Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Design optimization of reinforced concrete structures

  • Guerra, Andres;Kiousis, Panos D.
    • Computers and Concrete
    • /
    • v.3 no.5
    • /
    • pp.313-334
    • /
    • 2006
  • A novel formulation aiming to achieve optimal design of reinforced concrete (RC) structures is presented here. Optimal sizing and reinforcing for beam and column members in multi-bay and multistory RC structures incorporates optimal stiffness correlation among all structural members and results in cost savings over typical-practice design solutions. A Nonlinear Programming algorithm searches for a minimum cost solution that satisfies ACI 2005 code requirements for axial and flexural loads. Material and labor costs for forming and placing concrete and steel are incorporated as a function of member size using RS Means 2005 cost data. Successful implementation demonstrates the abilities and performance of MATLAB's (The Mathworks, Inc.) Sequential Quadratic Programming algorithm for the design optimization of RC structures. A number of examples are presented that demonstrate the ability of this formulation to achieve optimal designs.

A Comparative Study of the Citrus Production Cost in the Three Countries : Korea, Taiwan, and Japan (한국, 대만, 일본의 감귤 생산비 비교분석)

  • Choi, Chan-Ho
    • Journal of Agricultural Extension & Community Development
    • /
    • v.3 no.1
    • /
    • pp.43-54
    • /
    • 1996
  • Citrus farming become one of highly potent area for the farmer s income in the Asia region. Because of its favorable taste and distinctive aroma, attractive color, and nutritional values, market demand has increased steadily along with the income increases in the region. However, realization of the potent have been constrained due to poor orchard management, frequent occurrences of pest and diseases, and a high cost in production besides of the market failures. Cutting down of production cost should be an operational goal to obtain mope profit where marketing structure has yet been underdeveloped. The objective of this study was to provide a comparative information to those program efforts of searching comparative advantage in production. For the three countries, reduction of labor cost by reduction of chemical application frequency was recommended while pursuing further mechanization in those operation such as in pruning, harvesting and pest control. Adoption of the IPM (integrated pest management) will be useful to reduce the number of spraying chemicals with changed knowledge and attitude of the farmers.

  • PDF

A Study on the Validity of Government Cloud SaaS Service Migration using TCO Approach (TCO 접근방법을 통한 정부클라우드 SaaS 서비스 전환의 타당성에 관한 연구)

  • Yoon, Seong-Jeong;Kim, In-Hwan;Seo, Jung Wook;Kim, Min-Yong
    • Journal of Information Technology Services
    • /
    • v.11 no.4
    • /
    • pp.215-231
    • /
    • 2012
  • It is well known that SaaS(Software as a Service) changeover gives several advantages to organization. One of the advantages is the cost reduction effect of IT resources as well as IT human resources. Another one is the curtailment of software development workload in the field of informatization promotions. Nonetheless, it is hard to find comparison cases regarding the quantitative measurement of the introduction of SaaS before and after. Accordingly, when the Government IDC tries to adopt SaaS, it absolutely needs the empirical study whether SaaS is cost-effectiveness or not. In this study, we focus on variation in the Government administration common tasks, processes and labor costs. Using the Man-Month(MM) estimation methods, We verify that how much TCO(Total Cost of Ownership) is reduced per year.

STUDY OF NEW CAST-IN-PLACE MORTAR WALL FOR HOUSE CONSTRUCTION COMPARED TO BRICK AND MORTAR-BLOCK SYSTEM (A SIMULATION IN DIFFERENT AREAS)

  • Arief Setiawan Budi Nugroho;Shin-ei Takano
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.196-202
    • /
    • 2009
  • Study from Yogyakarta earthquake reconstruction program, cast-in-place wall using fix-size formwork system (Old-CIP) has offered a good alternative for house construction. A simulation has also confirmed that this system using mortar as the main material can provide cheapest cost and lowest total man power compared to conventional wall construction technique: brick or mortar-block wall. This paper presents the new wall construction technique: full size cast-in-place wall (New-CIP). The detail of how this new technique implemented is described. In addition, considering that material and labor cost in one area is different to others, cost analysis for different resources prices and wages of three cities are taken into a simulation. The analysis is aimed to distinguish the implementation feasibility of New-CIP system compared to the four common wall systems. Finally, its implementation resistance is also discussed.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase (시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안)

  • Lee, Jae-Hyun;Jeong, Jae-Wook;Jeong, Jae-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

The Economic Comparison of EHP and GHP for Medium Capacity Air-conditioning (중용량 공조에서 EHP와 GHP의 경제성 비교)

  • Kim, Young-Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.3
    • /
    • pp.167-174
    • /
    • 2008
  • Cost related to building equipment accounts for about 85% of the life cycle cost of buildings. Therefore proper selection of air-conditioning system is important for reducing the overall cost of buildings. In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of 1,200 $m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, cost of equipment, construction, installation, electric facility, financial subsidy and tax cut is considered. Cost of basic electricity, energy(electricity and gas), space charge, labor, insurance and repair is considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP, but this is not absolute and different outcome may result if different assumptions are made. This study is useful for those who are interested in choosing an air-conditioning system that costs less for mid-size buildings with simple calculations.

A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects (지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로)

  • Kim, Sojung Lucia;Seo, Yong Won;Son, Young-ho
    • Journal of Information Technology Services
    • /
    • v.16 no.3
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.

Computerization for Management of Street Tree Using CAD (CAD를 이용한 가로수 관리 전산화에 관한 연구)

  • 허상현;심경구
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.2
    • /
    • pp.68-76
    • /
    • 2001
  • The purpose of this study is to computerize street tree management using a CAD program in order to manage the drawing record of street trees systematically and concurrently. The configuration of this program is composed of Reference Data, Data Inquiry, and Cost Assessment. The Reference Data includes characteristics of trees, monthly managements records, damage by blight and insects and usage of pesticides. The Data Inquiry includes an individual search of the tree index, simple searches and multiple searches. The Cost Assessment includes two main components, the data input with labor cost, manure ocst and pesticide cost and the assesment of management cost for prevention of blight and insects, pruning and fertilization. The results of this study are as follows: 1) When there are practices such as transplanting and removing of street trees it is immediately updated with the various situation. By creating an in progress a tree management system, up to the date information can be given to the manager for decision making. 2) To identify individual tree at the site or in drawing, the street name and numbers were used instead of coordinates. Tree tags are attached to the street trees individually. It can make DB management simple and easy. 3) By doing simple or multiple search with constructed DB, data can be provided quickly. 4) The result of this type of search are useful in the assessment of management cost very useful in regards to items such as the pruning, pesticides scattering and fertilization. 5) By using the AutoCAD software and existing PC without purchasing new equipment, the cost of system implementation can be minimized.