02 seconds, and when the traffic load was 260 packets per second or lower, the packet transfer rate was shown to be 99.99% or higher. Therefore, it was confirmed that the stringent condition of US Department of Energy (DOE) could be satisfied if the traffic load was 260 packets per second or lower, The results of this study can be utilized as basic data for the establishment of the fault management system for DC power-lines using IEEE 802.15.4.

Performance Improvement on MPLS On-line Routing Algorithm for Dynamic Unbalanced Traffic Load

  • Sa-Ngiamsak, Wisitsak;Sombatsakulkit, Ekanun;Varakulsiripunth, Ruttikorn
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1846-1850
    • /
    • 2005
  • This paper presents a constrained-based routing (CBR) algorithm called, Dynamic Possible Path per Link (D-PPL) routing algorithm, for MultiProtocol Label Switching (MPLS) networks. In MPLS on-line routing, future traffics are unknown and network resource is limited. Therefore many routing algorithms such as Minimum Hop Algorithm (MHA), Widest Shortest Path (WSP), Dynamic Link Weight (DLW), Minimum Interference Routing Algorithm (MIRA), Profiled-Based Routing (PBR), Possible Path per Link (PPL) and Residual bandwidth integrated - Possible Path per Link (R-PPL) are proposed in order to improve network throughput and reduce rejection probability. MIRA is the first algorithm that introduces interference level avoidance between source-destination node pairs by integrating topology information or address of source-destination node pairs into the routing calculation. From its results, MIRA improves lower rejection probability performance. Nevertheless, MIRA suffer from its high routing complexity which could be considered as NP-Complete problem. In PBR, complexity of on-line routing is reduced comparing to those of MIRA, because link weights are off-line calculated by statistical profile of history traffics. However, because of dynamic of traffic nature, PBR maybe unsuitable for MPLS on-line routing. Also, both PPL and R-PPL routing algorithm we formerly proposed, are algorithms that achieve reduction of interference level among source-destination node pairs, rejection probability and routing complexity. Again, those previously proposed algorithms do not take into account the dynamic nature of traffic load. In fact, future traffics are unknown, but, amount of previous traffic over link can be measured. Therefore, this is the motivation of our proposed algorithm, the D-PPL. The D-PPL algorithm is improved based on the R-PPL routing algorithm by integrating traffic-per-link parameters. The parameters are periodically updated and are dynamically changed depended on current incoming traffic. The D-PPL tries to reserve residual bandwidth to service future request by avoid routing through those high traffic-per-link parameters. We have developed extensive MATLAB simulator to evaluate performance of the D-PPL. From simulation results, the D-PPL improves performance of MPLS on-line routing in terms of rejection probability and total throughput.

  • PDF

DCM DC-DC Converter for Mobile Devices (모바일 기기용 DCM DC-DC Converter)

  • Jung, Jiteck;Yun, Beomsu;Choi, Joongho
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.319-325
    • /
    • 2020
  • In this paper, a discontinuous-conduction mode (DCM) DC-DC buck converter is presented for mobile device applications. The buck converter consists of compensator for stable operations, pulse-width modulation (PWM) logic, and power switches. In order to achieve small hardware form-factor, the number of off-chip components should be kept to be minimum, which can be realized with simple and efficient frequency compensation and digital soft start-up circuits. Burst-mode operation is included for preventing the efficiency from degrading under very light load condition. The DCM DC-DC buck converter is fabricated with 0.18-um BCDMOS process. Programmable output with external resistors is typically set to be 1.8V for the input voltage between 2.8 and 5.0V. With a switching frequency of 1MHz, measured maximum efficiency is 92.6% for a load current of 100mA.

Proportional Resonant Feedforward Contrl Algorithm for Speed Ripple Reduction of 3-phase SPMSM (3상 영구자석 동기전동기의 속도 맥동 저감을 위한 비례공진 전향보상 제어 알고리즘)

  • Lee, Seon-Yeong;Hwang, Seon-Hwan;Kim, Gyung-Yub;Park, Jong-Won
    • Journal of IKEEE
    • /
    • v.24 no.4
    • /
    • pp.1104-1108
    • /
    • 2020
  • This paper propose a variable proportional resonant feedforward algorithm for reducing the speed ripple of a three-phase permanent magnet synchronous motor. In general, the torque ripples can be generated by electrical pulsation due to current measurement errors and dead time and mechanical pulsation because of rotor eccentricity and eccentric load. These torque pulsations can cause speed pulsations of the motor and degrade the operating performance of the motor drive system. Therefore, in this paper, the factors of the speed ripple is analyzed and an algorithm to reduce the speed ripple is proposed. The proposed algorithm applied a variable proportional resonant controller in order to reduce the specific operating frequency included in the speed pulsation, and utilized a feedforward compensation controller structure to perform the compensation operation. The proposed algorithm is verified through various experiments.

A Study on Automatic Multi-Power Synchronous Transfer Switch using New DFT Comparator (새로운 DFT 비교기를 이용한 자동 다전원 동기절체 스위치에 관한 연구)

  • Kwak, A-Rim;Park, Seong-Mi;Son, Gyung-Jong;Park, Sung-Jun;Kim, Jong-Cheol
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.3
    • /
    • pp.423-431
    • /
    • 2022
  • The UPS(Uninterruptible Power Supply) system operates in the battery charging mode when the grid is normal, and in the UPS mode, which is the battery discharge mode when a grid error occurs. Since the UPS must supply the same voltage as the grid to the load within 4 [ms] in case of a grid error, the switching time and power recovery time should be short when controlling the output voltage and current of the UPS, and the power failure detection time is also important. The power outage detection algorithm using DFT(Discrete Fourier Transform) proposed in this paper compares the grid voltage waveform with the voltage waveform including the 9th harmonic generated through DFT using Schmitt trigger to detect power outage faster than the existing power outage monitoring algorithm. There are advantages. Therefore, it is possible to supply instant and stable power when switching modes in the UPS system. The multi-power-applied UPS system proposed in this paper uses DFT, which is faster than the conventional blackout monitoring algorithm in detecting power failure, to provide stable power to the load in a shorter time than the existing power outage monitoring algorithm when a system error occurs. The detection method was applied. The changeover time of mode switching was set to less than 4 [ms], which is 1/4 of the system cycle, in accordance with KSC 4310 regulation, which was established by the Industrial Standards Council on the regulation of uninterruptible power supply. A 10 [kW] UPS system in which commercial voltage, vehicle generator, and auxiliary diesel generator can be connected to each of the proposed transfer devices was constructed and the feasibility was verified by conducting an experiment.

Response of coal rock apparent resistivity to hydraulic fracturing process

  • Song, Dazhao;Wang, Enyuan;Qiu, Liming;Jia, Haishan;Chen, Peng;Wei, Menghan
    • Geomechanics and Engineering
    • /
    • v.14 no.6
    • /
    • pp.581-588
    • /
    • 2018
  • In order to explore the comprehensive evaluation means of the extent of hydraulic fracturing region in coal seams, we analyzed the feasibility of detecting the response of coal rock direct current (DC) apparent resistivity to hydraulic-fracturing using Archie's theory, and conducted experimental researches on the response of DC resistivity in the hydraulic fracturing process using small-scale coal rock samples. The results show that porosity and water saturation are the two factors affecting the apparent resistivity of coal rock while hydraulic fracturing. Water has a dominant effect on the apparent resistivity of coal rock samples. The apparent resistivity in the area where water flows through is reduced more than 50%, which can be considered as a core affect region of hydraulic fracturing. Stress indirectly impacts the apparent resistivity by changing porosity. Before hydraulic fracturing, the greater axial load applied, the more serious the rupture in the samples, resulting in the greater apparent resistivity. Apparent resistivity testing is a potential regional method to evaluate the influence range of hydraulic fracturing in coal seams.

A Modelling and Analysis of SSSC and UPFC in Static Analysis of Power Systems (IPLAN을 사용한 SSSC와 UPFC의 모델링과 정태해석에 미치는 영향 분석)

  • 김덕영;조언중;이군재;이지열
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.6
    • /
    • pp.15-19
    • /
    • 2001
  • This paper presents an modelling and analysis of SSSC and UPFC in static analysis of power systems. SSSC is used to control active power flow in transmission lines by controlling the phase angle of the injected voltage source which is in rectangular to the line current. UPEC is used to control the magnitude and phase of the injected voltage sources which are connected both in series and in parallel with the transmission line to control power flow and bus voltage. To compare the effect of SSSC and UPFC in power system static analysis, the PSS/E simulation program is used. As the FACTS device model such as SSSC and UPFC is not provided in PSS/E yet, an equivalent load model is used. This procedure is implemented by IPLAN which is an external macro program of PSS/E. The simulation results show that UPFC is more effective to improve bus voltage than SSSC in power system static analysis.

  • PDF

Experimental Study of Concrete Beam with FRP Plank as Formwork and Reinforcement (FRP 판을 거푸집 및 보강재로 활용한 콘크리트 보의 실험적 연구)

  • Yoo, Seung-Woon;Bae, Han-Ug;Oliva, Michael;Bank, Lawrence
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.1
    • /
    • pp.67-74
    • /
    • 2007
  • We perform an experimental study of concrete beam with pultruded fiber reinforced polymer(FRP) plank using as a permanent formwork and the tensile reinforcement. A satisfactory bond at the interface between the smooth surface of the pultruded plank and the concrete must be developed for the FRP plank and the concrete to act as a composite structural member. Two kinds of aggregate were bonded to the FRP plank using a commercially available epoxy. No additional flexural or shear reinforcement was provided in the beams. For comparison we test two types of control specimen. One control did not have any aggregate bonded to the FRP plank and the other control had infernal steel reinforcing bars instead of the FRP plank. The beams were loaded by central patch load to their ultimate capacity. The experimental results were compared to current ACI 318 (2005) and ACI 440 (2006) code predictions. This study demonstrates that the FRP plank has the potential to serve as formwork and reinforcing for concrete structures.

A Time Slot Allocation Method of UWB Distributed MAC Protocol for Fair QoS Provisionings to High Speed Multimedia Services in Wireless Home Networks (무선 홈 네트워크에서 고속 멀티미디어 서비스의 Fair QoS 제공을 위한 UWB Distributed MAC 프로토콜의 타임 슬롯 할당 방안)

  • Hur, Kyeong;Sohn, Won-Sung
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.3
    • /
    • pp.419-426
    • /
    • 2009
  • The WiMedia Alliance has specified a Distributed Medium Access Control (D-MAC) protocol based on UWB for high speed wireless home networks and WPANs. The WiMedia D-MAC fundamentally removes the problems of the centralized MAC revealed at IEEE 802.15.3 MAC, by adopting a distributed architecture. However, there is no completely distributed method for allocating fair data rates to all traffic streams by considering each stream's QoS parameter. In this paper, a novel fair distributed QoS admission control method is proposed. The proposed method is a fair, adaptive QoS provisioning method, by allocating time slots to devices according to the current traffic load condition, through executing only a proposed single satisfaction of QoS (SoQ) algorithm at each device.

  • PDF