• Title/Summary/Keyword: Lifting Equipment

Search Result 87, Processing Time 0.027 seconds

Implementation of Human Positioning Monitoring Device for Underwater Safety (수중안전을 위한 인체 위치추적 모니터링 장치 구현)

  • Jong-Hwa Yoon;Dal-Hwan Yoon
    • Journal of IKEEE
    • /
    • v.27 no.3
    • /
    • pp.225-233
    • /
    • 2023
  • This paper implements a system that monitors human body lifting information in the event of a marine accident. The monitoring system performs ultrasonic communication through a lifting device controller that transmits underwater environment information, and LoRa communication is performed on the water to provide GPS information within 10 km to the control center or mother ship. The underwater lifting controller transmits pneumatic sensor, gyro sensor, and temperature sensor information. In an environment where the underwater conditions increase by one atmosphere of water pressure every 10m in depth, and the amount of air in the instrument decreases by half compared to land, a model of a 60kg underwater mannequin is used. Using one 38g CO2 cartridge in the lifting appliance SMB(Surface Maker Buoy), carry out a lifting appliance discharge test based on the water level rise conditions within 10 sec. Underwater communication constitutes a data transmission environment using a 2,400-bps ultrasonic sensor from a depth of 40m to 100m. The monitoring signal aims to ensure the safety and safe human structure of the salvage worker by providing water depth, water temperature, and directional angle to rescue workers on the surface of the water.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

Efficiency Analysis of Tower Crane Lifting Work for Project Management of Construction (건축공사의 공정관리를 위한 타워크레인 양중 효율성 분석)

  • Bae, Jeong-Hyeon;Kim, Ki-Hyuk;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.63-69
    • /
    • 2019
  • Building Construction projects are getting higher and larger. Therefore, the use of Tower Crane, which is more productive than any other lifting plan shows a trend of continuous increases. However as equipment for transporting heavy goods, are is too expensive for the monthly rent and used inefficiently for construction. site so it is analyzed that it has problems of reducing productivity and efficiency of lifting work. Inefficient situations are arising like poor communications between operator and worker, occurrence of blind spots, securing the shortest distance of fire during movement after lifting plan, influences of weather, location of materials, movement radius of tower crane by each locations and ever-changing working environments. Therefore, in this study, we first made a list of tower cranes that are inefficiently used at the site, and then we made a checklist. After that, through field visits, we derived checklist for Tower Crane to comprehensive data value.

Tower Crane Foundation Design and Stability Review Model (타워크레인 기초설계 및 안정성 검토 모델)

  • Ho, Jong-Kwan;Han, Kap-Kyu;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.6
    • /
    • pp.99-106
    • /
    • 2007
  • Tower crane is a large construction equipment which is extremely tall for its section when it is erected, with its high slenderness ratio, and it has a heavy load by itself due to large lifting stuff to handle. In line with the construction projects in these days which increasingly tend to become higher, larger and complex, the stuff and height subject to lifting are also getting larger and higher, which has also increased the risk of disastrous accidents. A stable foundation design thus to deal with the increasing self load becomes more important. When a typhoon Maemi swept the nation in 2003, as many as 43 tower cranes fell down or collapsed, causing a severe damage to the people and the properties. Considering such fatal damages, a technical evaluation of the stability to prevent the safety accident with the tower crane must be very crucial. Tower cranes operation in domestic construction sites, in fact, have been simply dependent on personal experience and intuition of the engineers. Particularly when it comes to the foundation design, it mostly depends on manufacturer's recommendation. The study hence was intended to develop the fundamental measures for granting the objective stability, instead of following the individual's experience only. The simulation model recommended in the study is expected to make a good commitment to achieving an effective lifting work as well as preventing the safety accident.

A Development of a Counter Balancing Experimental Equipment (카운터 밸런싱 실습장치 개발)

  • Ryu, Jae-Hu;Huh, Jun-Young
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.5 no.1
    • /
    • pp.20-27
    • /
    • 2013
  • The counter balancing is a technique to control a load which is acting to actuator when the load changes from a resistance state to over running state according to the structural change of the load for the case of lifting or carrying a heavy load in industrial site. Even though this technique is frequently used in industrial site, there is no widely known design procedure and educational equipment in home and abroad. Therefore, in this study a new idea was presented to develop an counter balancing educational equipment. The idea was realized through the process of system modeling and simulation, drawing out of design parameters, manufacturing of a prototype. Finally the usefulness of this developed educational equipment was demonstrated by experiments. It is expected that by using this equipment a big help would be given to students who should understand the counter balancing equipment which is frequently encountered in industrial site.

  • PDF

Workload of Patients Transferring and its Improving Methods (병원 환자 운반 업무의 작업 부하 분석 및 개선 방안)

  • Kee, Do-Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.121-127
    • /
    • 2006
  • Nursing often requires heavy physical work activities such as lifting heavy loads, working in awkward postures, transferring patients, operating hazardous equipment, etc. Among various nursing tasks, patients transferring is one of the most physically demanding tasks. This study aims to investigate workload of the patients transferring, and to propose its improving methods for reducing high workload. The results showed that irrespective of methods for patients transferring and the number of workers involved, workload for most patients transferring tasks exceeded the action limit represented in terms of L5/SI compressive force of 3,400N or LI of 1.0 by NIOSH. The loads for some tasks were far larger than the maximum permissible limit of 6,400N. It is recommended that the mechanical devices for transferring patients such as ceiling crane, sling lift etc. should be introduced rather than simply increasing the number of workers in the tasks.

A Study on Fluid-Structure Interaction of a Hydrostatic Thrust Bearing (정압 스러스트 베어링의 유체-구조물 사이의 상호작용에 관한 연구)

  • Kim, Byung-Tak
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.5 no.3
    • /
    • pp.92-98
    • /
    • 2006
  • In this study, the behavior characteristics of a hydrostatic thrust bearing used in hydraulic equipment was analyzed using a commercial finite element program, ADINA. The solid domain was modeled with the fluid domain simultaneously to solve the fully coupled problem, because this is a problem where a fully coupled analysis is needed in order to model the fluid-structure interaction(FSI). The results such as bearing deformation, stress, film thickness and lifting bearing force were obtained through FSI analysis, and then they were compared with the results calculated from the classical method, a single step sequential analysis. It was found that the result difference between two analyses was increased according to the injection pressure. Therefore, in case of high pressure loading, it is desirable to conduct the FSI analysis to examine the deformation characteristics of a hydrostatic slipper bearing.

  • PDF

A Study on the Safety Risk of Telescoping Work of Tower Cranes (타워크레인 텔레스코핑 작업의 안전리스크 대응방안 연구)

  • Lee, Dong-Hoon;Choi, Jae-Hwi;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.9-13
    • /
    • 2009
  • As recent construction projects are bigger and higher, the importance of lifting is increasing. In construction sites tower cranes are an essential lifting equipment covering were than 50% of all construction activities. But due to neglect of safety supervision, tower crane-related accidents are frequently taking place. Since most of construction activities is done in heights, the accidents are more likely to be catastrophic. According to an analysis of the causes of tower crane-related accidents, 49% of all accidents claimed for certain periods($1999{\sim}2003$) occurred in the process of telescoping work. Therefore, this research is conducted with the object of analyzing telescoping work of tower cranes and presenting solutions against safety risk. It is expected that the results of this study can be used as useful basic data or material when preparing for effective safety management for tower cranes.

  • PDF

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Risk-based Design of On-board Facility for Lifting System Field Test of Deep-sea Mining System (심해저 광물자원 양광시스템 실증 시험을 위한 위험도 기반 선상 설비 설계)

  • Cho, Su-gil;Park, Sanghyun;Oh, Jaewon;Min, Cheonhong;Kim, Seongsoon;Kim, Hyung-Woo;Yeu, Tae Kyung;Jung, Jung Yeul;Bae, Jaeil;Hong, Sup
    • Journal of Ocean Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.526-534
    • /
    • 2016
  • This study had the goal of designing onboard structures for a pre-pilot mining test (PPMT), which is required for the commercialization of the deep-sea mining industry. This PPMT is planned to validate the performance of a hydraulic lifting system and verify the concept of operating through a moon-pool in the east sea, Korea. All of the onboard equipment and facility were designed by KRISO. Because the test was performed at the first development, it is difficult to determine what risk will occur in the facility. Therefore, risk-based design is required in the facility for the PPMT, which includes the facility layout, failure mode and effect analysis (FMEA), and risk reduction plan. All of the expected performances of the lifting system itself and the onboard facilities were qualitatively validated using the risk-based design.