Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

A Study on the Current Status and Challenge of Core Project in Urban Regeneration -Focused on the Type of Central Commercial District- (도시재생사업에서 핵심사업의 추진 현황과 과제 -중심시가지형 사업 추진 사례를 중심으로-)

  • Kim, Young-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.819-828
    • /
    • 2021
  • In urban regeneration projects, the core projects define the characteristics of the project site and contribute to the highest project cost and drive the project forward. The purpose of this study was to identify the current status and characteristics of the project as a priming project for urban regeneration and to seek desirable alternatives in the future project process. For this purpose, the case of urban regeneration projects in the Chungcheong region was targeted. The results showed that the core projects for each case consisted mainly of projects to develop physical facilities on a relatively large scale. Securing large-scale complex base space and constructing public parking lots are planned as key projects. In addition, based on the cost composition of the priming project, the core project accounted for approximately 80 % of the total project, and the project cost between linked projects does not appear to be relatively well linked in both public and private investment sectors. These findings are expected to help promote substantial urban regeneration projects and enhance efficiency by using them as basic data for urban regeneration projects in the future.

Thermal and Electrical Energy Mix Optimization(EMO) Method for Real Large-scaled Residential Town Plan

  • Kang, Cha-Nyeong;Cho, Soo-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.1
    • /
    • pp.513-520
    • /
    • 2018
  • Since Paris Climate Change Conference in 2015, many policies to reduce the emission of greenhouse gas have been accelerating, which are mainly related to renewable energy resources and micro-grid. Presently, the technology development and demonstration projects are mostly focused on diversifying the power resources by adding wind turbine, photo-voltaic and battery storage system in the island-type small micro-grid. It is expected that the large-scaled micro-grid projects based on the regional district and town/complex city, e.g. the block type micro-grid project in Daegu national industrial complex will proceed in the near future. In this case, the economic cost or the carbon emission can be optimized by the efficient operation of energy mix and the appropriate construction of electric and heat supplying facilities such as cogeneration, renewable energy resources, BESS, thermal storage and the existing heat and electricity supplying networks. However, when planning a large residential town or city, the concrete plan of the energy infrastructure has not been established until the construction plan stage and provided by the individual energy suppliers of water, heat, electricity and gas. So, it is difficult to build the efficient energy portfolio considering the characteristics of town or city. This paper introduces an energy mix optimization(EMO) method to determine the optimal capacity of thermal and electric resources which can be applied in the design stage of the real large-scaled residential town or city, and examines the feasibility of the proposed method by applying the real heat and electricity demand data of large-scale residential towns with thousands of households and by comparing the result of HOMER simulation developed by National Renewable Energy Laboratory(NREL).

An Exploratory Study on Common Information System Implementation Efficiency Among Overseas Subsidiaries of a Multinational Corporation (다국적 기업의 해외 자회사간 공용 정보시스템 구현 효율성에 관한 탐색적 연구)

  • Kim, Do-Yeong;Kim, Young-Gul;Lee, Gil-Hyung
    • Asia pacific journal of information systems
    • /
    • v.9 no.2
    • /
    • pp.117-132
    • /
    • 1999
  • Common system deployment is one of the global information systems strategies of a multinational corporation for large-scale development that can provide economies of scale and optimal use of scarce technical expertise. But while the same (headquarter) team implements the same system, the resulting efficiencies of those projects differ widely among the subsidiaries. This paper focuses on the differences between the efficiencies of these implementation projects. Eight prepropositions about the factors causing the differences have been developed from the previous research. These prepropositions are explored through a case study on the twelve overseas subsidiaries of a multinational electronic corporation headquartered in Korea. We found that three factors(autonomy of subsidiary, complexity of task, experience level of users) have strong relevant relationships and two factors(level of subsidiary country, level of process formality) have partial relevant relationships with the implementation outcome.

  • PDF

The Analysis of Assessment Factors for Preliminary Feasibility Study of Dam Project in Korea (국책사업 예비타당성조사 평가항목별 중요도 분석 - 댐 개발사업을 중심으로 -)

  • Koo, Jakon;Lee, Muchoon
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.6
    • /
    • pp.307-314
    • /
    • 2004
  • Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.

The Strength Characteristics By Freezing and Thawing of Controlled Low Strength Material Using Coal Ash (석탄회를 활용한 CLSM의 동결융해에 의한 강도 특성)

  • Hyun, Ho-Gyu;Kim, Sun-Tae;Jung, Hyuk-Sang;Chun, Byung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09b
    • /
    • pp.32-37
    • /
    • 2010
  • Recently, the land area for many people has been limited because of industrialization and modernization in Korea. The large-scale constructions like the reclamation development projects have been progressed to resolve this problem mentioned above. Therefore, as many of the usefulconstruction materials as possible are needed to perform the large-scale construction projects. Many studies for the utilization of pond ash which has a similar characteristic of sand have been conducted and there has been often occurred many structural problems on roadbed in winter. Therefore, the characteristics of the freezing and thawing for Controlled Low-Strength Material (CLSM) using pond ash were analyzed and evaluated by unconfined compressive strength test in this study. As a result of this study, it was confirmed that new CLSM using pond ash with cement (8.2% by weight)was able to stand for the freezing and thawing behavior.

  • PDF

Necessity of Korean Integrated Life Safety Code and Fire Safety Performance Evaluation Technology (한국형 통합 인명안전코드 및 화재안전 성능평가기술의 필요성)

  • Kwon, Young-Jin;Koo, In-Hyuk;Jin, Seung-hyeon;Lee, Byeong-Heun;Kim, Yun-Seong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.50-51
    • /
    • 2020
  • Recently, construction projects are gradually becoming high-rise and large-scale, and furthermore, the use of new buildings is emerging through the deepening of the underground. In this situation, a lot of fire damage has occurred in recent years, mainly in buildings and tunnel structures. In particular, damages caused by fires during large-scale construction projects such as freezing warehouse accidents are increasing. In this situation, in Korea, it is still trying to secure safety from human fire through the administrative system divided into the building law and the fire law, but it is being developed in a negative direction rather than a positive direction. The fire risk is getting bigger even when the road is not maintained. In this current situation, it is considered that the development of a Korean integrated life safety code centering on the consciousness base of Koreans will be necessary, and in particular, the ease of revision will also be needed by promoting the integrated safety code rather than current laws and regulations. This is a summary of the future tasks.

  • PDF

Establishment of governance through development of LH cooperation project with local government: Focusing on Jeju Area (지방자치단체·LH 협력사업 도출을 통한 거버넌스 구축방안 : 제주특별자치도를 대상으로)

  • Lee, Mi-hong;Seong, Jang-Hwan;Song, Youngil
    • Land and Housing Review
    • /
    • v.8 no.4
    • /
    • pp.285-294
    • /
    • 2017
  • Recently, as the paradigm of regional development has been transformed into characterization, decentralization and cooperation, small and medium scale development is in the spotlight. In particular, as the transfer of planning authority to local governments accelerates, LH is in the process of seeking to transform itself into a system that is in line with local government demand. The purpose of this study is to elaborate the regional pending projects that meet the demand of the region. The Jeju Special Self-Governing Province is the area where land and housing prices have increased more than three times recently, which is the area of interest in recent years due to the various demand for development projects. Another objective is to establish a local government based on LH's system, it is aimed to derive a collaboration method with local government, province corporation and local researchers. The criteria for deriving the cooperation projects between the local government and LH are basically the ones that can be carried out by LH and future-oriented projects. The process of deriving has undergone the process of statutory planning, unscrupulous plan analysis, and consultation of experts' advisory committees. In order to derive the regional cooperation project, four criteria such as local uniqueness, future possibility, business promotion efficiency, and local cooperation project were set. Major projects of the Jeju Special Self-Governing Province are improvement of the surrounding traffic system, construction of the hinterland due to the construction of the second airport, and establishment of Cruise Port(Jeju Port, Seogwipo Port). The role of each entity in the implementation of regional cooperation projects is as follows. Local government should request subsidies for the projects in case of lack of budget support and secure them through competition with other regions. In addition, it should be responsible for the operation and management of the facility once it has been supported and completed smoothly. The Ministry of Land, Infrastructure and Transport affects each region through approval and subsidy of the development plan. After the development project is completed, it evaluates the development project through monitoring and plays a role of continuously improving the system. As a business operator, the provincial corporation will carry out small-scale projects including non-physical projects such as community participation. In the case of LH regional headquarters, the general manager of the region will establish a comprehensive business plan, secure development availability, and carry out large-scale growth promotion projects.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF