• Title/Summary/Keyword: Level of Detail(LOD)

Search Result 99, Processing Time 0.022 seconds

A study on the 3D Terrain Modelling Technique based on DEM data (DEM 데이타에 의한 3차원 지형 모델링 기법에 관한 연구)

  • Choi, Jeong-Dan;Jeong, Yun-Jong;Lee, Cheol-Won;Yoon, Kyung-Hyun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.2 no.2 s.4
    • /
    • pp.99-108
    • /
    • 1994
  • In this thesis, we propose the 3D terrain modelling method for the better understanding of the geographic information. The process of 3D terrain medelling consists of three steps. The first step is to obtain real-world data from satellite images and stored in the form of DEM(Digital Elevation Model). The second one is to extract the meaningful data from DEM data based on LOD(Level Of Detail). And the third is to construct the 3D surface by TIN(Triangulated Irregular Network) with the extracted meaingful data. The proposed dynamic TIN reconstruction algorithm locally reconstruct the existed TIN model with the additional a new point. In this way, we can construct the TIN with the reduced time and can simulated 3D terrain model in real time.

  • PDF

System Architecture for Effective Point Cloud-based Reverse Engineering of Architectural MEP Pipe Object (효과적인 포인트 클라우드 기반 건축 MEP 파이프 객체 역설계 처리를 위한 시스템 아키텍처)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.9
    • /
    • pp.5870-5876
    • /
    • 2014
  • The aim of this study was to suggest the System Architecture for Effective Architectural MEP Pipe Reverse Design(PRD) based on the Point Cloud and derive the consideration. To do this, the requirement and use-cases related to the MEP pipe reverse design work were defined and the architecture for the reverse design automation was proposed. To identify a consideration for finding the architecture issues, a prototype was developed using the architecture and evaluated.

The Design of Scene Modeler Component for 3D GIS Software (3차원 GIS 소프트웨어를 위한 장면 모델러 컴포넌트 설계)

  • Kim, Sung-Soo;Choe, Seung-Keol;Lee, Jong-Hun;Yang, Young-Kyu
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2001.10a
    • /
    • pp.81-84
    • /
    • 2001
  • 3 차원 GIS 소프트웨어를 개발하기 위한 기술로는 공간데이터처리 및 공간분석기술, 컴퓨터그래픽스 및 가상현실 기술에 이르기까지 다양한 연구가 요구된다. 지리정보 가시화(Visualization)에 관한 연구는 여러 GIS 응용분야에서 주요한 부분이 된다. 현재 2 차원 기 구축된 데이터를 이용하여 3차원으로 가시화 및 분석을 수행할 수 있다는 것은 데이터와 소프트웨어 재사용 및 비용측면에서 중요한 의미를 가진다. 본 논문에서는 2차원 데이터와 최소한의 3차원 부가정보(빌딩높이, 도로폭등)를 이용하여 규칙기반 모델링(Rule-Based Modeling)을 통해 3 차원으로 모델링 해 낼 수 있는 3 차원 장면 모델러 컴포넌트 설계 방법을 제안한다. 시설물의 다양한 상세도 제어가 가능한 LOD(level-of detail) 모델러와 3 차원 장면을 효율적으로 관리하기 위한 장면 그래프(scene graph) 컴포넌트 설계 기술을 소개한다. 장면 모델러 컴포넌트 분석을 위해 처리하는 입력 데이터, 수작업 3 차원 모델링 여부, 소프트웨어 재사용성, 상호운용성, 구축 비용 등을 기준으로 분석하였다.

  • PDF

Local Shape Analysis of the Hippocampus using Hierarchical Level-of-Detail Representations (계층적 Level-of-Detail 표현을 이용한 해마의 국부적인 형상 분석)

  • Kim Jeong-Sik;Choi Soo-Mi;Choi Yoo-Ju;Kim Myoung-Hee
    • The KIPS Transactions:PartA
    • /
    • v.11A no.7 s.91
    • /
    • pp.555-562
    • /
    • 2004
  • Both global volume reduction and local shape changes of hippocampus within the brain indicate their abnormal neurological states. Hippocampal shape analysis consists of two main steps. First, construct a hippocampal shape representation model ; second, compute a shape similarity from this representation. This paper proposes a novel method for the analysis of hippocampal shape using integrated Octree-based representation, containing meshes, voxels, and skeletons. First of all, we create multi-level meshes by applying the Marching Cube algorithm to the hippocampal region segmented from MR images. This model is converted to intermediate binary voxel representation. And we extract the 3D skeleton from these voxels using the slice-based skeletonization method. Then, in order to acquire multiresolutional shape representation, we store hierarchically the meshes, voxels, skeletons comprised in nodes of the Octree, and we extract the sample meshes using the ray-tracing based mesh sampling technique. Finally, as a similarity measure between the shapes, we compute $L_2$ Norm and Hausdorff distance for each sam-pled mesh pair by shooting the rays fired from the extracted skeleton. As we use a mouse picking interface for analyzing a local shape inter-actively, we provide an interaction and multiresolution based analysis for the local shape changes. In this paper, our experiment shows that our approach is robust to the rotation and the scale, especially effective to discriminate the changes between local shapes of hippocampus and more-over to increase the speed of analysis without degrading accuracy by using a hierarchical level-of-detail approach.

LIM Implementation Method for Planning Biotope Area Ratio in Apartment Complex - Focused on Terrain and Pavement Modeling - (공동주택단지의 생태면적률 계획을 위한 LIM 활용방법 - 지형 및 포장재 모델링을 중심으로 -)

  • Kim, Bok-Young;Son, Yong-Hoon;Lee, Soon-Ji
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.14-26
    • /
    • 2018
  • The Biotope Area Ratio (BAR) is a quantitative pre-planning index for sustainable development and an integrated indicator for the balanced development of buildings and outdoor spaces. However, it has been pointed out that there are problems in operations management: errors in area calculation, insufficiency in the underground soil condition and depth, reduction in biotope area after construction, and functional failure as a pre-planning index. To address these problems, this study proposes implementing LIM. Since the weights of the BAR are mainly decided by the underground soil condition and depth with land cover types, the study focused on the terrain and pavements. The model should conform to BIM guidelines and standards provided by government agencies and professional organizations. Thus, the scope and Level Of Detail (LOD) of the model were defined, and the method to build a model with BIM software was developed. An apartment complex on sloping ground was selected as a case study, a 3D terrain modeled, paving libraries created with property information on the BAR, and a LIM model completed for the site. Then the BAR was calculated and construction documents were created with the BAR table and pavement details. As results of the study, it was found that the application of the criteria on the BAR and calculation became accurate, and the efficiency of design tasks was improved by LIM. It also enabled the performance of evidence-based design on the terrain and underground structures. To adopt LIM, it is necessary to create and distribute LIM library manuals or templates, and build library content that comply with KBIMS standards. The government policy must also have practitioners submit BIM models in the certification system. Since it is expected that the criteria on planting types in the BAR will be expanded, further research is needed to build and utilize the information model for planting materials.

Manipulation of 3D Surface Data within Web-based 3D Geo-Processing

  • Choe, Seung-Keol;Kim, Kyong-Ho;Lee, Jong-Hun;Yang, Young-Kyu
    • Proceedings of the KSRS Conference
    • /
    • 1999.11a
    • /
    • pp.80-83
    • /
    • 1999
  • An efficient modeling and management of a large amount of surface data for a wide rage of geographic information play an important role in determining the functionality of 3D geographic information system. It has been put many efforts to design and manage an effective way to enhence the manipulation of the data by considering geometry type and data structures. Recently, DEM(Data Elevation Model) and TIN(Triangulated Irregular Network) are used for representing surface data. In this paper, we propose a 3D data processing method. The method utilizes the major properties of DEM and TIN, respectively. Furthermore, by approximating DEM with a TIN of an appropriate resolution, we can support a fast and realistic surface modeling. We implement the structure with the following 4 level stages. The first is an optimal resolution of DEM which represent all of wide range of geographic data. The second is the full resolution DEM which is a subarea of original data generated by user's selection in our implemeatation. The third is the TIN approximation of this data with a proper resolution determined by the relative position with the camera. And the last step is multi-resolution TIN data whose resolution is dynamically decided by considering which direction user take notice currently. Specially, the TIN of the last step is designed for realtime camera navigation. By using the structure we implemented realtime surface clipping, efficient approximation of height field and the locally detailed surface LOD(Level of Detail). We used the initial 10-meter sampling DEM data of Seoul, KOREA and implement the structure to the 3D Virtual GIS based on the Internet.

  • PDF

A Study on the Improving the Rendering Performance of the 3D Road Model for the Vehicle Simulator (차량 시뮬레이터를 위한 3차원 도로모델의 렌더링 성능 향상에 관한 연구)

  • Choi, Young-Il;Jang, Suk;Kim, Kyu-Hee;Cho, Ki-Yong;Kwon, Seong-Jin;Suh, Myung-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.12 no.5
    • /
    • pp.162-170
    • /
    • 2004
  • In these days, a vehicle simulator is developed by using a VR(Virtual Reality) system. A VR system must provide a vehicle simulator with a natural interaction, a sufficient immersion and realistic images. To achieve this, it is important to provide a fast and uniform rendering performance regardless of the complexity of virtual worlds or the level of simulation. In this paper, modeling methods which offer an improved rendering performance for complex VR applications as 3D road model have been implemented and verified. The key idea of the methods is to reduce a load of VR system by means of LOD(Level of Detail), alpha blending texture mapping, texture mip-mapping and bilboard. Hence, in 3D road model where a simulation is complex or a scene is very large, the methods can provide uniform and acceptable frame rates. The VR system which is constructed with the methods has been experimented under the various application environments. It is confirmed that the proposed methods are effective and adequate to the VR system which associates with a vehicle simulator.

3D Surface Representation and Manipulation Scheme for Web-based 3D Geo-Processing

  • Choe, Seung-Keol;Kim, Kyong-Ho;Lee, Jong-Hun;Yang, Young-Kyu
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 1999.12a
    • /
    • pp.66-71
    • /
    • 1999
  • For given 3D geographic data which is usually of DEM(Data Elevation Model) format, we have to represent and manipulate the data in various ways. For example, we have to draw a part of them in drawing canvas. To do this we give users a way of selecting area they want to visualize. And we have to give a base tool for users to select the local area which can be chosen for some geographic operation. In this paper, we propose a 3D data processing method for representation and manipulation. The method utilizes the major properties of DEM and TIN(Triangular Irregular Network), respectively. Furthermore, by approximating DEM with a TIN of an appropriate resolution, we can support a fast and realistic surface modeling. We implement the structure with the following 4 level stages. The first is an optimal resolution of DEM which represent all of wide range of geographic data. The second is the full resolution DEM which is a subarea of original data generated by user's selection in our implemeatation. The third is the TIN approximation of this data with a proper resolution determined by the relative position with the camera. And the last step is multi-resolution TIN data whose resolution is dynamically decided by considering which direction user take notice currently. Specialty, the TIN of the last step is designed for realtime camera navigation. By using the structure we implemented realtime surface clipping, efficient approximation of height field and the locally detailed surface LOD(Level of Detail). We used the initial 10-meter sampling DEM data of Seoul, KOREA and implement the structure to the 3D Virtual GIS based on the Internet.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

Improved Radial Sweep Algorithm for 3-dimensional Terrain Modelling (3차원 지형 모델링을 위한 개선된 Radial Sweep 알고리즘)

  • Ryoo, Seung-Taek;Ahn, Chung-Hyun;Yoon, Kyung-Hyun
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.5 no.2 s.10
    • /
    • pp.77-85
    • /
    • 1997
  • Researches in the field of Computer Graphics and Geographical Information Systems(GIS) have extensively studied the method of photo-realistic landscape modelling, because it have become a commom requirement in applications such as flight simulators, mission rehearsal, and construction planning. A common approach to the display of terrain uses a Digital Elevation Model(DEM). DEM is an evenly spaced array of the terrain elevation data and can be obtained from stereo satellite data. With the DEM data, the process of 3D terrain modelling consists of three steps. The first step is to extract the meaningful data (such as peak, pit, passes...) from DEM data based on LOD(Level Of Detail) criteria. The second is to construct the 3D surface by TIN, which represents a surface as a set of non-overlapping continuous triangular facets of irregular size and shape. The third is a rendering of 3D terrain model. The goal of this research is a construction of 3D terrain with TIN. To do this, we are going to app]y Radial Sweep Algorithm. Radial Sweep Algorithm for generating TIN works quickly and efficiently. However, it does not solve the problem caused by the approximated nature of triangulated surface. To solve this problem, this research derive improved radial sweep algorithms with the optimal triangle definition.

  • PDF