• Title/Summary/Keyword: LED Wall

Search Result 162, Processing Time 0.02 seconds

Expression method of simulation which is execution of media facade (미디어파사드 시뮬레이션 표현방법)

  • Lee, Chang-Jo;Ha, Dong-One;Han, Tae-Woo
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.5
    • /
    • pp.91-101
    • /
    • 2009
  • This study's purpose is to revive pre-construction situation earlier than construction of media facade using light-emitting diode, and analyze the strong and weak points of simulation image making process and technology, including lots of expressing methods. Exterior building decoration that was originated from Super Graphic led to the LED construction with a trend of increased night activities of these days. Initial Super Graphic was just in the level of deciding what to do with simple CAD drawings, but today's media facade construction is not so simple as the previous ones. This is because of the problems that should think about balances between neighboring environment and buildings, including high construction costs. According to survey results, media facade construction simulation's various expressing methods, its processes of analysis, and its strong & weak points will suggest standards for its size of construction and simulation purpose, including recommending suggestions that can respond rapidly by clients' diverse demands.

Dentin bond strength of bonding agents cured with Light Emitting Diode (LIGHT EMITTING DIODE로 광조사한 상아질 접착제의 상아질 전단접착강도와 중합률에 관한 연구)

  • Kim Sun-Young;Lee In-Bog;Cho Byeong-Hoon;Son Ho-Hyun;Kim Mi-Ja;Seok Chang-In;Um Chung-Moon
    • Restorative Dentistry and Endodontics
    • /
    • v.29 no.6
    • /
    • pp.504-514
    • /
    • 2004
  • This study compared the dentin shear bond strengths of currently used dentin bonding agents that were irradiated with an LED (Elipar FreeLight, 3M-ESPE) and a halogen light (VIP, BISCO). The optical characteristics of two light curing units were evaluated. Extracted human third molars were prepared to expose the occlusal dentin and the bonding procedures were performed under the irradiation with each light curing unit. The dentin bonding agents used in this study were Scotchbond Multipurpose (3M ESPE), Single Bond (3M ESPE), One-Step (Bisco), Clearfil SE bond (Kuraray), and Adper Prompt (3M ESPE), The shear test was performed by employing the design of a chisel-on-iris supported with a Teflon wall. The fractured dentin surface was observed with SEM to determine the failure mode. The spectral appearance of the LED light curing unit was different from that of the halogen light curing unit in terms of maximum peak and distribution. The LED LCU (maximum peak in 465 nm) shows a narrower spectral distribution than the halogen LCU (maximum peak in 487 nm). With the exception of the Clearfil SE bond (P < 0.05), each 4 dentin bonding agents showed no significant difference between the halogen light-cured group and the LED light-cured group in the mean shear bond strength (P > 0.05). The results can be explained by the strong correlation between the absorption spectrum of camphoroquinone and the narrow emission spectrum of LED.

Numerical Modeling of Heat Transfer Due to Particle Impact on a Wall (벽면에서의 입자 고찰에 의한 열전달 수치 모델)

  • 권오붕
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.31 no.3
    • /
    • pp.296-305
    • /
    • 1995
  • A numerical study was undertaken to clarify the mechanisms of heat transfer in fluid-particle suspension flows. Such flows, including fluidization, are of considerable industrial importance. The present study uses 2-D numerical computations of collisions of normal incidence between a particle and a wall. By comparing the results using (a) adiabatic boundary conditions on the particle and (b) uniform, elevated temperature conditions on the particle, the contributions of fluid-mediated conduction and particle induced convection were successfully separated. Computational expedience led to the use of a transient conduction thermal layer as the background thermal field for the analysis. The results shows that the effect of particle movement is very small until the particle reaches a distance of one to one half diameter away from the wall. The gas-mediated conduction effect is dominant over the induced gas convection effect when Pe is small and the induced gas convection effect becomes significant as Pe increases.

  • PDF

CHAINED COMPUTATIONS USING AN UNSTEADY 3D APPROACH FOR THE DETERMINATION OF THERMAL FATIGUE IN A T-JUNCTION OF A PWR NUCLEAR PLANT

  • Pasutto, Thomas;PENiguel, Christophe;Sakiz, Marc
    • Nuclear Engineering and Technology
    • /
    • v.38 no.2
    • /
    • pp.147-154
    • /
    • 2006
  • Thermal fatigue of the coolant circuits of PWR plants is a major issue for nuclear safety. The problem is especially accute in mixing zones, like T-junctions, where large differences in water temperature between the two inlets and high levels of turbulence can lead to large temperature fluctuations at the wall. Until recently, studies on the matter had been tackled at EDF using steady methods: the fluid flow was solved with a CFD code using an averaged turbulence model, which led to the knowledge of the mean temperature and temperature variance at each point of the wall. But, being based on averaged quantities, this method could not reproduce the unsteady and 3D effects of the problem, like phase lag in temperature oscillations between two points, which can generate important stresses. Benefiting from advances in computer power and turbulence modelling, a new methodology is now applied, that allows to take these effects into account. The CFD tool Code_Saturne, developped at EDF, is used to solve the fluid flow using an unsteady L.E.S. approach. It is coupled with the thermal code Syrthes, which propagates the temperature fluctuations into the wall thickness. The instantaneous temperature field inside the wall can then be extracted and used for structure mechanics computations (mainly with EDF thermomechanics tool Code_Aster). The purpose of this paper is to present the application of this methodology to the simulation of a straight T-junction mock-up, similar to the Residual Heat Remover (RHR) junction found in N4 type PWR nuclear plants, and designed to study thermal striping and cracks propagation. The results are generally in good agreement with the measurements; yet, in certain areas of the flow, progress is still needed in L.E.S. modelling and in the treatment of instantaneous heat transfer at the wall.

Development of an Ensemble Prediction Model for Lateral Deformation of Retaining Wall Under Construction (시공 중 흙막이 벽체 수평변위 예측을 위한 앙상블 모델 개발)

  • Seo, Seunghwan;Chung, Moonkyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.4
    • /
    • pp.5-17
    • /
    • 2023
  • The advancement in large-scale underground excavation in urban areas necessitates monitoring and predicting technologies that can pre-emptively mitigate risk factors at construction sites. Traditionally, two methods predict the deformation of retaining walls induced by excavation: empirical and numerical analysis. Recent progress in artificial intelligence technology has led to the development of a predictive model using machine learning techniques. This study developed a model for predicting the deformation of a retaining wall under construction using a boosting-based algorithm and an ensemble model with outstanding predictive power and efficiency. A database was established using the data from the design-construction-maintenance process of the underground retaining wall project in a manifold manner. Based on these data, a learning model was created, and the performance was evaluated. The boosting and ensemble models demonstrated that wall deformation could be accurately predicted. In addition, it was confirmed that prediction results with the characteristics of the actual construction process can be presented using data collected from ground measurements. The predictive model developed in this study is expected to be used to evaluate and monitor the stability of retaining walls under construction.

XR Stage와 연계한 볼류메트릭 비디오 활용 전망

  • 이진서
    • Broadcasting and Media Magazine
    • /
    • v.28 no.2
    • /
    • pp.13-24
    • /
    • 2023
  • 2018년도부터 국내에서 많이 알려진 Volumetric Video(이하 볼류메트릭 비디오)는 지난 몇 년간 지속적인 개발과 변화를 해왔고 최근에는 데이터의 생성 방법을 보다 쉽고 가볍게 만드는 기술이 도입되면서 아직 대중적으로 보편화된 시스템은 아니지만 지속 성장을 하고 있다. 본 논고에서는 실제 사람을 기반으로 만든 볼류메트릭 비디오와 최근 국내외에서 많이 활용되고 있는 LED Wall을 이용한 ICFVX(In Camera VFX), XR Stage와 연계한 콘텐츠 제작 사례를 중심으로 볼류메트릭 비디오의 디지털 휴먼으로서 활용도와 더 나아가 게임엔진 기반의 가상 공간에서의 볼류메트릭 비디오 기술 적용 확대에 대하여 살펴본다.

  • PDF

Development of a displacement-based design approach for modern mixed RC-URM wall structures

  • Paparoa, Alessandro;Beyer, Katrin
    • Earthquakes and Structures
    • /
    • v.9 no.4
    • /
    • pp.789-830
    • /
    • 2015
  • The recent re-assessment of the seismic hazard in Europe led for many regions of low to moderate seismicity to an increase in the seismic demand. As a consequence, several modern unreinforced masonry (URM) buildings, constructed with reinforced concrete (RC) slabs that provide an efficient rigid diaphragm action, no longer satisfy the seismic design check and have been retrofitted by adding or replacing URM walls with RC walls. Of late, also several new construction projects have been conceived directly as buildings with both RC and URM walls. Despite the widespread use of such construction technique, very little is known about the seismic behaviour of mixed RC-URM wall structures and codes do not provide adequate support to designers. The aim of the paper is therefore to propose a displacement-based design methodology for the design of mixed RC-URM edifices and the retrofit of URM buildings by replacing or adding selected URM walls with RC ones. The article describes also two tools developed for estimating important quantities relevant for the displacement-based design of structures with both RC and URM walls. The tools are (i) a mechanical model based on the shear-flexure interaction between URM and RC walls and (ii) an elastic model for estimating the contribution of the RC slabs to the overturning moment capacity of the system. In the last part of the article the proposed design method is verified through nonlinear dynamic analyses of several case studies. These results show that the proposed design approach has the ability of controlling the displacement profile of the designed structures, avoiding concentration of deformations in one single storey, a typical feature of URM wall structures.

A Study on the Compression of Construction Period by the Improvement of Trench Excavation for Slurry Wall Method (지하연속벽 시공 시 트렌치 굴착방법 개선을 통한 공기단축에 관한 연구: 현장적용사례를 중심으로)

  • Lee, Young Soo;Park, Hyung-Keun;Kang, Kyubyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.499-505
    • /
    • 2012
  • As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.

The Heart Rate Monitoring System using Inverted Photoplethysmography (반전 용적맥파 신호를 이용한 심박 모니터링 시스템)

  • Lee, Jun-Yeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.3
    • /
    • pp.105-111
    • /
    • 2012
  • Photoplethysmogram is widely used to measure heart rate and arterial blood oxygen saturation in human. This paper describes implementation a photoplethysmography monitoring system that uses 780nm and 940nm length infrared light in radial artery. That system used combinations of 8 LEDs and 2 photoelectricities. When recorded on the skin over radial artery, the radial pulse wave was inverted. The mechanism of inverted pulse wave skin, which was reduced during systolic period and increase during diastolic period of the cardiac cycle. Through this system, we discovered optimal environments and combinations of sensors in both penetration type and reflection type. These results suggest that radial arterial wall way reflect infrared ray.

A Study on Improvement of the Performance of Pulsed AC Ion Bar (2) (바 형태 정전기제거장치의 정전기제거성능 향상을 위한 연구 (2))

  • Lee, Dong Hoon;Choi, Dong Soo;Kim, Sang Min;Park, Jin Chul
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.40-45
    • /
    • 2014
  • In display such as LCD, LED, and AMOLED or semiconductor related industries are required to have static ionizer in order to produce reliable goods. The most general type of ionization is called, "corona discharge" that has a slight chances to generate unequal and unstable amount of each +/- ion to the target object. Then, the ionization performance will drastically decrease and end up with quality deterioration problem. continually "A study on the improvement of the performance of pulsed AC ion bar(1)", we have studied consecutive study to improve the current issue via appling "partition wall" at air nozzle surrounding. The results were that the charge decay time and the ion balance was maintained the satisfied range that was within 5 second and ${\pm}50$ V for a 180 days period of time. In additions, the contamination status on the electrode surface was investigated for a 180 days. The little particles was deposited on the electrode surface.