• Title/Summary/Keyword: Land Shape

Search Result 351, Processing Time 0.026 seconds

Conservation Measure of Sajapyeong Alpine Wetland (사자평 고산습지의 보전대책)

  • Son, Myoung-Won
    • Journal of the Korean association of regional geographers
    • /
    • v.17 no.2
    • /
    • pp.141-149
    • /
    • 2011
  • The formation of Sajapyeong Alpine Wetland was influenced by factors of drainage basin and its geology, and fire-shifting cultivation. Sajapycong drainage basin had a narrow outlet, Sijeon-cheon in it flowed relatively slowly. Bedrock in basin was weak to mechanical weathering, many rock detritus were, produced. Deforestation for reclamation using fire accelerated topsoil loss. Thus much sediments was supplied to Sijeon-cheon and deposited in the channel bed, and wetland was formed on channel marginal footslope. In Sajapyeong moor were Gullies formed along road. Because they blocked sediments and throughflow transferring into moor, moor became dry land. In order to prevent this drying, we have, to raise water level of a drain ditch to level of weathered bedrock to transfer throughflow into moor, modify the shape of ditch to be naturally irregular, and construct large boulders step on the Sijeon-cheon bed to prevent from lowering of its bed.

  • PDF

Estimation of reclaimed stone body by combined geophysical methods (정밀 물리탐사 병합기술에 의한 사석 투하량 조사)

  • Kim, Jung-Yul;Kim, Yoo-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.491-498
    • /
    • 2004
  • In recent years, as an effort to grasp the leading position in the field of maritime trading, new ports and container terminals arc now under construction. Old ports are extended. At the beginning, stones were thrown down to form stone embankments, that is stone-dams, in the outer and inner boundaries of the planned reclamation-land. S.C.P(Sand Compaction Pile) works are often needed to improve the stability of stone-dams, where marine sediments arc relatively thick. Here, interests are centered on the shape of stone body. In this, drilling work won't provide a sufficient resolution. In addition, the result corresponds to only one borehole point information. Thus, the aim of this paper is to introduce an affordable technology, that is, a combined geophysical method(seismic tomography + Televiewer) enables to get the whole information about stone-dam section. The measuring and evaluating procedure is described in detail with an emphasis on dealing with the use of seismic detonator, proper borehole deployment and integrated data analysis. Examples of field experiments at Busan new port are illustrated, which will prove the benefit of combined geophysical method.

  • PDF

A Basic Study for the Improvement Project of Housing Environment in the Cheju Island Region the Era of Globalization (지방화시대에 따른 제주지역의 주환경 개선 사업에 관한 기초 연구)

  • BongAeKim
    • Journal of the Korean housing association
    • /
    • v.6 no.2
    • /
    • pp.69-76
    • /
    • 1995
  • Recent opening of the era of local government and management randers study tasks concerning the improvement of the housing conditions by improving the problems in the residential conditions of the cheju Island region so as to help improve the life qualities of this legion make the area as an international resort place, and thus develop the indentify in the heat of the people in this region. The suggestions based on the study for the improvement of housing environment are summarized as follows: (1) To improve the collective housing. housing construction plan shall b made in harmony with the skylines of the Hanra mountain alongside the East-West rides across the long diameter of the oval shape of the Island, which includes 1) the construction of housing complex in harmony with and taking advantage of the natural scene of the area. and 2) the construction of variable housing readjustable in accordance with each family structure of variable housings for multi-families, which are believed not to provide quality housing conditions. Shall be entrained. (2) Encouraging the construction of detached house : 1) construction of housings in which three generations can reside together according to the traditional family structure in the region. 2) construction of the pastoral housings. 3) construction of tenement housings partitioned for each two families. 4) development of sliver town in the rural area. (3) Using the construction mateials produced in the Cheju I land will help promote the development of identity in the heart of the people in this region.

  • PDF

Diurnal Modification of a Red-Tide Causing Organism, Chattonella antiqua (Raphidophyceae) from Korea

  • Kim, So-Young;Seo, Kyung-Suk;Lee, Chang-Gyu;Lee, Yoon
    • ALGAE
    • /
    • v.22 no.2
    • /
    • pp.95-106
    • /
    • 2007
  • Blooms of Chattonella species are normally during summer in inland seas with high nutrients from the land and inflowing water. These blooms cause mass fish kills worldwide. We isolated a Chattonella strain from the south coast of Korea and identified it as C. antiqua. It is known that the morphological changes of phytoplankton correspond to the diurnal vertical migrations that follow an intrinsic biological clock and a nutrient acquisition mechanism during the day and night. In electron micrographs, C. antiqua clearly showed a radial distribution of lipid bodies in subcellular regions and plastids composed in which thylakoid layers were perpendicular to the surface. A single pyrenoid was present in each plastid and it was found at the end of the plastid towards the center of the cell. Throughout the day, plastids of C. antiqua cells appeared as an expanded net-like recticulum. During the night, however, the plastids changed their shape and contracted toward the cell periphery. The electron density of pyrenoids was increased in cells harvested during the night.

A Study on the Piazza Plan of Basilica S. Pietro (산 피에트로 교회의 광장계획에 관한 연구)

  • Kim, Seok-Man
    • Journal of architectural history
    • /
    • v.14 no.1 s.41
    • /
    • pp.7-19
    • /
    • 2005
  • The purpose of this paper is the study on the piazza plan of basilica S. Pietro. The results of study are as follows: 1. The piazza of the basilica S. Pietro was planned in relation to building-piazza-symbol of interior piazza-street as city planning characteristic of Baroque and architectural characteristic of elliptical piazza form. 2. The function of piazza of basilica S. Pietro was planned for religious meeting of a grand scale than a piazza for the common run of people. 3. In general, the disposition, ground, elevation and section plan of the piazza of basilica S. Pietro was planned by principle of spatial and formal composition, according to axis, symmetry, proportion, division and contrast. 4. The location, scale, shape of piazza for disposition and ground plan of the piazza of basilica S. Pietro was basically decided by not only elements of Basilica building, Vatican Palace, Street and Walls of surroundings with axis of the Basilica building, but Fountain and Obelisk as existing constituent elements. 5. The elevation of the piazza of basilica S. Pietro was composed of boundary that was enclosed from wall of trapezoid piazza and gallery of elliptical piazza with equal height as symmetry. And the section plan was planned to approach into the Basilica through slope and stairs of gentle angle, utilizing of existing land form.

  • PDF

A Study on Lubrication Characteristic of Slipper Hydrostatic Bearing in Hydraulic Piston Pump (유압 피스톤 펌프의 슬리퍼 정압베어링에 관한 윤활특성 연구)

  • Jung, J.Y.;Cho, I.S.;Baek, I.H.;Song, K.K.;Oh, S.H.;Jung, S.H.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.4 no.3
    • /
    • pp.1-6
    • /
    • 2007
  • The leakage generated from the clearance between the cylinder bore and the piston is one of the most serious problems in the hydraulic piston pump, and it even results in terrible decrease of the volume efficiency at a great velocity and high pressure. In this paper, the lubrication characteristic of the hydrostatic slipper bearing equipped in the hydraulic piston pump has been worked out by experimentation with three model bearings of different shape. Preparatory to this, not only the three models of piston-slipper were designed, but the corresponding experimental apparatus were also manufactured. As a result, it was verified that, according to the supply pressure, the hydrostatic bearing part of the slipper is severely affected by the pocket pressure, land pressure, oil film thickness, and leakage flow.

  • PDF

High Vibration Phenomena due to Cylinder Explosion Pressure of Low-speed Diesel Engine with 7 Cylinders installed on Land (육상에 설치된 저속 7실린더 디젤엔진의 폭발 기진력 및 고진동 현상)

  • Kim, Yeon-Wahn;Bae, Yong-Chae;Bae, Chun-Hee;Lee, Young-Shin
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.17 no.9
    • /
    • pp.826-834
    • /
    • 2007
  • A 7K60MC-S low speed diesel engine in a power plant has frequently experienced high vibration since the unit completed construction works. Up to date, no fundamental vibration solutions were reached. Hence, several vibration tests and analyses were conducted to identify the root cause of this high vibration and to suggest the optimal countermeasures for diesel engine. The 9.25 Hz and 25.4 Hz vibrations have been observed on main body during operation. The magnitude of engine upper structural vibration is generally similar in horizontal transverse direction. However, differences in the 'Fore' and 'After' vibration magnitude with the same vibration phase angle at 9.25 Hz occur due to the explosion pulsations of 7 cylinders and the Inertia momentum added by the SCR (selective catalytic reduction) duct system. It was analyzed that the excess structural vibration occurred when the natural frequency of engine body is affected by the exciting sources due to the explosion pressure and the discharge pulsation of the seven cylinders in resonance range.

Process Planning and Die Design for the Super Hot Forging Product, the Piston Crown Used in Marine Engine (선박엔진용 초대형 열간단조품, 피스톤크라운의 단조공정 및 금형 설계)

  • Hwang, B.C.;Lee, W.H.;Bae, W.B.;Kim, C.
    • Transactions of Materials Processing
    • /
    • v.17 no.8
    • /
    • pp.600-606
    • /
    • 2008
  • In closed-die hot forging, a billet is formed in dies such that the flow of metal from the die cavity is restricted. Some parts can be forged in a single set of dies, whilst others, due to shape complexity and material flow limitations, must be shaped in multi sets of dies. The purpose of a performing operation is to distribute the volume of the parts such that material flow in the finisher dies will be sound. This study focused on the design of preforms, flash thickness and land width by theoretical calculation and finite element analysis, to manufacture the super hot forging product, 70MC type piston crown used in marine engine. The optimal design of preforms by the finite element analysis and the design experiment achieves adequate metal distribution without any defects and guarantees the minimum forming load and fully filling of the cavity of the die for producing the large piston crown. The maximum loads obtained by finite element analysis are compared with the results of experiments. The loads of the analysis have good agreements with those of the experiment. Results obtained using DEFORM-2D enable the designer and manufacturer of super hot forging dies to be more efficient in this field.

Present Condition and Improvement points research for Shoreline Investigation Survey in Korea (우리나라 해안선조사측량 추진현황 및 개선점 연구)

  • Wie, Gwang-Jae;Kim, Eyung-Young;Sung, No-Sun;Lim, Young-Tae
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.403-406
    • /
    • 2010
  • Shoreline Investigation Survey in Korea 2001 Taean ended 2009 Tongyeong with start, Gosung in 2010 to survey the shoreline plans to complete the survey. Shoreline Investigation Survey of the country shape formulation and accurate coastline produced to by 2007 baseline survey, level survey, the terrain level survey, water level survey, tidal observations, property survey, etc was conducted. Since 2007 the status of topography survey were performed by replacing the Airborne LiDAR survey. In this research study surveying the shoreine of the business status, issues, improvements in the updated plan to analyze the shoreline land department future research and surveying the shoreline Island department plan is presented.

  • PDF

A Study Of Case On Prescription Of Spring Out Water In Cut Slope (절취사면 용출수의 효율적인 배제에 대한 사례연구)

  • Shin, Chang-Gun;Seo, Jeong-Yoo;Hong, Nam-Kyeong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1095-1099
    • /
    • 2009
  • In general, slope failures are occurred by the interaction among various factors(slope shape, hydraulic condition, and geologic condition, etc.). Hydraulic condition was a very important factor of a stability in cut slope and a dangerous of road passing. In this study, two cut-slope case on prescription of spring out water present. And this study data is used at practical affairs.

  • PDF