Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF

The Design of Gate Array Layout System: HAN-LACAD-G (게이트 어레이 레이아웃 시스템의 설계 : HAN-LACAD-G)

  • 강병익;정종화
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.27 no.4
    • /
    • pp.628-635
    • /
    • 1990
  • This paper describes a new gate array layout system, HAN-LACAD-G(HANyang LAyout CAD system for Gate array). HAN-LACAD-G is composed of placer, global router, detailed router, and output processor. In placement design, initial placement is performed by repetitive clustering and min-cut partitioning followed by placement improvement using the concept of pairwise interchange. In global routing phase, pins are assigned in each channel considering the routing congestion estimation and overflows in feedthroughs are restricted. For the detailed routing, we use layer and three layer channel routing techniques. Layout results are displayed graphically and modified interactively by the user using the layout editor.

  • PDF

A Development of Design Support System for Multistep Deep Drawing Process (다단 디프 드로잉 공정의 설계지원 시스템 개발)

  • 나경환;최석우;최태훈;정완진;김종호;배형수
    • Transactions of Materials Processing
    • /
    • v.9 no.6
    • /
    • pp.638-643
    • /
    • 2000
  • This study Is concerned with the development of design support program for deep drawing process. The present support program is designed to generate the layout drawings by utilizing the following key functions: analysis of product shape, generation of key stages by pattern database, determination of layout generation method, generation of layout. furthermore, from the results by process design program input data for simulation Is automatically generated with appropriate process parameters and connected seamlessly to carry out the finite element analysis so that the design can be checked for the possible problems in real manufacturing process. The designer can generate layout drawings and test the design by simulation quickly and conveniently In these system designer can verify and optimize the design. We tested this system for various type of product shape md found that the generated layout is in good agreement with the real cases.

  • PDF

Application of The Value Analysis To Redesign Facility Layout

  • Laurent, Eyheraguibel;Jeong, Byung-Ho;Lee, Chan-Gie;Lee, Sang-Young
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.167-177
    • /
    • 1997
  • This paper deals with an application of process value analysis method for a manufacturing process in order to redesign facility layout in a paper company. We have used the value analysis method which permits an overall and rigorous study of process by a functional approach. Firstly, customer's expectations for the future process are clearly and precisely expressed with specifications of the Functional Extern Analysis. The existing process is analyzed using various tool of the Functional Internal Analysis in the second part. From the results of these analysis, we find out that the main problems of current facility are due to scheduling and facility layout. This paper is devoted to resolve the second problem. We suggest an ideal solution in order to have a reference solution. Nextly, We give realistic choices and the final solution for the facility layout.

  • PDF

Layout Planning for Stereolithography Parts using 3D Collision Detection Algorithm (3차원 충돌탐지 알고리듬을 이용한 광조형물의 최적배치 알고리듬 개발)

  • Kim, Boo-Young;Lee, Seok-Hee;Kim, Ho-Chan
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.9
    • /
    • pp.1546-1554
    • /
    • 2003
  • Efficient layout in a fixed work volume reduces build time when multiple parts are built at once in stereolithography systems. An efficient algorithm is developed for 3D layout planning. And it reduces build time and increases efficiency of SLA system. Genetic algorithm is implemented to locate as many parts as possible in the fixed work volume. A 3D collision detection algorithm, k-DOPs Tree, is implemented for the fast evaluation of a layout plan.

A Study of JIT-GT Composite Plant Layout (JIT-GT 혼합설비 배치에 관한 연구)

  • Park Jin Hong;Yang Kwang Mo;Cho Jung Hyun;Kang Kyung Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.47-51
    • /
    • 2004
  • Facility layout for enterprise's competitive power strengthening and construction of offensive manufacture line and direction presentation for design of production management system that is new by operation improvement according to S company. In enterprise in JIT(Just in Time) system of leading persons affecting in productions among a lot of habitat factor analyze. It is that through equipment Layout among those factors enterprise my problem improve and serves enterprise's absolute ability cultivation. Even if it is JIT production main point that affect to apply the modular production to productive system among at equipment Layout, lot size, bottleneck session etc. worker's multi-function anger, change of demand factor and productive capacity add. 'S' Through enterprise's example, I wish to establish Korean medium and small enterprises' manufacturing industry style equipment Layout model by taken place effect interpretation.

  • PDF

Constraints satisfaction problem기법을 이용한 조종패널 설계방법

  • 박성준;조항준;정의승;장수영
    • Proceedings of the ESK Conference
    • /
    • 1994.04a
    • /
    • pp.75-84
    • /
    • 1994
  • A control panel layout method based on the constraint satisfaction problem(CSP) technique was developed to generate an ergonomically sound panel design. This control panel layout method attempts to incorporate a variety of relevant ergonomic principles and design constrains, and generate an optimal or, at least, a "satisfactory" solution through the efficient search algorithm. The problem of seeking an ergonomically sound panel design should be viewed as a multiple criteria problem, and most of the design objectives should be understood as constraints. Hence, a CSP technique was employed in this study for dealing with the multi-constraiants layout problem. The efficient search algorithm using "preprocess" and "look ahead" procedures was developed to handle the vast amount of computational effort. In order to apply the CSP technique to the panel layout procedure, the ergonomic principles such as spatial compatibility, frequency-of- use, importance, functional grouping, and sequence-of-use were formalized as CSP terms. The effectiveness of the developed panel layout method was evaluated by example problems, and the results clearly showed that the generated layouts took various ergonomic design principles into account.esign principles into account.

  • PDF

A Heuristic Algorithm for Flow Shop Layout Design (Flow Shop 배치설계를 위한 휴리스틱 알고리즘)

  • Nam, Kee-Ho;Ok, Chang-Hun;Seo, Yoon-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.129-137
    • /
    • 2011
  • To date, facility layout problems has been solved and applied for job shop situations. Since flow shop has more restrictions, the solution space is much smaller than job shop. An efficient heuristic algorithm for facility layout problems for flow shop layouts is needed to be developed. In this thesis, a heuristic algorithm for rectangular bay layouts in a flow shop situation is presented. The proposed algorithm is developed by using slicing tree representation and applied to various flow shop layout problems. The effectiveness of the proposed algorithm in terms of exploration rate and objective function value are shown by comparing our results to simulated annealing.

Layout Design Problem in Multi-bay Facility (다중 베이 제조시스템의 설비배치)

  • Lee, Moon-Su;Chae, Jun-Jae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.4
    • /
    • pp.93-100
    • /
    • 2009
  • This paper addresses the facility layout problem in multi-bay environments, where the bays are connected at one or both ends by an inter-bay material handling system. In most previous studies, the main concern is to allocate facilities or departments to the bays whose widths are fixed. In this research, we suggest the efficient models that provide the optimal layout solution under flexible bay width environments. We also suggest a mathematical model that provides the optimal solution using two-way facility allocation approach instead of one-way allocation technique. This paper also shows the approach of TABU search to the assignment and layout design of the departments. The results generated from TABU search are compared to the result from the mathematical model. Models are developed using mixed integer programming for various test problems and solved by CPLEX.

The Process for Development of the Optimum Layout Model in Slab Formwork of High-rise Building Construction (초고층 건축공사의 바닥거푸집 최적배치 모델 구축 프로세스 연구)

  • Cha, Minsoo;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.171-172
    • /
    • 2011
  • Formwork accounts for a large proportion of the framework in high-rise construction projects in terms of the duration and cost. Especially, slab formwork has a significant influence on these factors. However, the current selection of formwork method in general contractors depends on the decisions of few experienced engineers, and layout planning of the formwork in specialty contractors requires lots of time by different floor types. As a preliminary study for developing an optimum layout model in slab formwork of high-rise building construction, this study proposes the process of the optimum layout model and determines a fitness function for use of the genetic algorithm aimed at table formwork.