• 제목/요약/키워드: Kyung-Bu High Speed Line

검색결과 20건 처리시간 0.031초

한국형 고속전철 터널 주행시의 압력 변동 및 빈도의 분석 (Analysis on the Fluctuation and Frequency of Pressure for Korean High Speed Train passing through Tunnels)

  • 박춘수;서승일;이억재;목진용;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(I)
    • /
    • pp.181-186
    • /
    • 2003
  • In order to develop a high speed train, various conditions have been considered. Fatigue strength assessment by the fluctuation of pressure is an important one. In this study, a numerical simulation has been performed to estimate the fluctuation and frequency of pressure when KHST(Korean High Speed Train)passes through tunnels in the Kyung-Bu high-speed railway. The simulation was based on KHST running the Kyung-Bu high-speed line with the speed of 350km/h and the interval of 10 minute headway. And the tunnel entrance speed was estimated by TPS program. Therefore, the fluctuation and frequency of pressure is expressed in Weibull distribution function in the above running situation. The result in this study would be good guidance to calculate the fatigue life and the index of reliability of body structure. We are going to conduct more study to measure the real value of the pressure of the carbody passing through tunnels, to assess the fatigue reliability and to develop method & procedure for the fatigue reliability design.

  • PDF

고속용 풀리형식 장력조정장치 개발 (A Development of Pulley-type Tensioning Device for a High Speed Railway)

  • 조용현;권삼영;박영;이기원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.723-730
    • /
    • 2006
  • In the electrical railway, the tension ascension of contact wire is essential to speed up of train and current collection performance of catenary largely depends on the tension. The tension variation rate of the tensioning device used in existing line limits within 5%, and the tension variation rate of the spring-type tensioning device installed at the section where tensioning length is short bounds within 15%. So it is urgent for us to localize it for high speed line, which the tension variation rate is limited within 3%. Therefore in this study, a pulley-type tensioning device for high speed line is developed. To verify the performance of developed device, a performance test, overload test and failure test is carried out under the code of the Kyung-Bu High Speed line. And it is secured durability performance through a fatigue test.

  • PDF

경부고속선의 전력공급 안정성 검토를 위한 연장급전 조건의 전압강하 검토 (I) (Analysis of Voltage Drop under Extended Feeding in KyungBu High Speed Line (I))

  • 김주락;이장무;장동욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1432-1438
    • /
    • 2011
  • This paper presents the simulation of traction power supply system for the evaluation of voltage drop in Kyungbu high speed line. This simulation is performed in circumstance of extended feeding through vicinity substation. Extended feeding should be considered from design of system. Therefore, voltage drop at extended feeding must be accepted against regulation. In this paper, voltage drop is evaluated under condition of extended feeding targeting section from Shinchungju and Pyungtaek S/S.

  • PDF

곡선부 선형개량 시 승차감을 고려한 최적평면선형 평가 (Evaluation of Optimal Horizontal Alignment Considering Ride Comfort in Renewal of Curved Tracks)

  • 엄주환;최일윤;이준석
    • 한국철도학회논문집
    • /
    • 제18권5호
    • /
    • pp.457-465
    • /
    • 2015
  • 본 연구에서는 기존선 속도향상을 위한 곡선부 개량 시 승차감을 고려한 최적평면선형범위에 대한 평가방안을 제시하였다. 또한 다양한 선형설계 초기조건들이 허용개량범위와 승차감 측면에서 최적선형 범위에 미치는 영향을 파악하기 위한 매개변수 해석을 수행하였다. 이와 더불어 현재 경부고속선에 부설되어 있는 선형조건들 중 가장 작은 곡선반경을 가진 평면선형들에 대하여 최적 개량범위를 검토하였다. 해석결과, 주요 초기선형설계변수인 곡선반경과 캔트가 클수록 허용개량범위와 최적선형범위가 넓어짐을 알 수 있었으며, 경부고속선 자갈도상구간에 부설되어 있는 R7000/R8000의 경우에도 선형측면에서는 약간의 개량으로도 속도향상이 가능함을 알 수 있었다.

고속전차선로 상세설계 S/W 개발 (I) (Development of a Detail Design Software for High Speed Catenary System (I))

  • 이기원;권삼영;김주락;김지윤;창상훈
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 춘계학술대회 논문집
    • /
    • pp.341-346
    • /
    • 2001
  • This paper presents a concept design of detail design software for high speed catenary system. In this software, M.D.(mounting diagram) can be peformed and parts D/B can be also managed. french one, used in Kyung-bu high-speed line, is not good at user's interface, and the source code is not opened. So, it is impossible to use it in the different environment and catenary system. Through this program, automation of detail design and user's convenience can be derived.

  • PDF

고속열차가 터널내에서 받는 압력변동 특성 분석 (Analysis on the Characteristics of Pressure Fluctuation for High Speed Train passing through Tunnels)

  • 박춘수;서승일;김기환;이억재
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 춘계학술대회 논문집
    • /
    • pp.690-695
    • /
    • 2004
  • In order to develop a high speed train, various conditions have been considered. Fatigue strength assessment by the fluctuation of pressure is an important one. In this study, the fluctuation and frequency of pressure is measured when KHST(Korean High Speed Train) passes through tunnels in the Kyung-Bu high-speed line. And the characteristics of pressure fluctuation is analysed and formulated. The results of analysis are as follows. The train entering speed and fluctuation value are related. The pressure increasing is generated in proportion to train velocity at leading car. When two train is passing through the tunnel, the pressure value is $1.5\~2$ times higher than one train is passing. The damping ratio of pressure fluctuation is about $92\%$. The number of pressure fluctuation in a tunnel is 4 to 6 times. The result in this study would be a good guidance to calculate the fatigue life and the reliability index of body structure.

  • PDF

철도터널 유지관리 계측센서의 손망실율 연구 (A Study on the Loss and Damage Ratio of Railroad Tunnel Maintenance Monitoring Sensor)

  • 우종태
    • 한국재난정보학회 논문집
    • /
    • 제14권3호
    • /
    • pp.262-270
    • /
    • 2018
  • 연구목적: 본 연구는 국내와 국외의 도시 및 고속철도터널 유지관리 계측센서의 손망실 현황을 조사하고 분석을 실시하였다. 연구방법: 도시철도터널 유지관리 계측센서 설치 후 5년에서 6년의 손망실율은 서울 지하철5,6,7,9호선은 14.2%에서 14.8%, 영국의 Channel tunnel은 13.9%로 거의 유사하게 나타나 5년 경과연수에서는 15%로 설정하는 것이 타당한 것으로 판단된다. 연구결과: 고속철도터널 유지관리 계측센서 설치 후 3년에서 5년의 손망실율은 호남고속 철도1단계 에서 60.9%로 서울지하철5,6,7,9호선의 4배 이상 크게 나타났다. 결론: 8년에서 10년의 경부고속철도2단계에서는 66.8%로 나타나 5년에서 10년 사이에 급격하게 증가하므로 향후 10년 이상 장기간의 경과연수에 따른 계측항목별 손망실율 연구가 필요할 것으로 판단된다.

고정폐색 열차제어시스템 속도제어코드 설계에 관한 연구 (Study on the Speed Control Code Design for Fixed Block TCS)

  • 이강미;신경호;신덕호;이재호
    • 한국철도학회논문집
    • /
    • 제15권1호
    • /
    • pp.37-41
    • /
    • 2012
  • 경부고속철도는 운영환경(차량,구배,곡선,시설물 등)에 따라 궤도회로를 여러 개의폐색으로 분할하여 운행하는 고정폐색방식의 열차제어시스템으로 운행된다. 고정폐색방식 열차제어시스템은 선행열차의 점유폐색을 기준으로 진입/진출폐색속도, 목표거리, 감속도와 같은 운행정보를 차상열차제어장치로 전송하여 연속적으로 열차를 제어하는 방식으로, 경부고속철도 열차제어시스템은 열차가 해당 폐색의 진입/진출속도를 초과할 경우, 비상제동명령을 내려 열차의 안전한 운행을 보장한다. 본 논문에서는 안전한 운행을 위해 폐색에 할당되는 속도제어코드의 생성원리를 분석하여, 최고운행속도와 운행차량특성에 따른 속도제어코드를 도출하고, 도출된 속도제어코드에 따른 운행시격 분석을 통해 열차 운행효율을 분석하였다. 이와 같은 연구는 기존 고속철도의 증속 및 신규 고속철도 열차제어시스템 설계 자료로 활용될 수 있다.

도르래식 장력조정장치 개발 (Development of a Pulley-type Tensioning Device)

  • 이기원;조용현;박영
    • 한국철도학회논문집
    • /
    • 제12권5호
    • /
    • pp.663-669
    • /
    • 2009
  • 전기철도에서 열차의 속도향상을 위하여 전차선의 장력상승은 필수적이며, 전차선로의 집전성능은 장력에 따라 크게 좌우한다. 경부고속철도에서 사용하고 있는 도르래식 장력장치는 장력변동율이 3% 이내로 규정되어 있고, 전량 수입에 의존하고 있다. 따라서 고속선에서의 장력변동을 요구소건을 만족하는 도르래식 장력조정장치를 개발하였다. 개발한 장력조정장치의 성능을 확인하기 위하여 경부고속철도 장력조정장치의 규격에 따라 성능시험, 내하중 시험 및 파단시험을 수행하였다. 장력조정장치의 신뢰성을 확보하기 위하여 공장에서의 피로시험과 충북선 본선에서 1 년 이상을 시범설치, 운영하였다. 이들 시험을 통하여 개발된 장력조정장치가 신뢰성을 가지며 본선에 적용할 수 있다는 것을 입증하였다.

경부고속선의 전력공급 안정성 검토를 위한 연장급전 조건의 전압강하 검토 (II) (Analysis of Voltage Drop under Extended Feeding in KyungBu High Speed Line (II))

  • 김주락;창상훈;박현준;이영흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1984-1990
    • /
    • 2011
  • This paper presents the simulation of traction power supply system for the evaluation of voltage drop in Kyungbu high speed line. This simulation is performed in circumstance of extended feeding through vicinity substation. Extended feeding should be considered from design of system. Therefore, voltage drop at extended feeding must be accepted against regulation. In this paper, voltage drop is evaluated under condition of extended feeding targeting section from Shinchungju and Pyungtaek S/S.

  • PDF