• 제목/요약/키워드: Lining thickness

검색결과 134건 처리시간 0.023초

수치해석에 의한 터널 복공의 역학적 거동 및 균열 특성에 관한 연구 (On Mechanical Behavior and Cracking Characteristics of Tunnel Lining by Numerical Analysis)

  • 이대혁;김재순;이희근;김성운
    • 터널과지하공간
    • /
    • 제8권2호
    • /
    • pp.146-156
    • /
    • 1998
  • Nemerical algorithms were developed to analyze the behavior of the double lining as well as ground mass separately or simultaneously. A lining interface element was especially developed, verified and applied to the study on the coupled interaction of shotcrete and the concrete lining. It could be known fro parameter studys on double lining support systems that as the contact surface between shotcrete and concrete lining was rougher, the more decreased bearing capacity against the cracking of the system. If the thickness of the shotcrete increased, the bearing capacity of the double lining also increased linearly with the thickness. If the thickness of the concrete lining increased, the bearing capacity of the double lining had the relationship of the characteristic S-shape of a sigmoid function with the thickness. When the thickness increased over a given value, it was not useful to increase more the thickness because bearing capacity had no remarkable change. It could be concluded that the behavior of the shotcrete and concrete lining was generally reversed before and after the ratio of horizontal to vertical earth preassure of 1.0 and 0.5 respectively. Therefore, we could guess that the movement which two shotcrete and concrete lining deflect toward each other around the crown caused a friction between two linings and thus this disadvantageous effect could contribute to reducing the bearing capacity against the cracking.

  • PDF

GPR탐사를 통한 NATM터널(무근)라이닝의 두께 분포 및 배면상태 평가 (Assessment of NATM tunnel lining thickness and its behind state utilizing GPR survey)

  • 추진호;유창균;오영철;이인모
    • 한국터널지하공간학회 논문집
    • /
    • 제21권5호
    • /
    • pp.717-733
    • /
    • 2019
  • 본 연구에서는 3개의 공용중인 NATM터널에서 수행된 정밀안전진단 GPR탐사 결과로 라이닝 두께분포 및 배면상태 특성을 분석하였다. 라이닝 천장에서 실시한 GPR 자료분석으로 라이닝 콘크리트와 1차지보재 사이에 공간이 대부분 존재하는 것으로 분석되었다. 다수의 라이닝 종단탐사로 분석된 횡단 두께의 좌 우 불균형은 8.6~253.5 mm로 확인되었으며 급격한 두께편차 주변에서 종방향균열 발생을 확인하였다. 라이닝 천단 중앙에서 실시된 종단 두께 분포는 3개의 적합도 검증을 통해 터널별 최적의 분포함수가 선정되었다. 종방향 라이닝 두께의 평균이 설계기준 이상인 경우 정규분포 및 이와 유사한 분포 특성을 나타내고 있으며, 설계두께 이하의 터널에서는 Gamma, Inverse Gauss분포함수가 해당터널의 라이닝을 대표하기 위한 최적함수로 적합할 것으로 판단하였다. NATM터널(무근) 라이닝의 두께분포는 터널의 상태평가 및 안전성평가를 전반적으로 분석하기 위한 중요한 지표가 될 수 있으며, 향후 기존의 일정한 설계 두께를 적용하기 보다는 GPR탐사를 반영한 라이닝의 현실적인 평가 방법의 연구가 필요할 것으로 판단된다.

충격반향시험에 의한 콘크리트 터널 라이닝 내부결함 및 두께 조사 (Inspection for Internal Flaw and Thickness of Concrete Tunnel Lining Using Impact Echo Test)

  • 김영근;이용호;정한중
    • 터널과지하공간
    • /
    • 제7권3호
    • /
    • pp.230-237
    • /
    • 1997
  • As concrete structure is getting old and decrepit, its inspection and diagnosis is getting important. Therefore, it is necessary to estimate the soundness of structure using non-destructive tests for effective repairs and maintenances. But, applications of non-destructive tests in tunnel have been used restrictively, due to accessibility only from one side in tunnel lining and presence of tunnel installations. Recently, the various non-destructive techniques have been studied. Especially, ground penetrating radar(GPR) and impact echo (IE) methods have been researched for tunnel inspection. In this study, the applicability of impact echo test in tunnel lining inspection has been investigated. This paper described the tunnel inspection for lining thickness and internal flaw using impact echo tests. Model tests were carried out using impact echo test systems on two concrete models, Model I is measuring for lining thickness, Model II is detecting for internal flaw. Also, the test were applied for lining inspections in a tunnel constructed by NATM. From the results of impact echo tests, we have concluded that impact echo test is a very useful and effective technique for inspecting the concrete tunnel linings.

  • PDF

지하레이다(GPR)를 이용한 터널 라이닝 비파괴시험에 관한 연구 (Non-Destructive Test for Tunnel Lining Using Ground Penetrating Radar)

  • 김영근;이용호;정한중;신상범;조철현
    • 터널과지하공간
    • /
    • 제7권4호
    • /
    • pp.274-283
    • /
    • 1997
  • It is necessary to estimate the soundness of tunnel using non-destructive tests(NDT) for effective repairs and maintenances. But, the state of tunnel lining could not be investigated using previous non-destructive techniques, due to the various types of support and accessibility only from one side in tunnel lining. Recently, the various non-destructive techniques such as ground penetrating radar(GPR) have been researched and developed for inspection of tunnel lining. In this study, the usefulness and applicability of GPR test in tunnel lining inspection has been investigated through model tests and tunnel site application. This paper described the tunnel lining inspection for lining thickness, cavity and support using GPR test. From the results of tests, we have concluded that GPR test are very useful and effective techniques to look into the interior of lining and measure the lining thickness.

  • PDF

터널 건전도 평가를 위한 라이닝 모델실험 (Model Test of Lining for Estimation of Tunnel Soundness)

  • 김영근
    • 자연, 터널 그리고 지하공간
    • /
    • 제1권2호
    • /
    • pp.59-71
    • /
    • 1999
  • Recently, many deformations in tunnel such as crack and leakage were occulted. Specially, the defects of tunnel lining have been a serious problem in safety and stability many repair works for maintenance in tunnel have been carried out. Therefore, it is necessary to estimate the structural cracking for countermeasure in deformed tunnel and to investigate on the characteristics of lining system and the soundness of tunnel. In this study model tests for tunnel lining were carried out using test apparatus and centrifuge, In the direct loading test, the prototype was Kyungbu high-speed railway tunnel and the scale is 1/10, and lining models were made of concrete. Test conditions included load conditions such as direction, shape and type, lining conditions such as single and double lining, thickness, and reinforcement. In centrifuge model test, the prototype was Seoul subway tunnel and the scale is 1/100, and lining models were made of aluminum and hydrostone. Test conditions included tunnel defects such as thickness shortage. behind cavity and longitudinal cracks, reinforcement methods such as epoxy, grouting and carbon sheet. From these model tests , the characteristics of deformation and failure for tunnel lining were estimated, and the structural behaviors of deformed lining and the effects of repair and reinforcement for tunnel lining were researched.

  • PDF

Hydro-mechanical coupling algorithm of reinforced concrete lining in hydraulic pressure tunnel using cohesive elements

  • Li Zhou;Kai Su;Ding-wei Liu;Yin-quan Li;Hong-ze Zhu
    • Structural Engineering and Mechanics
    • /
    • 제86권1호
    • /
    • pp.139-156
    • /
    • 2023
  • The reinforced concrete lining in the hydraulic pressure tunnel tends to crack during the water-filling process. The lining will be detached from the surrounding rock due to the inner water exosmosis along concrete cracks. From the previous research achievements, the cohesive element is widely adopted to simulate the concrete crack but rarely adopted to simulate the lining-rock interface. In this study, the zero-thickness cohesive element with hydro-mechanical coupling property is not only employed to simulate the traditional concrete crack, but also innovatively introduced to simulate the lining-rock interface. Combined with the indirect-coupled method, the hydro-mechanical coupling algorithm of the reinforced concrete lining in hydraulic pressure tunnels is proposed and implemented in the finite element code ABAQUS. The calculated results reveal the cracking mechanism of the reinforced concrete lining, and match well with the observed engineering phenomenon.

Fracture behaviors of tunnel lining caused by multi-factors: A case study

  • Zhao, Yiding;Zhang, Yongxing;Yang, Junsheng
    • Advances in concrete construction
    • /
    • 제8권4호
    • /
    • pp.269-276
    • /
    • 2019
  • The cracking and spalling caused by fracture of concrete lining have adverse impacts on serviceability and durability of the tunnel, and the subsequent maintenance work for damaged structure needs to be specific to the damaging causes. In this paper, a particular case study of an operational tunnel structure is presented for the serious cracking and spalling behaviours of concrete lining, focusing on the multi-factors inducing lining failure. An integrated field investigation is implemented to characterize the spatial distribution of damages and detailed site situations. According to results of nondestructive inspection, insufficient lining thickness and cavity behind lining are the coupled-inducement of lining failure bahaviors. To further understanding of the lining structure performance influenced by these multiple construction deficiencies, a reliable numerical simulation based on extended finite element method (XFEM) is performed by using the finite element software. The numerical model with 112 m longitudinal calculation, 100 m vertical calculation and 43 m vertical depth, and the concrete lining with 1450 solid elements are set enrichment shape function for the aim of simulating cracking behavior. The numerical simulation responses are essentially in accordance with the actual lining damaging forms, especially including a complete evolutionary process of lining spalling. This work demonstrates that the serious lining damaging behaviors are directly caused by a combination of insufficient thickness lining and cavity around the surrounding rocks. Ultimately, specific maintenance work is design based on the construction deficiencies, and that is confirmed as an efficient, time-saving and safe maintenance method in the operational railway tunnel.

18세기 서화유물 배접지의 특성(제1보) - 배접지의 원지 특성 및 해부학적 특성 - (Characteristics of the Lining Papers Separated from the 18th Century Paintings and Calligraphic Works (Part 1) - Physical and Morphological Properties of Lining Papers -)

  • 정희원;이상현;천주현;최태호
    • 펄프종이기술
    • /
    • 제44권3호
    • /
    • pp.22-33
    • /
    • 2012
  • This study was carried out to investigate the characteristics of the lining papers which had been separated from six pieces of paintings and calligraphic works of the 18th and the 20th century. A total 20 kinds of lining papers were examined on the physical properties, colors, fiber morphology, and color reactions. The grammage and thickness of lining papers which had been used hanging-scroll type works were higher than those of folder types. On the other hand, the grammage and thickness of the first layer lining papers which had been separated from silk ground works were lower than those of paper ground works. All kinds of lining papers were colored from yellow to yellowish red because of unbleaching and deterioration. Through the examination on fiber morphology and color reactions, lining papers were verified that all of those were made from paper mulberry bast fiber but the first layer of the Mukjukdo. The lining paper which of the first layer of the Mukjukdo was verified that it was made from mixture of paper mulberry, hemp, and spruce pulps.

GPR 및 단일채널 탄성파탐사에 의한 터널라이닝 배면공동 조사 (Detection of the Cavity Behind the Tunnel Lining by Single Channel Seismic and GPR Method)

  • 신성렬;조철현;신창수;양승진;장원일
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권4호
    • /
    • pp.148-158
    • /
    • 1998
  • Determining the thickness if concrete lining and detecting of the cavity where is located behind tunnel lining plays an important role in the safety diagnosis of tunnel structure and the quality control. In this study, we made use of GPR and seismic method in order to find the cavity or flaw. Although GPR is very useful method in the concrete lining without rebar, it is difficult to detect the cavity in the reinforced concrete lining. We applied mini-seismic method to the reinforced concrete lining. The obtained seismic data was processed by means of seismic section in time domain and image section of power spectrum in frequency domain using Impact-Echo method as well. The proposed method can accurately show the location and depth of the cavity in the reinforced concrete lining.

  • PDF

유리섬유를 이용한 하수관의 고강도 현장경화 비굴착 보수 공법 재료의 개발 및 물성 특성 연구 (Study of structural properties and development of high strength Cured-In-Place Pipe (CIPP) liner for sewer pipes using glass fiber)

  • 지현욱;;유성수;강정희
    • 상하수도학회지
    • /
    • 제34권2호
    • /
    • pp.149-159
    • /
    • 2020
  • Cured-in-place-pipe(CIPP) is the most adopted trenchless application for sewer rehabilitation to extend the life of the existing sewer without compromising both direct construction and indirect social costs especially applied in the congested urban area. This technology is globally and domestically known to be the most suitable for partial and full deteriorated pipe structure rehabilitation in a sewer system. The typical design of CIPP requires a significant thickness of lining to support loading causing sewage flow interruption and increasing material cost. This paper presents development of a high strength glass fiber composite lining material for the CIPP application and structural test results. The test results exhibit that the new glass fiber composite lining material has 12 times of flexural strength, 6.2 times of flexural modulus, and 0.5 Creep Retention Factor. These test results can reduce lining design thickness 35% at minimum. Even though taking into consideration extra materials such as outer and inner films for actual field applications, the structural capacity of the composite material significantly increases and it reduces 20 percent or more line thickness as compared to the conventional CIPP. We expect that the newly developed CIPP lining material lowers material costs and minimizes flow capacity reduction, and fully replaceable to the conventional CIPP lining materials.