• Title/Summary/Keyword: Landscape Architecture Construction Project Management

Search Result 45, Processing Time 0.034 seconds

Issues and Trends concerning of Ecological Landscape Planning and Design with ESSD (지속 가능한 개발 및 생태조경분야의 연구경향과 과제)

  • 이명우
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.1
    • /
    • pp.139-156
    • /
    • 2004
  • All Papers on Ecological Landscape Degign in KILA from 1973 to 2003 are listed herein for finding research issues and trends. The emerging field of Ecological studies of landscape design is based on Landscape Ecology and Watershed Ecology, the Principles of which can be applied to surveying and evaluation, Planning and design, construction and management focusing preservation of wildlife habitat and niche. This field can be classified into six categories: 1. Sustainable site planning and index, 2. Ecological planning process and regulation, 3. landscape ecology and biotope map, 4. Watershed and eco corridor project, 5. Urban forestry and environment, and 6. artificial ground and restoration ecology. The following is the summary of the findings from Paper review: 1. Sustainable index shall be studied about more specified sites. Water recycling facilities, and reservation wet land need to be studied. 2. Policy and legislation research on Ecological design shall be researched by expanding of the application field. Nature park planning and management fields shall be considered as the main theme of green networking Parts. 3. Landscape Ecological studies should be connected to practical surveying data, e.g. the eco-maps published by Environment Ministry. Traditional culture and science should be joined with the modem science. 4. Eco-corridor planning will go with the scenarios and theories of watershed ecology. 5. Urban forestry shall be studied with the wildlife's behavior and habitat. 6. Restoration engineering techniques should be reconsidered with the wildlife's existence and environmental affiliation.

Recognition of Stakeholders Regarding Building-Related Landscape Systems (대지의 조경 제도에 대한 관련 주체의 인식 비교 분석)

  • Kim, Yong-Gook;Lee, Sang-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.3
    • /
    • pp.79-91
    • /
    • 2018
  • This study proposes the difference of awareness and improvement plan of building-related landscape systems through a cognition survey of building owners, public officials, and experts. The main results are as follows. First, all three groups are highly aware of the need to secure urban green spaces. Even if private property rights are restricted, the level of awareness that green space should be secured for public benefit is high. The level of interest in the building-related landscape system was also surveyed to a greater degree. Second, the survey respondents, including the building owner group, answered that there is a need to strengthen the building-related landscape area standards. It can be seen that there is a need to revise the relaxation of the building-related landscape area standards through an amendment of the Building Ordinance in many local governments. Third, most municipalities are not equipped with an organizational system that can promote the work of building-related landscape. It is necessary to newly hire civil servants for landscape design, maintenance, and management specialization, or to expand co-working relationships with related departments. Fourth, building owners are interested in building-related landscape, but they do not know specific management methods and leave the landscape space. The municipality needs to offer guidance on landscape architectural design and construction methods that the building owners can easily follow and to support the voluntary landscape space management on the part of the local residents by supporting the trees. Fifth, in order to improve the building-related landscape system, it is necessary to verify the effect of the building-related landscape and spread a consensus. At the government level, in order to enable building owners to recognize the value of the landscape space in connection with an urban regeneration project, it is necessary to present an example of an excellent building-related landscape installation via a pilot project.

Resident Involvement Analysis of New Town Landscape Architecture Construction - Focused on the Gyeonggi GwangGyo District - (택지개발지구 조경공사의 주민관여 분석 - 경기도 광교지구를 중심으로 -)

  • Oh, Jeong-Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.6
    • /
    • pp.51-59
    • /
    • 2016
  • The purpose of this study is to improve interaction with the construction subject by analyzing the contents and contents of users' involvement in landscaping works. For this purpose, this study selected the Gwanggyo Residential Land Development District Public Landscape Project in Suwon, Gyeonggi Province. For four years before and after the completion, the opinions of tenants were used as research data. Both qualitative and quantitative analyses of 412 complaints received by the project implementation office and local government were conducted. As a result, first, the main purpose of suggesting opinions was 'demanding and expressing complaints', and there were many 'parks' and 'rivers'. In terms of content, "quality" was the most pointed out, but many kinds of trees, such as tree planting, ecological river construction, and pavement construction were also mentioned. Second, the extraction of key words from content analysis was the most common method. Followed by 'additional foodstuff' and 'moving to the toilet and management building'. Much of the point of view about dead wood has continued to be conspicuous in the process of waiting to be dealt with at the time of transplanting. Third, the validity of the contents of the complaints was evaluated as a five - point scale. Therefore, the opinions raised were unreasonable, but overall, there were more complaints with certain objectivity.

Enhancing Occlusion Robustness for Vision-based Construction Worker Detection Using Data Augmentation

  • Kim, Yoojun;Kim, Hyunjun;Sim, Sunghan;Ham, Youngjib
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.904-911
    • /
    • 2022
  • Occlusion is one of the most challenging problems for computer vision-based construction monitoring. Due to the intrinsic dynamics of construction scenes, vision-based technologies inevitably suffer from occlusions. Previous researchers have proposed the occlusion handling methods by leveraging the prior information from the sequential images. However, these methods cannot be employed for construction object detection in non-sequential images. As an alternative occlusion handling method, this study proposes a data augmentation-based framework that can enhance the detection performance under occlusions. The proposed approach is specially designed for rebar occlusions, the distinctive type of occlusions frequently happen during construction worker detection. In the proposed method, the artificial rebars are synthetically generated to emulate possible rebar occlusions in construction sites. In this regard, the proposed method enables the model to train a variety of occluded images, thereby improving the detection performance without requiring sequential information. The effectiveness of the proposed method is validated by showing that the proposed method outperforms the baseline model without augmentation. The outcomes demonstrate the great potential of the data augmentation techniques for occlusion handling that can be readily applied to typical object detectors without changing their model architecture.

  • PDF

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

A Study on the Actual Condition of Topsoil Management at River Restoration Projects (하천복원현장에서 표토관리 실태에 관한 연구)

  • Cho, Yong-Hyeon;Lee, Jong-Mun;Kim, Won-Tae;Yoon, Yong-Han;Kang, Hee-Kyoung;Park, Bong-Ju;Yoon, Taek-Seong;Jang, Kwang-Eun;Shin, Kyung-Jun;Eo, Yang-Joon;Kwak, Moo-Young;Song, Hong-Seon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.34-43
    • /
    • 2013
  • This study aimed to research and analyze the real condition of topsoil management of river development field as a significant case among domestic development fields for topsoil preservation. Through survey with experts, we understood the real condition and problems of topsoil management during river development. In order to verify this, we analyzed the characteristics of soil before and after development focusing on the rivers recently completed as an ecological river restoration project, supervised by Ministry of Environment among domestic river improvement projects. The study results are like below. First, experts preferred collecting and reusing topsoil as the best method to maintain and improve soil for plant growth. Second, realistically collecting and reusing topsoil is not fully conducted due to economical issues and inconvenience in construction. In the soil condition, third, the contents of elements necessary for plant growth like organic matter and total nitrogen declined overall after development.

An Analysis of the Characteristics of the Civil Complaints Occurred to the Landscape Architecture Project in Apartment Complex (아파트 단지 조경사업에서 발생하는 민원 특성 분석 - 민원의 공공성과 조치용이성 분석을 중심으로 -)

  • Cho, Se-Hwan;Lee, Myeong-Hun;Jo, Hyun-Kil;Kim, In-Ho;An, Seung-Hong;Oh, Jeong-Hak
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.5
    • /
    • pp.78-90
    • /
    • 2013
  • The purpose of this study was to analyze the types and characteristics of public complaints caused by the landscape architecture projects in the case of apartment complex. Furthermore, its purpose was also to propose as the basis data for the minimization of complaints in the course of future landscape architecture projects. To analyze and categorize the apartment complex civil complaints, we collected basic and case study data from LH Corporation, SH Corporation and GICO from 2009 to 2012. We also categorized 672 landscape complaints to 73 categories and conducted a survey from residents and landscape architecture. This Survey is to use IPA can collect character(public-private), handling of civil affair(easy-hard) and analyze typical characters and difference of civil complaint awareness between landscape architecture and residents. First, we were categorized 73 civil complaints by type in 5 categories such as park, green space and street trees, pedestrian road, facilities, and others. Second, the most common landscape complaints appear in green spaces, street trees, facilities, pedestrian roads and park orders. Third, results of the analysis conducted for each item which are publicity and measures the ease. 'Facilities', 'landscape and greenery', 'pedestrian road' and others were commonly appears from residents and professional awareness of the complaints. However, complaints of park appear different awareness between landscape architecture and residents. Fourth, 35 from 73 civil complaints(47.9%) are having high publicity and easy to measure, 25 civil complaints(34.2%) has analyzed to individual and difficult to measure so about the these complaints need to check from the design step so that it is necessary to minimize the problem of additional expense by civil complaints burden and decrease the confidence of residence problem were considered.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.

Internal and External Assessment of Contract Management Competences in the Overseas Construction Projects (해외 건설프로젝트 계약관리 역량의 대내적·대외적 평가)

  • Park, Seunghoon;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.109-120
    • /
    • 2017
  • Even though domestic construction companies are expanding into overseas construction markets, the profitability of overseas project are decreasing and finally some biggest domestic construction companies recorded heavy deficit one after another in 2013. Contract management, which is very deeply related to profitability, is the most difficult area to domestic construction companies, especially in Middle East and Asia where they have the highest market share and a high level of contract management is required. The purpose of this study is to assess their contract management competences to help them improve contract management skills and strategies. First, we defined the overseas project contract management process and selected competences from the each process stage. Then, we conducted a survey with overseas project experts. For considering their competences from various angles, we divided survey groups into domestic construction groups and other groups (Contract consultancy agencies and Construction research institutes) to understand the internal and external perspective of the domestic construction companies' contract management competences. The results of survey was analyzed by using paired samples t-test, Borich Needs Assessment Model and Independent t-test. We expected that the results of this study could contributes to establish strategies for enhancing the domestic construction companies' contract management competencies.