• Title/Summary/Keyword: Link-up operation

Search Result 62, Processing Time 0.025 seconds

Start-Up Current Control Method for Three-Phase PWM Rectifiers with a Low Initial DC-Link Voltage

  • Gu, Bon-Gwan;Choi, Jun-Hyuk;Jung, In-Soung
    • Journal of Power Electronics
    • /
    • 제12권4호
    • /
    • pp.587-594
    • /
    • 2012
  • When a PWM rectifier has a low DC-link voltage during startup, the output voltage vector cannot be high enough to regulate the input current. This lack of a PWM rectifier output voltage vector can cause an unregulated inrush current when the rectifier operation starts. This paper presents a PWM rectifier start-up current control algorithm for when it starts operation with a lower DC-link voltage than unloaded condition case. To avoid the unregulated inrush current caused by a lack of DC-link voltage, the proposed control scheme regulates the one phase current with one switch chopping and it generates the current command considering the uncontrolled current magnitude information, which is calculated in advance. Simulation and experiment results support the validity of the proposed method.

The Program Development for Real-Time Monitoring And Control of RF Output

  • Shin, Gang-wook;Hong, Sung-Tak;Yang, Jae-Rheen
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.69.6-69
    • /
    • 2001
  • The SSPA makes the power level of EIRP up to 16W, and compensates for temperature to the SSPA´s maximum stability. The up and the down converters are dually conversed like as individual synthesizers for selecting of independent transmit-receive transponder. The function of the up-converter is to convert the 70MHz IF signal modulated in the indoor unit modem into a 14.0 ∼ 14.5 GHz Ku-band up-link signal to be sent to the antenna. The down-converter converts the 12.25 ∼ 12.75 GHz Ku-band down-link signal or a trouble malfunction of SSPA may be a fatal factor to operation of the whole satellite communication network. Therefore, this study developed the remote monitoring and control program to monitor the SSPA´s status before the problem occurs for stable operation of the system. This software ...

  • PDF

Link-16 기반의 효율적인 공대지 항공작전 모델 설계 (Establishment for Efficiency Air-To-Ground Air Operation Model in Link-16)

  • 이형헌;장형준;김영구;임재성
    • 한국군사과학기술학회지
    • /
    • 제13권5호
    • /
    • pp.861-868
    • /
    • 2010
  • As CAS, X-ATK, and INT models considered as the most typical Air-to-Ground operation models in ROKAF are mainly designed as the voice-centered system between aircraft and ground control facilities, it is critical to newly develop the Link-16 based model for the ROK-US combined operation between F-15K, AWACS, M-SAM, and KDX-III equipped with Link-16. Former studies had been limited to the CAS operation, and they had mainly focused on reducing the voice transmission time to exchange the information between each mission step with maintaining existing operation steps. Therefore, this paper makes up the weak point in former studies, thereby designing new Air-to-Ground operation model for CAS, X-ATK, INT mission using Enterprise Architecture OV6c, which enables both aircraft and ground control facilities or between aircraft to obtain the real-time information on the location, identification, armament and the real-time image data through the broadcasting function. Based on the analysis of new operation model, we come to a conclusion that by simultaneously exchanging the information on mission between nodes concerned through the broadcasting function of Link-16. It is possible to cut down superfluous steps among the mission steps, and to reduce the mission time. It is clear that it gives rise to improve the battle efficiency and the decision-making tempo as well as the battlefield situational awareness.

Phase Shift Control for Series Active Voltage Quality Regulators

  • Xiao, Guochun;Teng, Guofei;Chen, Beihai;Zhang, Jixu
    • Journal of Power Electronics
    • /
    • 제12권4호
    • /
    • pp.664-676
    • /
    • 2012
  • A phase shift algorithm based on the closed-loop control of dc-link voltage implemented on a series active voltage quality regulator (AVQR) is proposed in this paper. To avoid pumping-up the dc-link voltage, a general phase shift compensation strategy is applied. The relationships among the operation variables are discussed in detail, which is very important for guiding the design of both the main circuit and the control system. Then on the basis of an investigation of the dc-link voltage pumping-up from viewpoint of the active power flow, a novel phase shift control method based on the closed-loop of the dc-link voltage is proposed. This method can adjust the phase of the output voltage gradually and automatically according to the dc-link voltage variation without introducing a phase jump. The effectiveness of the proposed strategy is verified through simulations of a single-phase 5kVA prototype and laboratory experiments on both a single-phase 5kVA and a three-phase 15kVA prototype.

cdma2000 Physical Layer: An overview

  • Willenegger, Serge
    • Journal of Communications and Networks
    • /
    • 제2권1호
    • /
    • pp.5-17
    • /
    • 2000
  • cdma2000 offers several enhancement as compared to TIA/EIA-95, although it remains fully compatible with TIA/EIA-95 systems and allows for a smooth migration from one to the other-Major new capability include:1)connectivity to GSM-MAP in addition to IP and IS-41 networks; 2) new layering with new LAC and MAC architectures for improved service multiplexing and QoS management and efficient use of radio resource ;3) new bands and band widths of operation in support of various operator need and constraints, as well as desire for a smooth and progressive migration to cdma 2000; and 4) flexible channel structure in support of multiple services with various QoS and variable transmission rates at up to 1 Mbps per channel and 2 Mbps per user. Given the phenomenal success of wireless services and desire for higher rate wireless services. improved spectrum efficiency was a major design goal in the elaboration of cdma2000. Major capacity enhancing features include; 1) turbo coding for data transmission: 2)fast forward link power control :3) forward link transmit diversity; 4) support of directive antenna transmission techniques; 5) coherent reverse link structure; and 6) enhanced access channel operation. As users increasingly rely on their cell phone at work and at home for voice and data exchange, the stand-by time and operation-time are essential parameters that can influence customer's satisfaction and service utilization. Another major goal of cdma2000 was therefore to enable manufacturers to further optimize power utilization in the terminal. Major battery life enhancing features include; 1) improved reverse link performance (i.e., reduced transmit power per information bit; 2) new common channel structure and operation ;3) quick paging channel operation; 4) reverse link gated transmission ; and 5) new MAC stated for efficient and ubiquitous idle time idle time operation. this article provides additional details on those enhancements. The intent is not to duplicate the detailed cdma2000 radio access network specification, but rather to provide some background on the new features of cdma2000 and on the qualitative improvements as compared to the TIA/EIA-95 based systems. The article is focused on the physical layer structure and associated procedures. It therefore does not cover the MAC, LAC, radio resource management [1], or any other signaling protocols in any detail. We assume some familiarity with the basic CDMA concepts used in TIA/EIA-95.

  • PDF

큐브위성 STEP Cube Lab.의 지상국 시스템 설계 (Design of Ground Station System for CubeSat STEP Cube Lab.)

  • 전영현;채봉건;정현모;전성용;오현웅
    • 항공우주시스템공학회지
    • /
    • 제6권4호
    • /
    • pp.34-39
    • /
    • 2012
  • CubeSats classified as pico-class satellite require a ground station to track the satellite, transmit a command, and receive an on-orbit data such as SOH (State-of-Health) and mission data according to the operation plan. For this, ground station system has to be properly designed to perform a communication to with the satellite with enough up- and down-link budgets. In this study, a conceptual design of the ground station has been performed for the CubeSat named as STEP Cube Lab. (Cube Laboratory for Space Technology Experimental Project). The paper includes a ground station hardware interface design, link budget analysis and a ground station software realization. In addition, the operation plan of the ground station has been established considering the STEP Cube Lab. mission requirements.

지상작전의 원칙 측면에서 미 제1해병사단의 장진호 연결작전 고찰 (From the point of view of ground operations principle, Chosin Link-up operation discussion of the US 1st Marine Division)

  • 김규빈;최영렬
    • 안보군사학연구
    • /
    • 통권13호
    • /
    • pp.1-41
    • /
    • 2016
  • US 8th Army in the attack on the Western Front was a situation that was frustrated by the 13th Corps Communist army. To this time support this, goals that have been granted to the US 1st Marine Division that initiated the attack in Mupyonri direction, lack the potential to achieve was not decisive. It was a operation specific erroneous judgment that occurred because there was no one accurately grasp the battlefield of the situation the wrong UN Forces Command. Tactical victory can be to maximize the operation outcomes. However, there is no possible failure of the operation is to expand the tactical success. This is because the failure of the operation, because directly linked to the success or failure of the war. Tactical victory can be to maximize the operation outcomes. However, operation specific failure is not it possible to expand the tactical victory. Therefore tactical success of the US 1st Marine Division, can not compensate for operation specific failure of the United Nations Forces Command. However, Chinese Communist Army 9th Corps is obsessed only victory of tactics to annihilate the US 1st Marine Division, by being fixation to the Chosin whole area, it was not possible to run a operational operation. Therefore tactical success df the US 1st Marine Division, Chinese Communist Army 9th Corps is to extinguish the ability to increase the number of the 13th Corps of the Western Front, 8th Army US have contributed to have escaped the crisis. In addition, the US 10th Corps while maintaining the combat force, by an important role to withdraw through the sea, was able to complement the misjudgment of the operation.

  • PDF

단일 구동부를 갖는 2축 회전형 진자의 스윙업 제어 (Swing-Up Control of a Two-Link Pendulum with One Actuator)

  • 양동훈;유기정;홍석교
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2467-2469
    • /
    • 2001
  • A strategy for the swing-up and stabilization control method for a two-links rotational pendulum according to states of each link of the rotational pendulum is proposed. The proposed controller consists of two modes of control such as divergence mode and stabilization mode. When the controller is in divergence mode, control input is generated using sinusoidal function, which is developed based on resonance period of the pendulum in linear region, to make the second link (pendulum) reach top position. After the controller finishes operation in divergence mode, stabilization control is initiated to keep the pendulum around the top position using pole placement control method. Experimental results are given to show the effectiveness of the proposed method.

  • PDF

버스정보시스템(BIS) 운행자료를 이용한 링크통행시간 추정 (A Study on Estimate to Link Travel Time Using Traveling Data of Bus Information System)

  • 이영우
    • 대한토목학회논문집
    • /
    • 제30권3D호
    • /
    • pp.241-246
    • /
    • 2010
  • 본 연구는 버스정보시스템(BIS)의 운영을 통해 수집되고 있는 데이터를 이용하여 도시내 가로의 통행시간을 추정하기 위한 연구이다. 기존의 버스시스템에 첨단정보통신 기술을 접목한 BIS는 많은 지방자치단체에서 구축하여 운영 중에 있다. 그러나 이러한 기술동향을 반영한 연구는 부족한 실정이다. 기존에 구축된 BIS의 운영을 통해 유용한 교통정보들이 수집되고 있으나 수집된 데이터의 활용은 활발히 이루어지지 못하고 있다. 본 연구에서는 BIS의 운영을 통해 수집되고 있는 버스운행 데이터를 이용하여 도시내 가로의 링크통행시간 추정을 통해 도시의 교통관리에 활용하고 운전자에게 교통정보를 제공하기 위한 기초적인 연구를 수행하고자 하였다. 연구결과 버스의 링크통행시간이 두 개의 군집으로 나타났으며 따라서 링크통행시간을 두 개의 군집으로 나누어 추정모형을 구축하였다. 구축된 모형을 통계적으로 검정하기 위해 T-test를 실시한 결과 통계적으로 유의한 것으로 분석되었다.

정지궤도 위성통신 환경모의를 위한 100 MHz 대역폭의 위성링크 시뮬레이터 개발 (Satellite Link Simulator Development in 100 MHz Bandwidth to Simulate Satellite Communication Environment in the Geostationary Orbit)

  • 이성재;김용선;한태균
    • 한국군사과학기술학회지
    • /
    • 제14권5호
    • /
    • pp.842-849
    • /
    • 2011
  • The transponder simulator designed to simulate the transponder of military satellite communication systems in the geostationary orbit is required to have time delay function, because of 250 ms delay time, when a radio wave transmits the distance of 36,000 km in free space. But, it is very difficult to develop 250 ms time delay device in the transponder simulator of 100 MHz bandwidth, due to unstable operation of FPGA, loss of memory data for the high speed rate signal processing. Up to date, bandwidth of the time delay device is limited to 45 MHz bandwidth. To solve this problem, we propose the new time delay techniques up to 100 MHz bandwidth without data loss. Proposed techniques are the low speed down scaling and high speed up scaling methods to read and write the external memory, and the matrix structure design of FPGA memory to treat data as high speed rate. We developed the satellite link simulator in 100 MHz bandwidth using the proposed new time delay techniques, implemented to the transponder simulator and verified the function of 265 ms time delay device in 100 MHz bandwidth.