• Title/Summary/Keyword: LCC Method

Search Result 202, Processing Time 0.025 seconds

Repair LCC Evaluation of RC Structures through the FEM Analysis of Chloride Ion Penetration (염소이온 침투 FEM 해석을 통한 RC구조물의 보수 LCC 평가)

  • Lee, Han-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.1
    • /
    • pp.223-230
    • /
    • 2006
  • In this paper the method for repair LCC evaluation of reinforced concrete structures deteriorated by chloride attack was constructed. Also, the FEM analysis for chloride ion penetration into concrete was conducted to evaluate the repair LCC which was decided by the number of repair times including early stages of construction and repair construction during the service life of structures. As a result, the number of repair times is obtained from the comparing the concentration of the chloride ion in a rebar position, and the critical chloride ion concentration of rebar corrosion through the FEM analysis considering the kind of repair materials and methods. Also, the repair LCC could be calculated by the number of repair times during the service life of structures.

Optimum Life-cycle Cost Design of Orthotropic Steel Deck Bridges (강상판교의 생애주기비용 최적설계)

  • Cho, Hyo Nam;Min, Dae Hong;Lee, Kwang Min
    • Journal of Korean Society of Steel Construction
    • /
    • v.13 no.4
    • /
    • pp.337-349
    • /
    • 2001
  • This study present an optimum deck and girder system design for minimizing the life-cycle cost (LCC) of orthotropic steel deck bridges. The problem of optimum LCC design of orthotropic steel deck bridges is formulated as that of minimization of the expected total LCC that consists of initial cost, maintenance cost, expected retrofit costs for strength, deflection, and fatigue. To demonstrate the effect of LCC optimum design of orthotropic steel deck bridges, the proposed optimum LCC design is compared with the conventional method for orthotropic steel deck bridges design. From the numerical investigations, it may be positively stated that the proposed optimum design procedure for orthotropic steel deck bridges based on the LCC will lead to more rational, economical and safer design.

  • PDF

Life-Cycle Cost Optimization of Steel Box Girder Bridges (강상자형교의 생애주기비용 최적설계)

  • 조효남;민대홍;권우성
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.15 no.4
    • /
    • pp.557-566
    • /
    • 2002
  • This paper presents an optimum deck and girder system design for minimizing the life-cycle cost(LCC) of steel box girder bridges. The problem of optimum LCC design of steel box girder bridges is formulated as that of minimization of the expected total LCC that consists of initial cost, maintenance cost and expected retrofit costs for strength, deflection and crack. To demonstrate the cost effectiveness of LCC design of steel box girder bridges, the LCC optimum design is compared with conventional design method for steel box girder bridges. From the numerical investigations, it may be positively stated that the optimum design of steel box girder bridges based on LCC will lead to mote rational, economical and safer design.

A Study on the Selection of a Bridge Structure Type Using DEA and LCC (DEA기법과 LCC개념을 활용한 교량형식 선정 방법에 관한 연구)

  • Han, Sam-Heui;Kim, Jong-Gil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.101-111
    • /
    • 2013
  • In this study, DEA (Data Envelopment Analysis) was carried out on the four bridges, which have the same extension (L=1,615m), in order to select the most superior, economical method of construction using the LCC concept of each bridge structure in the case of the Ulsan-Pohang double track railway which is scheduled to be constructed. DEA models were analyzed with the CCR model, which was designed for the evaluation of relative efficiency of each model. The initial construction costs, maintenance costs, indirect costs (user costs + indirect loss of social costs), and life cycle costs were used as input variables, and average duration was applied as the output variable. LCC was applied to calculate the input variables, and to get the costs of LCC, 100 years of period and 4.83% of real discount rate were applied, and the costs are classified into initial construction, maintenance, user, and indirect loss of social cost. The analysis results showed that the Method 2 and 3 were evaluated as the most efficient, and the other alternatives were evaluated as the following order; Method 1, the default, and Method 4.

LCC Analysis of Steel Plate Bridge Deck Pavement Through Internalization of Improved Functions (기능 개선의 내재화를 통한 강상판 교면포장의 LCC 분석)

  • Baek, Jae Wook;Park, Tae Hyo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.113-123
    • /
    • 2011
  • LCC analysis is a method that coordinates with function evaluation for value improvement, rather than a separate one for cost evaluation. Although its accuracy is rising, materials and structural types developed or applied relatively recently have yet to obtain a sufficient maintenance profile DB, inducing reliability to reduce from difficulties in estimating maintenance records. Based on the above mentioned background, this paper presents the LCC methodology of coordinating functional intensification matters with cost for analysis on alternatives with difficulties in setting maintenance profile. Recently, steel plate bridge deck pavements are faced with problems such as plastic deformation due to the increase in heavy vehicles and traffic, promoting the development of a new compound pavement. This paper execute LCC analysis by mentioning case studies of SMA, Guss and PSMA pavements to include performance scale compared between alternatives as relative evaluation coefficients into the maintenance profile.

A Study on Economic Analysis of LNG Fuel Propulsion Ships using Life Cycle Cost(LCC) Based on Combined Interest Rates and Sensitivity Analysis (복합이자율과 민감도분석에 기반한 LCC 기법에 의한 LNG 연료추진 선박 경제성 평가 사례 연구)

  • Hong, Jin Pyo;Kim, Su Yeong;Kim, Chwa Jin
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.51 no.6
    • /
    • pp.451-458
    • /
    • 2014
  • The purpose of this study is to compare the economics between a diesel propulsion vessel and a LNG fuel propulsion vessel through the analysis of the present value using the LCC(Life Cycle Cost) method. This study is also to judge the economics for long-term operation of a LNG fuel propulsion vessel as a result of analysis about the equivalent uniform annual cost. In particular, LCC method was strengthened by sensitivity analysis based on combined interest rate which is considering discount rate and inflation rate simultaneously.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

Damage Estimation and LCC Optimal Design of Seismic Isolated Bridges considering nonlinearities of Pier and Isolator (교각 및 지진격리장치의 비선형성을 고려한 지진격리교량의 손상평가 및 LCC 최적설계)

  • 고현무;함대기;신정환
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.344-351
    • /
    • 2003
  • In order to consider the characteristics of nonlinear dynamic responses of seismic isolated bridges reasonably, piers and isolators are modeled as a 2-DOF bilinear system. Then nonlinear time-history earthquake response analysis is accomplished many artificial input ground motions which were generated to reflect the characteristics of earthquakes. Damage probabilities and failure probabilities of each structural elements of the brides are calculated by using Monte-Carlo simulation method. Based on LCC evaluation considering various cost items of direct/indirect damage costs, the optimal design method of seismic isolated bridges is proposed. By using a sensitivity analysis about the design variables and a cost effectiveness evaluation in the viewpoint of LCC, the validity and the adequacy of proposed optimal design method are verified.

  • PDF

A Study on the Development of Life Cycle Cost Analysis Methodology in HVAC system for Decision Maker (의사 결정자를 위한 HVAC 시스템의 LCC 분석 방법론 개발에 관한 연구)

  • Jung, Soon-Sung
    • Journal of the Korean Solar Energy Society
    • /
    • v.24 no.4
    • /
    • pp.55-63
    • /
    • 2004
  • The purpose of this study is to development of life cycle cost analysis methodology of HVAC system for decision maker. The results of this study are as follows; maintenance/management, equipment construction, planning/design, and demolition/sell phases (1) To develop the cost breakdown structure for LCC in HVAC system, this study apply the method of additional pertinent level, title, CBS number, block number and variable index. (2) LCC analysis order of HVAC system compose four phase. (3) Life cycle costing influence diagram can bring us to make the most efficient decision through a visual graphical diagram that is shown relationship among variables and that decision maker traces easily from life cycle cost analysis situation.

Stochastic analysis for Real Rate Interest of Building Life Cycle Cost(LCC) with Monte-Carlo Simulation (몬테카를로 시뮬레이션을 이용한 건축물 생애주기비용(LCC)의 실질할인율에 대한 확률론적 분석)

  • Kim, Bum-Sic;Jung, Young-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.161-163
    • /
    • 2012
  • Recently on Value Engineering(VE) and Life Cycle Cost(LCC) social interests is increasing. The government Turn Key, BTL projects and public works projects, such as VE and LCC Analysis on the value and economic analysis is mandatory. And accordingly the VE and LCC analysis is underway for the various studies. However, there is a problem existing in the LCC analysis. Worth the cost varies according to the flow of time. However, the real interest rate during the LCC analysis of buildings in calculation time for interest rates and inflation are not considering the value of the flow. In other words, a few years using the average value of the deterministic analysis method has been adopted. These costs for the definitive analysis of the cost of an uncertain future, unforeseen changes resulting hazardous value. In this study of the last 15 years interest rates and inflation targeting by using Monte-Carlo Simulation is to perform probabilistic analysis. This potential to overcome uncertainties of the cost of building a more scientific and LCC Estimation of the probability value of the real interest rate is presented.

  • PDF