• Title/Summary/Keyword: Kyung-Bu High Speed Line

Search Result 20, Processing Time 0.024 seconds

Analysis on the Fluctuation and Frequency of Pressure for Korean High Speed Train passing through Tunnels (한국형 고속전철 터널 주행시의 압력 변동 및 빈도의 분석)

  • 박춘수;서승일;이억재;목진용;김기환
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.181-186
    • /
    • 2003
  • In order to develop a high speed train, various conditions have been considered. Fatigue strength assessment by the fluctuation of pressure is an important one. In this study, a numerical simulation has been performed to estimate the fluctuation and frequency of pressure when KHST(Korean High Speed Train)passes through tunnels in the Kyung-Bu high-speed railway. The simulation was based on KHST running the Kyung-Bu high-speed line with the speed of 350km/h and the interval of 10 minute headway. And the tunnel entrance speed was estimated by TPS program. Therefore, the fluctuation and frequency of pressure is expressed in Weibull distribution function in the above running situation. The result in this study would be good guidance to calculate the fatigue life and the index of reliability of body structure. We are going to conduct more study to measure the real value of the pressure of the carbody passing through tunnels, to assess the fatigue reliability and to develop method & procedure for the fatigue reliability design.

  • PDF

A Development of Pulley-type Tensioning Device for a High Speed Railway (고속용 풀리형식 장력조정장치 개발)

  • Cho, Yong-Hyeon;Kwon, Sam-Young;Park, Young;Lee, Ki-Won
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.723-730
    • /
    • 2006
  • In the electrical railway, the tension ascension of contact wire is essential to speed up of train and current collection performance of catenary largely depends on the tension. The tension variation rate of the tensioning device used in existing line limits within 5%, and the tension variation rate of the spring-type tensioning device installed at the section where tensioning length is short bounds within 15%. So it is urgent for us to localize it for high speed line, which the tension variation rate is limited within 3%. Therefore in this study, a pulley-type tensioning device for high speed line is developed. To verify the performance of developed device, a performance test, overload test and failure test is carried out under the code of the Kyung-Bu High Speed line. And it is secured durability performance through a fatigue test.

  • PDF

Analysis of Voltage Drop under Extended Feeding in KyungBu High Speed Line (I) (경부고속선의 전력공급 안정성 검토를 위한 연장급전 조건의 전압강하 검토 (I))

  • Kim, Joo-Rak;Lee, Chang-Mu;Jang, Dong-Uk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1432-1438
    • /
    • 2011
  • This paper presents the simulation of traction power supply system for the evaluation of voltage drop in Kyungbu high speed line. This simulation is performed in circumstance of extended feeding through vicinity substation. Extended feeding should be considered from design of system. Therefore, voltage drop at extended feeding must be accepted against regulation. In this paper, voltage drop is evaluated under condition of extended feeding targeting section from Shinchungju and Pyungtaek S/S.

  • PDF

Evaluation of Optimal Horizontal Alignment Considering Ride Comfort in Renewal of Curved Tracks (곡선부 선형개량 시 승차감을 고려한 최적평면선형 평가)

  • Um, Ju-Hwan;Choi, Il-Yoon;Lee, Jun S.
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.457-465
    • /
    • 2015
  • A method of evaluating the optimal alignment range while considering ride comfort when performing line renewal of curved tracks for speed-up is proposed in this study. The proposed method was applied to analyze the optimal renewal range for horizontal alignments with the smallest curve radii in the Kyung-Bu high-speed line; a parametric study on the effects of various initial design conditions on the permissible renewal range and optimal alignment range was also performed. From the analysis results, it was found that the permissible range is enhanced in proportion to the increase in the curve radius and the cant. It was also verified that a slight adjustment of the horizontal alignment enables speed-up even in the case of R7000/R8000, placed in the ballasted track section of the Kyung-Bu high-speed line.

Development of a Detail Design Software for High Speed Catenary System (I) (고속전차선로 상세설계 S/W 개발 (I))

  • 이기원;권삼영;김주락;김지윤;창상훈
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.341-346
    • /
    • 2001
  • This paper presents a concept design of detail design software for high speed catenary system. In this software, M.D.(mounting diagram) can be peformed and parts D/B can be also managed. french one, used in Kyung-bu high-speed line, is not good at user's interface, and the source code is not opened. So, it is impossible to use it in the different environment and catenary system. Through this program, automation of detail design and user's convenience can be derived.

  • PDF

Analysis on the Characteristics of Pressure Fluctuation for High Speed Train passing through Tunnels (고속열차가 터널내에서 받는 압력변동 특성 분석)

  • Park Choon-Soo;Seo Sung-Il;Kim Ki-Hwan;Lee Uk-Jae
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.690-695
    • /
    • 2004
  • In order to develop a high speed train, various conditions have been considered. Fatigue strength assessment by the fluctuation of pressure is an important one. In this study, the fluctuation and frequency of pressure is measured when KHST(Korean High Speed Train) passes through tunnels in the Kyung-Bu high-speed line. And the characteristics of pressure fluctuation is analysed and formulated. The results of analysis are as follows. The train entering speed and fluctuation value are related. The pressure increasing is generated in proportion to train velocity at leading car. When two train is passing through the tunnel, the pressure value is $1.5\~2$ times higher than one train is passing. The damping ratio of pressure fluctuation is about $92\%$. The number of pressure fluctuation in a tunnel is 4 to 6 times. The result in this study would be a good guidance to calculate the fatigue life and the reliability index of body structure.

  • PDF

A Study on the Loss and Damage Ratio of Railroad Tunnel Maintenance Monitoring Sensor (철도터널 유지관리 계측센서의 손망실율 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.262-270
    • /
    • 2018
  • Purpose: This paper investigates and analyzes the loss and damage ratio of maintenance monitoring sensor in metropolitan and high speed railroad tunnel in Korea and abroad. Method: After 5~6 years from the installation, the maintenance monitoring sensor on metropolitan transit tunnels showed the loss and damage ratio from 14.2% to 14.8% in Seoul metro line no. 5, 6, 7, 9, and 13.9% in UK channel tunnel. Based on the result, 15% is thought to be a proper set for the elapsed years, which is 5 years from the installation. Results: The maintenance monitoring sensor on high speed railroad tunnels showed the loss and damage ratio of 60.9% in Ho-Nam high speed railroad on 1 stage after 3 ~ 5 years from the installation, which was approximately 4 times as high as that of Seoul metro line no. 5, 6, 7, 9. Conclusion: Kyung-Bu high speed railroad on 2 stage, after 8~10 years from the installation, showed the loss and damage ratio of 66.8%. Based on the result, it can be inferred that the loss and damage ratio increases drastically after 5~10 years from the installation. Therefore, it is necessary to study on the loss and damage ratio of long term elapsed years, especially more than 10 years from the installation.

Study on the Speed Control Code Design for Fixed Block TCS (고정폐색 열차제어시스템 속도제어코드 설계에 관한 연구)

  • Lee, Kang-Mi;Shin, Kyung-Ho;Shin, Duc-Ko;Lee, Jae-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.37-41
    • /
    • 2012
  • Kyung-Bu High Speed Railway is operated in train control system(tcs) of fixed block operated in a way of dividing track circuits into several blocks in accordance with operation circumstances such as rolling stocks, grade, curves and facilities. The TCS of fixed block system refers to a continuous train control system, which transfers operational information such as entry and exit speed, distance-to-go, and deceleration etc. into on-board train control equipment on the basis of block occupancy of a preceding train. It guarantees a safe operation of trains by giving an emergency braking order, in case that a train exceeds an entry and exit speed of a corresponding block. In this paper, we analyze the speed control code deducing in accordance with maximum operation speed and characteristics of rolling stocks by analyzing principles of generation of speed control code allocated in blocks for safe operation, then train operational efficiency was analyzed by means of analysis of operation headway in accordance with the deduced speed control code. This study will be used to design in case of getting an increase in speed for existing high speed line or new high speed line TCS.

Development of a Pulley-type Tensioning Device (도르래식 장력조정장치 개발)

  • Lee, Ki-Won;Cho, Yong-Hyeon;Park, Young
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.663-669
    • /
    • 2009
  • In the electrical railway, the increase of tensions in an overhead contact lines is essential to speed-up of train, because current collection quality largely depends on the ratio of a wave propagation speed to a train speed. For Kyungbu high-speed line, a pulley-type tensioning device is required to have a tension variation of maximum 3%. Therefore we developed a pulley-type tensioning device in order to meet tension variation requirement of the high-speed tensioning device. To verify the performance of the developed device, a performance test, overload test and failure test were carried out according to the factory test procedure of the Kyung-Bu High-speed line. Furthermore, we also performed reliability performance through not only a fatigue test in a factory, but also on-line verification test in Chungbuk line for over 1 year. These tests verified that the tensioning device had applicability to a main line.

Analysis of Voltage Drop under Extended Feeding in KyungBu High Speed Line (II) (경부고속선의 전력공급 안정성 검토를 위한 연장급전 조건의 전압강하 검토 (II))

  • Kim, Joo-Rak;Chang, Sang-Hoon;Park, Hyun-June;Lee, Young-Heum
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1984-1990
    • /
    • 2011
  • This paper presents the simulation of traction power supply system for the evaluation of voltage drop in Kyungbu high speed line. This simulation is performed in circumstance of extended feeding through vicinity substation. Extended feeding should be considered from design of system. Therefore, voltage drop at extended feeding must be accepted against regulation. In this paper, voltage drop is evaluated under condition of extended feeding targeting section from Shinchungju and Pyungtaek S/S.

  • PDF