• Title/Summary/Keyword: Lifting factor

Search Result 86, Processing Time 0.019 seconds

An Implementation of Workload Measurement by Lifting Index

  • Kim, Dae-Sik
    • Journal of Industrial Convergence
    • /
    • v.1 no.2
    • /
    • pp.17-31
    • /
    • 2003
  • Many risk factors with the onset of Low Back Pain(LBP) have been identified, however, lifting out of Manual Material Handling(MMH) was the most important factor to the LBP. Injuries due to lifting took account for 34.0%(227,291) out of the total overexertion in MMH(668,084). The weight, vertical location, twist angle, lifting frequency, and lifting posture were reviewed in this study. Technical information for using the revised lifting equation to evaluate a variety of two - handled manual material handling tasks was suggested. To measure worker's fatigue in lifting task, Lifting Index Simulator(LIS) was create under the revised NIOSH(National Institute for Occupational Safety and Health) lifting equation. For the implementation of the LIS, data was collected in A company manufactures various paints in Si-Wha industrial complex, Kyunggi-Do. The results of the Lifting Index(LI) were analyzed by MANOVA to find the relation with lifting variables collected. It was found that horizontal distance, vertical distance, travelling distance and frequency were significant at the 0.01 level and weight was significant at the 0.05 level. The purpose of this paper is to reduce the chronical low back pain for the manual material handlers.

  • PDF

Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction (초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델)

  • Nam, Chulu;Kwon, Jaebeom;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

양력선 이론을 이용한 EDISON CFD 해석자의 검증

  • Kim, Tae-Hui
    • Proceeding of EDISON Challenge
    • /
    • 2016.11a
    • /
    • pp.101-105
    • /
    • 2016
  • Prandtl's Lifting-line theory is the classical theory of calculating aerodynamic properties. Though it is classical method, it predicts the aerodynamic properties well. By lifting-line theory, high aspect ratio is critical factor to decrease induced drag. And 'elliptic-similar' wing also makes the minimum induced drag. But due to the problem of manufacturing, tapered wing is preferred and have been utilized. In this Paper, by using Edison CFD, verifying the classical lifting-line theory. To consider induced drag only, using Euler equation as governing equation instead of full Navier-Stokes equation. Refer to the theory, optimum taper ratio which makes the minimum induced drag is 0.3. Utilizing the CFD results, plotting oswald factor over various taper ratio and investigating whether the consequences are valid or not. As a result, solving Euler equation by EDISON CFD cannot guarantee the theoretical values because it is hard to set the proper grid to solve. Results are divided into two cases. One is the values are decreased gradually and another seems to following tendency, but values are all negative number.

  • PDF

Occupational Lifting Tasks and Retinal Detachment in Non-Myopics and Myopics: Extended Analysis of a Case-Control Study

  • Mattioli, Stefano;Curti, Stefania;De Fazio, Rocco;Mt Cooke, Robin;Zanardi, Francesca;Bonfiglioli, Roberta;Farioli, Andrea;Violante, Francesco S.
    • Safety and Health at Work
    • /
    • v.3 no.1
    • /
    • pp.52-57
    • /
    • 2012
  • Objectives: Lifting heavy weights involves the Valsalva manoeuvre, which leads to intraocular pressure spikes. We used data from a case-control study to further investigate the hypothesis that occupational lifting is a risk factor for retinal detachment. Methods: The study population included 48 cases (patients operated for retinal detachment) and 84 controls (outpatients attending an eye clinic). The odds ratios (OR) of idiopathic retinal detachment were estimated with a logistic regression model (adjusted for age, sex and body mass index). Three indexes were used to examine exposure to lifting; 1) maximum load lifted, 2) average weekly lifting, 3) lifelong cumulative lifting. Results: For all indexes, the most exposed subjects showed an increased risk of retinal detachment compared with the unexposed (index 1: OR 3.57, 95% confidence interval [CI] 1.21-10.48; index 2: OR 3.24, 95% CI 1.32-7.97; index 3: OR 2.23, 95% CI 1.27-8.74) and dose-response relationships were apparent. Conclusion: These results reinforce the hypothesis that heavy occupational lifting may be a relevant risk factor for retinal detachment.

A Study on the Safety of Lifting Cable for Construction of Coastal Structures (항만건설을 위한 케이슨 들고리의 안전성에 관한 연구)

  • Kwak, Kae Hwan;Jang, Ki Woong;Kim, Jong Hyo
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.1 s.34
    • /
    • pp.85-99
    • /
    • 1998
  • This paper describes an experimental study to examine collapse causes of the lifting cable due to brittle failure of an fitting anchor under the lifting works. Also, in this study an collapse mechanism that was obtained from stress analysis was compared with an actual collapse procedure. Fractographical analysis as well as chemical component test, tension test and Charpy V-Notch impact test for the fractured steel members were carried out. And then, its results were compared with that of normal steel members. Circumferential surface flaws were developed at internal facets of the fitting anchor before tensile stress occurred. Hence, a higher stress than nominal stress was occurred at flaws by stress concentration at the crack tip. Also, stress intensity factor of members increased by crack size of the potential flaws. Because the stress intensity factor at the crack tip was greater than critical values(fracture toughness), brittle fracture occurred under the lifting works. It is judged that the main collapse of the lifting cable is due to brittle fracture of the fitting anchor.

  • PDF

Finitely Generated Modules over Semilocal Rings and Characterizations of (Semi-)Perfect Rings

  • Chang, Chae-Hoon
    • Kyungpook Mathematical Journal
    • /
    • v.48 no.1
    • /
    • pp.143-154
    • /
    • 2008
  • Lomp [9] has studied finitely generated projective modules over semilocal rings. He obtained the following: finitely generated projective modules over semilocal rings are semilocal. We shall give necessary and sufficient conditions for finitely generated modules to be semilocal modules. By using a lifting property, we also give characterizations of right perfect (semiperfect) rings. Our main results can be summarized as follows: (1) Let M be a finitely generated module. Then M has finite hollow dimension if and only if M is weakly supplemented if and only if M is semilocal. (2) A ring R is right perfect if and only if every flat right R-module is lifting and every right R-module has a flat cover if and only if every quasi-projective right R-module is lifting. (3) A ring R is semiperfect if and only if every finitely generated flat right R-module is lifting if and only if RR satisfies the lifting property for simple factor modules.

Free Surface Procedure for Lifting Operation by Parallel Connected Floating Cranes using Synchronized Operation System and Its Applications to Lifting Operations of a Heavy Cargo (동조 시스템을 적용한 다수대의 해상크레인 병렬 운용 절차 및 대형 중량물의 리프팅 작업 적용)

  • Hwang, Jin-Ho;Ahn, Jeong-Ik;Lee, Soo-Bae;Kim, Yun-Ho;Choung, Jin-Sik;Ham, Seung-Ho;Lee, Won-Joon
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.97-106
    • /
    • 2009
  • Many production methods are tried to enhance the productivity efficiency. Parallel connected floating cranes are one of the examples to lift mega-blocks quickly and efficiently. However, a general operation manual to operate parallel connected floating cranes and a method to consider risks during lifting operation are not confirmed. And if each floating crane is operated by itself, it is very hard to cooperate. Therefore, Synchronized operation system is installed to control parallel connected floating cranes simultaneously and to be informed of each floating cranes data. And weighting factor is calculated by considering all hazards during the operation and the general operation manual is confirmed based on the factor. This paper introduces the procedure for lifting operations by parallel Connected Floating Cranes using synchronized operation system, and its applications to lifting operation of a heavy cargo such as barge lifting test, floating dock installation and 900 ton goliath crane replacement operation, etc.

  • PDF

An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project (초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석)

  • Kim, Nam-Gyun;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.73-83
    • /
    • 2013
  • Recently, not only around Korea but also other countries shows a pattern of arising high-rise building construction project which was delayed or aborted during global economic crises and recession. Although the market starts to stretch, It is getting competitive to win a contract in high-rise construction project between contractors due to lack of competitive advantage especially to Korea contractors. To get that, Korean contractors needs lifting equipment plan. But currently, they depend on the empirical methods and that cause schedule delay, not controlled cost management problem. Therefore, this research is to improve the accuracy of Lifting plan by analyzing the current issues of Lifting plan system and deducing the types of failures with planning factors, as well as analyzing the impact on schedule and cost control and safety management by each failure mode. Also, by analyzing detail risk factors per Lifting Equipment with FMEA, to infer the critical risk factor on high-rise construction project.

Revised NIOSH lifting equation의 현장 적용

  • 기도형;정민근;임종호
    • Proceedings of the ESK Conference
    • /
    • 1995.04a
    • /
    • pp.106-110
    • /
    • 1995
  • A local manufacturing companyin which low back pain(LBP) complaints were frequently reported was selected, and regularly perfomed lifting tasks were investigated using questionnaires and the 1991 NIOSH lifting guide. Among several processes of manufacture in the company, three processes-forming, heating and packing-were studied, where most of tasks were perfomed through manual materials handling (MMH). Questionnaire surveys showed that anthropometric data such as stature, weight and someatotype did not affect and weight of load influenced significantly the incidence of LBP, and workers who expwrienced LBP was older than the inexperienced. In addition, safety education conducted at the company was found to be ineffective in preventing LBP injuries. Lifting indexes(LI) was ranged from 0.86 to 17.0 with an average of 4.49, which revealed that tasks performing in the selected factory were in danger of LBP, and should be ertonomically redesigned. The critical factor reducing LI was found to be the horizontal component in all three processes, and most of weight of load was heavier than load constant(23kg) of the 1991 NIOSH lifting equation in heating process and packing.

  • PDF

On the Preliminary Design of Marine Propellers by Lifting Line Theory (양력선(揚力線) 이론(理論)에 의한 추진기(推進器) 초기설계(初期設計)에 대하여)

  • Jin-Tae,Lee;Zae-Geun,Kim;Chang-Sup,Lee
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.17 no.3
    • /
    • pp.5-17
    • /
    • 1980
  • A basic procedure to design marine propellers by a curved lifting line theory was shown. By adapting discrete singularity method, it became possible to take into account of skew, rake and the contraction of slip stream in the early stage of preliminary design procedure. It is also shown that lifting line theory based on the discrete singularity method converges to a common solution obtained by induction factor method with a relatively small number of discrete elements. Lifting the blade geometry more accurately on the basis of hydrodynamic principles. A number of numerical results from lifting line calculation are presented for the purpose of comparison with the previous method, and with these results two sample designs are carried out, which are wake-adapted optimum and wake-adapted non-optimum propellers.

  • PDF