• 제목/요약/키워드: Large dam

검색결과 386건 처리시간 0.035초

하상사력재를 이용한 CFRD의 연구 (A Study of CFRD using a Gravel Fill)

  • 정찬균;노태길;이송
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.842-853
    • /
    • 2008
  • In the construction of dam, the key factor which decides the type of dam is security of materials resource. Because of the large scale earth work, the ability to supply the materials is essential part about economical efficiency. The research is the case study about controlling the plan to secure the material resources in the design of Buhang multipurpose dam. In case of Buhang multipurpose dam, at that time of basic design, it was planned to use a rock fill material. From the detail investigation about the river bed accumulative layer widely spread on the submerged district on the basic design, the research is accomplished to replace rock material with gravel material. After the investigation of whole reserves of gravel material, estimation of conformity as dam construction material from analysis of grain size distribution, the case study of oversea construction, and the material property comparison between rock fill material and gravel fill material, it is verified th possibility of using the gravel fill. Thereafter, the analysis of dam stability using a gravel fill material is accomplished. Finally, A gravel fill material can be used as the main construction material of CFRD, therefore the efficiency of resource recycling in the submerged area is maximized, and the established plan is more advantageous to stability, constructibility, environmentibility than the case of using a rock fill.

  • PDF

Dynamic response of concrete gravity dams using different water modelling approaches: westergaard, lagrange and euler

  • Altunisik, A.C.;Sesli, H.
    • Computers and Concrete
    • /
    • 제16권3호
    • /
    • pp.429-448
    • /
    • 2015
  • The dams are huge structures storing a large amount of water and failures of them cause especially irreparable loss of lives during the earthquakes. They are named as a group of structures subjected to fluid-structure interaction. So, the response of the fluid and its hydrodynamic pressures on the dam should be reflected more accurately in the structural analyses to determine the real behavior as soon as possible. Different mathematical and analytical modelling approaches can be used to calculate the water hydrodynamic pressure effect on the dam body. In this paper, it is aimed to determine the dynamic response of concrete gravity dams using different water modelling approaches such as Westergaard, Lagrange and Euler. For this purpose, Sariyar concrete gravity dam located on the Sakarya River, which is 120km to the northeast of Ankara, is selected as a case study. Firstly, the main principals and basic formulation of all approaches are given. After, the finite element models of the dam are constituted considering dam-reservoir-foundation interaction using ANSYS software. To determine the structural response of the dam, the linear transient analyses are performed using 1992 Erzincan earthquake ground motion record. In the analyses, element matrices are computed using the Gauss numerical integration technique. The Newmark method is used in the solution of the equation of motions. Rayleigh damping is considered. At the end of the analyses, dynamic characteristics, maximum displacements, maximum-minimum principal stresses and maximum-minimum principal strains are attained and compared with each other for Westergaard, Lagrange and Euler approaches.

가뭄대비 농업용 지하댐 적지 평가 지표 개발 - 계층분석과정의 적용 - (Development of Suitable Sites Assessment Criteria for Agricultural Subsurface Dam for drought Management using Analytic Hierarchy Process (AHP))

  • 명우호;송성호
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제22권6호
    • /
    • pp.37-47
    • /
    • 2017
  • Climate change has often resulted in severe droughts in a rice-farming season (i.e., April to June), and the large amount of water resources were needed to cope with droughts during the season. Therefore, the subsurface dam, which is able to store groundwater resources in the alluvium aquifer, has been considered to be an alternative for securing more groundwater resources. In this study, suitable sites assessment criteria for agricultural subsurface dam using analytic hierarchy process (AHP) were established for adequate drought management. Moreover, the criteria were applied to the existing five agricultural subsurface dams to verify their applicability of groundwater supply for each subsurface dam. The assessment criteria were divided into three major categories (geology, hydrology and business condition) and classified to 12 individual sub-categories with weighting. From the assessment, Ian subsurface dam and Wooil subsurface dam were identified as the best and the worst suitable site, respectively, and this result was in accordance with the average amount of annual groundwater supply by each subsurface dam during the period of 2011-2017.

일유량 분석을 이용한 대규모 저수지의 퇴사량 추정 (Sediment Estimation of Large Reservoir Using Daily Flowrate Analysis)

  • 정재성
    • 한국환경과학회지
    • /
    • 제6권5호
    • /
    • pp.417-423
    • /
    • 1997
  • The objective of this study Is to supply basic data for large reservoir sedimentation research In future and make suggestions to maintain and opera능 the reservoir more of efficiently. At first, previous studios about the estimation of sediment yield rate were reviewed in Korea. And the discharge rating curves of upstream stage gauging stations and the correlation between dam Inflow and stage discharge were analyzed. With the analysis results, the spec유c sediment rate of Soyanggang dam was estimated as 608 m3/km2/yr. It was similar to that of Soyanggang dam feasibility study and 1994's field surveys of the reservoir than that of 1983's field surveys. Because the sediment rating curves were derived under the low discharge conditions, It needs to be checked under the flood conditions. However, the suggested methods such as flowrate analysis and sediment estimation will be useful to the sediment studios In future. Key words . reservoir sediment, sediment yield rate, rating curve, flowrate analysis.

  • PDF

락필댐의 정부침하 거동특성 연구 (A Study on Crest Settlement Characteristics of Rockfill Dam)

  • 박한규;박동순;김용성;이종욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1219-1226
    • /
    • 2005
  • In this study, crest settlement characteristics of CFRD (Concrete Faced Rockfill Dam) and ECRD (Earth Cored Rockfill Dam) were analysed through the instrumentation data from representative 7 large dams in Korea. Also, We have studied the effect of valley shape and uniaxial compressive strength of intact rock to better understand the impact of the parent rock strength and the valley shape on the long term crest settlement of CFRDs. From the results, we found that the valley shape and strength of intact rock on crest settlement of dams are an important parameters. As a result, we obtained that the maximum crest settlement of CFRD is larger than that of ECRD and long term crest settlement rate per dam height of rockfill dams is less than 0.60% during service period.

  • PDF

증발량을 고려한 낙동강유역 다목적댐의 가용허가수량 추정 (Estimation of Available Permit Water for Considering the Evaporation of Multipurpose Dams in Nakdong River Basin)

  • 김선주;박기춘;박희성
    • 한국농공학회논문집
    • /
    • 제55권3호
    • /
    • pp.1-7
    • /
    • 2013
  • The dam plan quantity of constructive and water supply quantity of present time are showing a difference with change in climate and augmentation of water demand for multipurpose dams in Nakdong river basin. But revaluates a water supply ability the method or the process is official for is not taking a position, so actual condition applies the plan quantity of dam constructive. Considers various situation of actual multipurpose dam from research sees consequently and in K-WEAP is an integrated water resources evaluation plan model applies as water permit availability multipurpose dam, currently water permit availability comparison, analyzed. In this study, the natural daily flow data and apply the dimensions of the reservoir, and for more than 30 years of the long-term water balance analysis conducted by Date Nakdong river basin can supply reservoirs are large quantity of permits available is presented.

Nonlinear dynamic behavior of Pamukcay Earthfill Dam

  • Terzi, Niyazi U.;Selcuk, Murat E.
    • Geomechanics and Engineering
    • /
    • 제9권1호
    • /
    • pp.83-100
    • /
    • 2015
  • Water and energy supplies are the key factors affecting the economic development and environmental improvement of Turkey. Given their important role and the fact that a large part of Turkey is in seismically active zones dams should be accurately analyzed since failure could have a serious impact on the local population environment and on a wider level could affect the economy. In this paper, a procedure is proposed for the static, slope stability, seepage and dynamic analysis of an earth dam and the Pamukcay embankment dam. The acceleration time history and maximum horizontal peak ground accelerations of the $Bing\ddot{o}l$ (2003) earthquake data was used based on Maximum Design Earthquake (MDE) data. Numerical analysis showed that, the Pamukcay dam is likely to experience moderate deformations during the design earthquake but will remain stable after the earthquake is applied. The result also indicated that, non-linear analysis capable of capturing dominant non-linear mechanism can be used to assess the stability of embankment dams.

국책사업 예비타당성조사 평가항목별 중요도 분석 - 댐 개발사업을 중심으로 - (The Analysis of Assessment Factors for Preliminary Feasibility Study of Dam Project in Korea)

  • 구자건;이무춘
    • 환경영향평가
    • /
    • 제13권6호
    • /
    • pp.307-314
    • /
    • 2004
  • Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.

Floristic Composition and Phytomass in the Drawdown Zone of the Soyangho Reservoir, Korea

  • Cho, Hyunsuk;Jin, Seung-Nam;Marrs, Rob H.;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • 제5권2호
    • /
    • pp.94-104
    • /
    • 2018
  • The Soyangho Reservoir in Korea has a large drawdown zone, with an annual maximum water level fluctuation of 37 m due to dam operations to maintain a stable water supply and control flooding, especially during the monsoon period. The floristic composition, distribution and biomass of the major plant communities in the drawdown zone of the Soyangho Reservoir were assessed in order to understand their responses to the wide water level fluctuation. Species richness of vascular plants was low, and species composition was dominated by herbaceous annuals. Principal coordinates analysis using both flora and environmental data identified slope angle and the distance from the dam as important factors determining floristic composition. The species richness was low in the steep drawdown zone close to the dam, where much of the soil surface was almost devoid of vegetation. In shallower slopes, distant from the dam plant communities composed of mainly annuals were found. The large fluctuation in water level exposed soil where these annuals could establish. An overall biomass of 122 t (metric tons) Dry Matter was estimated for the reservoir, containing ca 3.6 t N (nitrogen) and ca 0.3 t P (phosphorus); the role of the vegetation of the drawdown zone in carbon sequestration and water pollution were briefly discussed.

Experimental Study on Satellite Image Restoration for Vanished Area by Dam Construction

  • Yeon, Sang-Ho;Hong, Il-Hwa
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.1424-1426
    • /
    • 2003
  • It will be a real good news for the people who were lost their hometown by the construction of a large dam to be restored to the former state. Focused on Cheung-Pyung around where most part were flooded by the Chungju large Dam founded in early 1980s, we used Remote Sensing Technique in this study in order to restore topographical features before the flood with 3 dimensional effects. We gathered comparatively good satellite photos and remotely sensed digital images, then we made a new color image from these and the topographical map which had been made before the flood. This task was putting together two kinds of different timed images. And then, we generated DEM including the outskirts of that area as harmonizing current contour lines with the map. That could be a perfect 3D image of Cheung-Pyung around before when it had been flood by making perspective images from all directions, north, south, east and west, for showing there in three dimensions. Also, flying simulation we made for close visiting can bring us to experience their real space at that time.

  • PDF